12 December 1987; 37 years ago (1987-12-12) (as part of North–South Line) 4 November 1989; 35 years ago (1989-11-04) (renamed as East–West Line) 6 July 1990; 34 years ago (1990-07-06) (Initial line complete) 10 January 2001; 23 years ago (2001-01-10) (Expo) 18 October 2001; 23 years ago (2001-10-18) (Dover) 8 February 2002; 22 years ago (2002-02-08) (Changi Airport) 28 February 2009; 15 years ago (2009-02-28) (Boon Lay extension) 18 June 2017; 7 years ago (2017-06-18) (Tuas West extension)
Constructed and opened as part of the North–South Line (NSL) in the early stages of development, the East–West Line was the second rail line formed in Singapore after NSL, with the opening of the eastern extension to Tanah Merah on the EWL in 1989. Nevertheless, both lines use identical signalling equipment and rolling stock. The East–West Line signalling systems have been upgraded along with the North–South Line, with both MRT lines having its signalling fully upgraded, converting it from semi-automatic to fully automatic.
History
Initial developments
The first segment of what would become the East–West Line, between City Hall and Outram Park stations, was opened on 12 December 1987 as part of the North–South Line and Phase 1 of the initial system.[3][4] Subsequently, it was extended westwards to Clementi station on 12 March 1988[4] and to Lakeside on 5 November 1988.[5]
The 15-kilometre (9.3 mi) eastern extension to Tanah Merah station opened on 4 November 1989, which also marked the start of independent operations as the East–West Line.[5] The opening ceremony was attended by then First Deputy Prime Minister Goh Chok Tong.[6][7]
The 6-kilometre (3.7 mi) line extension to Pasir Ris station was opened ahead of schedule on 16 December 1989[7][8] with a sneak preview beforehand.[9]Boon Lay station opened on 6 July 1990, marking the completion of the initial MRT system.[10]
Construction on a new infill station located between Buona Vista station and Clementi station, namely Dover station, began in June 1998. It is the first station in the MRT network to be built as an infill station.[11] The building of the station was met with reservations by some members of the public over the small area it serviced and there were criticisms over the spending of "taxpayers' money" chiefly for use only by students of one educational institution.[12] Despite some opposition, the Land Transport Authority proceeded with the construction to serve commuters along Singapore Polytechnic with Dover housing estate.[13][14] The station opened on 18 October 2001.[15] Prior to opening, test runs were conducted from 13 to 17 October 2001 when the trains stopped at the station but did not open their doors.
Tanah Merah to Airport extension line
The idea of extending the Mass Rapid Transit system to Changi Airport was reconsidered when Terminal 3 of the airport was being built.[16] Earlier plans had long been made for a new line branching off from the existing East–West Line at Tanah Merah,[17] with some conceptual plans showing a tentative route alignment up to the airport along Airport Boulevard, continuing beyond the airport to Changi Point, before turning southwest back towards the city along the eastern coasts. The plans were finally announced by then Deputy Prime MinisterLee Hsien Loong on 15 November 1996.[18] However, the new route alignment showed a deviation from previous plans,[19][20] where the final plan involved in building only the first two stations of Expo, and Changi Airport, the latter being the underground station built between Terminal 2 and Terminal 3. The alignment of the station at the airport also switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station. The station's designs were unveiled on 10 February 1998 with construction starting on 29 January 1999.[21][22] Expo and Changi Airport were opened on 10 January 2001 and 8 February 2002 respectively and operates under a shuttle service. Prior to 22 July 2003, train services from Boon Lay commences after the opening, but were later reverted to shuttle services due to low patronage.[23][24] On 25 May 2019, it was announced that the Changi Airport Extension will be converted to become part of Thomson-East Coast line Extension (TELe) by 2040.[25][26][27]
Boon Lay and Tuas extension
The 3.8-kilometre (2.4 mi) Boon Lay extension was first announced by the LTA on 29 December 2004, set to serve residents from the Jurong West Town area and those working in the Jurong Industrial Estate.[28] The two stations, Pioneer and Joo Koon stations, officially opened on 28 February 2009.[29][30]
On 11 January 2011, the Tuas West extension, an extension of the East–West Line from Joo Koon to Tuas Link was announced.[31] The extension has a span of 7.5 kilometres (4.7 mi), which spans a twin-tracked MRT viaduct, four above-ground stations and a 26-hectare (64-acre) depot to provide stabling and maintenance facilities for the additional trains that will be bought for the extension and to cater for future expansion of the line.[32] The viaduct is integrated with part of a 4.8-kilometre-long (3.0 mi) road viaduct along Pioneer Road, which will increase the road capacity to cope with anticipated increase in traffic. The stations are Gul Circle, Tuas Crescent, Tuas West Road, and Tuas Link. On 4 May 2012, the Land Transport Authority marked the start of construction of the Tuas West extension with a groundbreaking ceremony at the site of the future Tuas Link station.[33][34]
The extension began service on 18 June 2017.[35][36][37] During initial stages after opening, the westbound trains will alternate their terminus between Joo Koon and Tuas Link, where for every two trains, one train will terminate at the former, while the other train will terminate at the latter.[38]
Additional platform at Tanah Merah station
On 25 August 2014, the Land Transport Authority announced that a new platform will be constructed at Tanah Merah, enabling faster travel and shorter waiting times for commuters heading towards Expo and Changi Airport on the Changi Airport branch line of the East–West Line.[39]
On 26 October 2016, the Land Transport Authority awarded the civil contract to Lum Chang Building Contractors Pte. Ltd. to build a new platform at Tanah Merah and viaducts for a contract sum of S$325 million. In addition to the new platforms, the existing East–West Line tracks will be extended to connect the line to the new four-in-one East Coast Integrated Depot at Changi.[40] When completed in 2024, it will be the second station to have triple island platforms after Jurong East.
Half-height platform screen door installations
There were calls for platform screen doors (PSDs) to be installed at above-ground stations after several incidents in which passengers were killed or seriously injured by oncoming trains when they fell onto the railway tracks at above-ground stations. Underground stations already featured the doors since 1987. The authorities initially rejected the proposal by casting doubts over functionality and concerns about the high installation costs,[41] but made an about-turn later with the government announcing plans to install half-height platform screen doors on the elevated stations on 25 January 2008, citing lower costs due to it becoming a more common feature worldwide.[42] They were first installed at Jurong East, Pasir Ris, and Yishun stations in 2009 as trial runs.[43][44] On 31 August 2011, the LTA announced completion of the installation of PSDs along the East–West Line, with Expo being the last station on the line to receive the PSDs.[45] Installation of PSDs across both the North–South and East–West lines (NSEWL) were completed on 14 March 2012, 3 months ahead of schedule.[46]
Improvement works
Timber to concrete sleeper replacement works
The timber sleepers on the East–West Line was required to be replaced as they were near the end of their 25-year lifespan. The replacement sleepers, made of concrete, have a significantly longer lifespan.[47] To speed up works, train services on the East–West Line was adjusted to end earlier. The work was divided into three phases: Phase 1 (Bugis – Tanah Merah), Phase 2 (Joo Koon – Jurong East, Tanah Merah – Pasir Ris) and Phase 3 (Jurong East – Outram Park). The sleepers were fully replaced on 18 February 2017.[48]
Re-signalling works
A new moving-block signalling system, supplied by Thales, replaced the former ageing fixed-block signalling system on the East–West Line. The new signalling system, costing $195 million, reduces waiting times for trains during peak periods from 120 seconds then to 100 seconds now.[49] The new system became operational between Pioneer and Tuas Link stations on 18 June 2017. Newer rolling stocks, such as the C151B and C151C, are equipped for use solely on the new signalling system.[50] Since 27 May 2018, the new signalling system has been operating full-day on the entire East–West Line.
Third-rail replacement
Replacement works on the third rail, which provides electricity to the trains, were carried out between September 2015 and August 2017.[51] The new third rail replaced its 30-year-old predecessor and is expected to increase reliability of the East–West line's electrical system.[52]
Pasir Ris turnback extension
A new railway turnback located at Pasir Ris station, the eastern terminus of the line, was announced by the Land Transport Authority on 29 Jun 2018. It would extend the railway viaduct past the station by 148 metres (486 ft).[53] The turnback will allow for an increase in service frequency during peak times from 30 to 36 trains per hour as trains will be able to change directions faster to head westwards on the line, to meet future increases in ridership demand. Construction started in 2019 and was completed in May 2024.[54]
On 5 August 1993, before opening, a maintenance vehicle spilt oil on the tracks between Clementi and Jurong East. The first ten eastbound trains reported braking problems, then the eleventh train from Jurong stopped at the Clementi station for two minutes longer than scheduled due to it using its emergency brakes to stop at the station at 7.50 am, before being hit by another eastbound train when it failed to stop in time. 156 passengers were injured by the collision.[55]
7 July 2015 power trip
During the evening peak hours on 7 July 2015, train services on the East–West and North–South Lines were temporarily disrupted due to massive power trips detected along both lines. The cause of the disruption was due to damaged insulators which had resulted in the failure of the power supply.[56] For this disruption that brought inconvenience to 413,000 commuters, LTA imposed a 'record' fine of S$5.4 million on SMRT.[57]
At about 11:08 a.m. on 22 March 2016, two SMRT track-maintenance trainee staff were run over and killed by a C151 train approaching Pasir Ris station,[58] resulting in a temporarily service delay between Tanah Merah and Pasir Ris for over two hours that affected at least 10,000 commuters.[59]
The two trainee staff had joined SMRT in January 2016 and worked as technicians under a technical team of 15 staff led by a supervisor and were tasked to go down to the tracks to investigate an alarm triggered by a possible signalling equipment fault close by the station. An operator cited that they were granted access to the tracks, but did not coordinate with a Signal Unit in the station to ensure trains could not travel in the area where the team was.[60]
Patrick Nathan, SMRT vice-president, promised that "SMRT will review all safety protocols particularly those involving track access".[61] SMRT chief executive Desmond Kuek apologised for the incident and said SMRT will investigate how "the [two men] got hit by the train". SMRT fired both an engineer responsible for leading with the team and the train driver who was involved at the scene of the incident.
The engineer who led the inspection team was charged with negligence causing death under the Penal Code[62] and was subsequently sentenced to 4 weeks in jail.[63] SMRT Trains and one member of SMRT management were charged for violating the Workplace Safety and Health Act for lapses which led to the accident,[62] and were fined $400,000 respectively.[64] and $55,000.[65] On 20 July 2018, the Land Transport Authority fined the operator S$1.9 million (US$1.41 million) for this incident and the Bishan tunnel flooding.[66][67]
A second train collision occurred on 15 November 2017 at approximately 8.18am, where two C151A trains collided at Joo Koon MRT station. A train fault caused the first train heading in the direction of Tuas Link to stall at the station. A minute later, a second train stopped behind the first and then "moved forward unexpectedly," hitting the other train. Thirty-eight people, including two SMRT staff, were hospitalized.[68][69][70][71][72][73]
Train services between Tuas Link and Joo Koon stations were temporally suspended in both directions for two hours on the day itself and the entire day on 16 November 2017, and westbound trains temporarily terminated at Joo Koon.[74][75]
An update by the Land Transport Authority (LTA) & SMRT on 16 November 2017 stated that LTA and SMRT had decided to isolate for up to one month the operations of the Tuas West extension, which runs on the new signalling system, from the rest of the East–West Line, which runs on the old signalling system, enabling LTA engineers to carry out further assurance checks together with Thales. The train was switching systems when the collision took place.[76] Train service on the line resumed on 20 November, with the Tuas West extension between Gul Circle and Tuas Link using the new signalling system and the section between Pasir Ris and Joo Koon, together with the Changi Airport Branch continuing to run on the old signalling system. Train services between Joo Koon and Gul Circle were temporarily suspended until its resumption on 28 May 2018; between the suspension a free bridging bus service is available between the two stations. Continuous service between Pasir Ris and Gul Circle resumed on 28 May 2018, with the permanent activation of the new CBTC system; since the incident, selected portions of either the North–South Line or East–West Line were closed to conduct track renewal works with early weekend closures and later station openings.[77]
25-30 September 2024 train derailment and disruptions
Train services between Boon Lay and Queenstown had been suspended since 9am on 25 September 2024 after trains lost power on a stretch near Clementi MRT station. A defective train axle box on one of the first generation C151 trains, which had been deadheading to Ulu Pandan Depot after it was withdrawn at Clementi station, dropped onto the tracks near Dover station and caused the wheels of a bogie - an undercarriage - to come off the running rail and hit track equipment, including stretches of the third rail, 3 point machines as well as power cables and rail clips.[78][79] In an update at about 9:30pm on 25 September 2024, LTA and SMRT announced that train services between Buona Vista and Jurong East would remain suspended on 26 September 2024, the 1st day of the PSLE exams, while service between Boon Lay and Jurong East, and Queenstown and Buona Vista, would each run their own separate shuttle services every 10 minutes.[79][80][81] On Thursday night, SMRT announced that no trains will run between Jurong East and Buona Vista for a third straight day, with full service expected to resume the following Monday. However, in an update at about 4:30pm on 29 September 2024, the target date for restoration of full service was pushed back to Tuesday.[82][83] On September 30, SMRT and LTA announced that full service would fully resume on October 1, with westbound train speeds being reduced from the usual 60-80 kilometres per hour (37.5-50mph) to 40 kilometres per hour (25mph) until October 3, as part of a standard process after rail replacements. [84]
Network and operations
Train services on the East–West Line operates from approximately 5:30am to around midnight daily. In general, during peak hours, train frequency is 2 to 3 minutes while during non-peak hours the frequency is reduced to 5 minutes throughout the entire route.[85]
The first train departs from these places:
From
Heading to
Departing at
Notes
Tanah Merah
Pasir Ris
4:59 am - Weekdays 5:01 am - Saturdays 5:27 am - Sundays & Public Holidays
5:12 am (Weekdays), 5:14 am (Saturdays) and 5:40 am (Sundays & Public Holidays) as a downroute from Pasir Ris to reach Jurong East at 6:07 am (Weekdays), 6:09 am (Saturdays) and 6:33 am (Sundays & Public Holidays)
Tanah Merah
Changi Airport
5:07 am - Weekdays 5:07 am - Saturdays 5:31 am - Sundays & Public Holidays
Reach one-loop at 5:29 am (Weekdays and Saturdays) and 5:52 am (Sundays and Public Holidays).
Clementi
Tanah Merah
5:25 am - Weekdays 5:26 am - Saturdays 5:56 am - Sundays & Public Holidays
Tuas Link
Clementi
5:03 am - Weekdays 5:04 am - Saturdays 5:35 am - Sundays & Public Holidays
Train services on the East–West Line are also subjected to maintenance and renewal works, usually on selected Fridays, Saturdays or Sundays. Shuttle bus services may be provided throughout the duration of the early closures and late openings for affected commuters.[86] Operations of the East–West Line are affected by the COVID-19 pandemic, leading to the drop of ridership.[87][88]
Route
As its name implies, the East–West Line connects central Singapore to both eastern and western parts of the island, with an additional branch between Changi Airport and Tanah Merah, which operates as a separate shuttle service. It is 57.2 kilometers (35.5 miles) long and it is predominantly double-tracked, but certain short sections at Tanah Merah, Outram Park and Joo Koon widens to three tracks, four tracks nearby Jurong East station and a section between Jurong East and Clementi station and five tracks nearby Changi Depot and Tanah Merah station.
The line begins above ground at Pasir Ris station from where it continues to head south towards Simei station. The line curves between Simei to Tanah Merah stations and continues westwards, joining the Changi Airport branch, paralleling New Upper Changi Road. Two branch lines to Changi Depot and to Changi Airport station exists between Simei and Tanah Merah stations. At Tanah Merah station, the line extends to four tracks due to its interchange with the Changi branch before turning back into two tracks in a western direction.
From Bedok station to Kembangan station, the line goes underground but then goes above-ground, and follows the route of Sims Avenue and Sims Avenue East in an opposite direction. After Kallang station, the line goes underground through the Central Area and runs heads south-west towards City Hall station. It then runs parallel to the North–South Line between City Hall and Raffles Place stations, which are cross-platform interchanges to the North–South Line. After Tanjong Pagar, the line curves northwestwards towards Outram Park. After Tiong Bahru, the line continues above ground starting with Redhill station and follows the direction of Commonwealth Avenue, Commonwealth Avenue West and Boon Lay Way. Between Clementi and Jurong East station, three branches (one going east and two going west) to Ulu Pandan Depot are deployed. At Jurong East station, the line extends again to four tracks due to its interchange with the North-South line but then, separates into two before heading west to Chinese Garden station. After Pioneer station, the line heads south-west before curving westwards towards Joo Koon station. The line terminates at Tuas Link with a branch heading towards Tuas Depot.
The Changi Airport extension starts at Tanah Merah station as a single track before turning eastwards to Expo station. After Expo station, it goes underground and curves south before terminating at Changi Airport station.
The line serves 35 stations across 57.2 kilometres (35.5 mi) of track, and station codes for the line are green, corresponding to the line's colour on the system map.[89][90] 8 stations, including Changi Airport, and 7 other stations on the stretch from Lavender to Tiong Bahru are underground, with the rest being elevated. With the exception of Dover, all stations have island platforms.
SMRT used to operate the branch sector of Tanah Merah to Changi Airport as a through service from Boon Lay from 18 November 2001 until 22 July 2003, when it was replaced with a shuttle service. By 2040, the Changi Airport line (CAL) will be converted to the Thomson-East Coast line.[26][27]
Both the North–South and the East–West lines utilized identical rolling stock up until the 2010s, when the C151A trains were temporary suspended from operating on the North–South Line from January 2012 until November 2013 following the 2011 train disruptions.[110][111][112][113][114][115] The C151B trains, which were introduced in April 2017, did not begin revenue service on the full stretch of the East–West Line until the line's trial of the CBTC signalling system in May 2018.[116][117][118] The C151C trains, despite their introduction on 30 September 2018 on the North–South Line, only made their full day debut on the East–West Line on 4 November 2023.[119][120]
Another generation of rolling stock, the R151 trains, will be delivered from 2022 to 2026, to replace all 66 first-generation C151 trains which will be retired by 2025, as well as all 19 second-generation C651 and 21 third-generation C751B trains which were fully phased out by 2024. The R151 trains are the first rolling stock on the East–West Line to be manufactured by Bombardier (Bought by Alstom in 2021), which has also supplied trains for the Downtown Line.[121][122][123] The first train entered service on the East–West Line on 4 June 2023.[124]
The stretch of track between Pioneer and Tuas Link stations was equipped with the new signalling system which came into use in June 2017. As the section of track between Pioneer and Joo Koon support 'mixed-mode' of both signalling systems, trains terminating at either Joo Koon or Tuas Link would have to change signalling modes at Pioneer MRT station as trains terminating at Joo Koon would proceed to a turn back siding which was built as part of the TWE which only supports the new signalling system. Eastbound trains towards Pasir Ris would have to change back to the old signalling system at Pioneer MRT station. This procedure was removed after the train collision at Joo Koon as trains terminated at Joo Koon. The new signalling system became fully operational on 28 May 2018.[77]
Platform screen doors
When the line was first opened, full-height platform screen doors supplied by Westinghouse were installed at underground stations. These doors serve to prevent suicides, enable climate control within the station, better security control by restricting access to the tunnels and tracks and for overall passenger safety considerations.[130] The authorities initially rejected calls for platform screen doors to be installed at elevated stations by casting doubts over functionality and concerns about the high installation costs.[131] Nevertheless, the LTA reversed its decision and made plans to install half-height platform screen doors on elevated stations on 25 January 2008.[132][133] The first platform screen doors by ST Electronics were installed at Pasir Ris, Jurong East and Yishun stations in 2009 as trial runs.[134] Subsequently, installation began in May 2011 at Ang Mo Kio station on the North–South Line. On 14 March 2012, platform screen doors became operational at all elevated stations on the East–West Line.[135] Stations along the TWE had half-height platform screen doors manufactured by Fangda installed during the station's construction.[136]
^Rav, Dhaliwal (12 December 1987). "Shopping for Xmas the MRT way..."Straits Times. Archived from the original on 24 January 2018. Retrieved 19 September 2017 – via eResources.
^Singapore, National Library Board. "First MRT accident – Infopedia". eresources.nlb.gov.sg. Archived from the original on 19 October 2021. Retrieved 13 March 2018.
^ abNg, Kelly (2 December 2016). "SMRT charged over fatal accident". Today. Archived from the original on 17 November 2017. Retrieved 17 November 2017. SMRT Trains and its director of control operations, Teo Wee Kiat, who is still employed by the company, were charged with failing to take necessary measures to ensure workers' safety under the Workplace Safety and Health Act (WSHA). Lim Say Heng, who was in charge of the work team that went onto the tracks that fateful day, was charged with causing death by a negligent act under the Penal Code.
^ abCheng, Kenneth (26 September 2024). "Train disruption on EWL to go into third day; LTA, SMRT aim to partially restore services on Sept 27". The Straits Times. Retrieved 26 September 2024. It was triggered by a first-generation Kawasaki Heavy Industries train, which encountered a fault at around 9am on Sept 25 and was withdrawn to Ulu Pandan Depot, said LTA and SMRT in a statement. While en route to the depot, a defective axle box on the third carriage of the six-carriage train dropped onto the tracks near Dover station, causing one bogie to come off the running rail. This is the first time such an incident has happened. With one bogie derailed, the train - which has been in service for more than 35 years - damaged the tracks and equipment on the tracks as it was being withdrawn from service. Engineers found a total of 34 rail breaks, such as cracks or chips, along 1.6km of tracks between Clementi and Dover stations after overnight checks. The train also damaged three point machines that are used to divert the train to different tracks, stretches of the third rail which supplies power to trains, as well as power cables and rail clips.
لمعانٍ أخرى، طالع علي بن أبي طالب (توضيح). هذه المقالة عن علي بن أبي طالب رابع الخُلفاء الراشدين وأوَّل أئمة الشيعة. لمعانٍ أخرى، طالع علي (توضيح). هذه المقالة عن حيدرة. لمعانٍ أخرى، طالع حيدرة (توضيح). علي بن أبي طالب تخطيط لاسم علي بن أبي طالب بخط الثلث ملح...
جوشوا فاجنومان معلومات شخصية الميلاد 11 ديسمبر 2000 (23 سنة) هامبورغ الطول 1.87 م (6 قدم 1 1⁄2 بوصة)[1][1] مركز اللعب مدافع الجنسية ألمانيا معلومات النادي النادي الحالي شتوتغارت الرقم 4 مسيرة الشباب سنوات فريق 2009 SC Poppenbüttel[2] 2009–2010 Hummelsbütteler SV 2010–2...
River bridge in Assam, India Bogibeel BridgeCoordinates27°24′31″N 94°45′37″E / 27.40861°N 94.76028°E / 27.40861; 94.76028Carries NH 15CrossesBrahmaputra RiverLocaleAssam, IndiaCharacteristicsDesignTruss bridgeMaterialSteel, ConcreteTotal length4.94 kilometres (3.07 mi)Longest span125 m (410 ft)No. of spans41HistoryDesignerRITESConstructed byHindustan Construction Company (HCC) and Gammon IndiaConstruction start21 April 2002Opened25 December 2...
Defunct railway company This article is about the Irish railway. For other railways with the same name, see Great Northern Railway. Great Northern Railway (Ireland)IndustryRail transportPredecessor Irish North Western Railway Northern Railway of Ireland Ulster Railway Founded1876Defunct1958; 65 years ago (1958)FateDissolvedSuccessor Ulster Transport Authority (Northern Ireland) Córas Iompair Éireann (Republic of Ireland) HeadquartersDublin , Republic of Ireland P...
هذه المقالة بحاجة لصندوق معلومات. فضلًا ساعد في تحسين هذه المقالة بإضافة صندوق معلومات مخصص إليها. حرب الأرض (بالأيرلندية: Cogadh na Talún) هي فترة من الاضطراب الزراعي في أرياف آيرلندا (والتي كانت حينها جزءًا من المملكة المتحدة) بدأت عام 1879. قد يشير المصطلح إلى الفترة الأولى والأع...
Questa voce sull'argomento partiti politici europei è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Gruppo del Partito del Socialismo Europeo Stato Unione europea Fondazione21 aprile 1993 Dissoluzione23 giugno 2009 Confluito inAlleanza Progressista dei Socialisti e dei Democratici PartitoPartito del Socialismo Europeo IdeologiaSocialdemocrazia CollocazioneCentro-sinistra / Sinistra Modifica dati su Wikidata · Manuale Il Gruppo del P...
American comedian (born 1995) Andrew DismukesDismukes in 2021BornAndrew Vincent Dismukes (1995-06-21) June 21, 1995 (age 28)Houston, Texas, U.S.Alma materUniversity of Texas at Austin (BS)OccupationsComedianwriteractorYears active2013–presentKnown forSaturday Night Live Andrew Vincent Dismukes (/dɪzˈmjuːks/; born June 21, 1995)[1][2] is an American comedian, actor, and writer. Dismukes was hired as a writer for the NBC sketch comedy series Saturday Nig...
Decommissioned Irish ferry vessel MV Naomh Éanna in the Grand Canal Docks, 2011 History NameMV Naomh Éanna OwnerIrish Ship & Barge Fabrication Co OperatorCóras Iompair Éireann RouteAran Islands, Ireland BuilderLiffey Dockyard, Dublin Yard number176 Launched26 October 1957 CompletedApril 1958 General characteristics Tonnage483 GRT MV Naomh Éanna is a decommissioned ferry which historically operated as the primary connection on the Galway to Aran Islands route for Córas Iompair ...
Adventure-class cruiser For other ships with the same name, see HMS Attentive. Attentive prior to the First World War History United Kingdom NameAttentive BuilderArmstrong Whitworth, Elswick, Tyne and Wear Yard number748 Laid downJanuary 1904 Launched22 November 1904 Completed2 February 1906 CommissionedOctober 1905 DecommissionedDecember 1918 FateSold for scrap, 12 April 1920 General characteristics (as built) Class and typeAdventure-class scout cruiser Displacement2,670 long tons (2,713...
Australian-bred Thoroughbred racehorse Sacred KingdomSireEncosta De LagoGrandsireFairy King (USA)DamCountroom SweetieDamsireZeditaveSexGeldingFoaled18 November 2003CountryAustraliaColourBayBreederN.F. Calvert, Est Late A.M. Calvert, VicOwnerSin Kang YukTrainerRicky P. F. YiuRecord36: 17-7-2EarningsHKD$45,831,144Major winsHong Kong Sprint (2007, 2009) Chairman's Sprint Prize (2008, 2010) KrisFlyer International Sprint (2009)AwardsHong Kong Champion Sprinter (2008, 2009, 2010, 2011)Hong Kong Mo...
Building in Bayreuth, Germany Margravial Opera HouseThe Margravial Opera House in 2013LocationBayreuth, Bavaria, GermanyCoordinates49°56′40″N 11°34′43″E / 49.94444°N 11.57861°E / 49.94444; 11.57861TypeOpera houseConstructionBuilt1744–1748ArchitectJoseph Saint-PierreGiuseppe Galli BibienaCarlo Galli Bibiena UNESCO World Heritage SiteOfficial nameMargravial Opera House BayreuthCriteriaCultural: (i), (iv)Reference1379Inscription2012 (36th Session)A...
بطولة ويمبلدون 2017 200px رقم الإصدار 131 نسخة 131 التاريخ من 3 إلى 16 يوليو 2017 مكان ويمبلدون، لندن، بريطانيا السطح ملعب عشبي الجوائز المالية £31,600,000 (2017) جدول فردي سيدات 7 أدوار (128 لاعب) غاربيني موغوروزا رجال 7 أدوار (128 لاعب) روجر فيدرير جدول زوجي سيدات 6 أدوار (64 فريق) إيكاترينا ...
Educational philosophy Hawthorne Valley Waldorf School, Ghent, New YorkMichael Hall School, Forest Row, Sussex, UKWaldorf school in Ismaning, Bavaria Waldorf education, also known as Steiner education, is based on the educational philosophy of Rudolf Steiner, the founder of anthroposophy. Its educational style is holistic, intended to develop pupils' intellectual, artistic, and practical skills, with a focus on imagination and creativity. Individual teachers have a great deal of autonomy in c...
賓漢頓大學Binghamton University校训From breadth through depth to perspective中译源自廣度,透過深度,獲得角度创办时间1946年IPEDS编码196079学校类型公立捐贈基金$116,500,000(美元)校长Harvey G. Stenger教师人數768 (2019年,全职)学生人數18,147 (2019年)本科生人數14,186研究生人數3,961校址 美國紐約州賓漢頓校區3.6平方公里代表色深綠 吉祥物Baxter The Bearcat 熊狸巴克斯特隶属紐約州立大學邮...
Dutch politician Ton RavenMember of the SenateIn office19 January 2021 – 13 June 2023Preceded byGerben GerbrandyAlderman in Sittard-GeleenIn office19 February 2020 – 19 January 2021In office2001–2002Alderman in GeleenIn office1994–2000Member of the Sittard-Geleen municipal councilIncumbentAssumed office 30 March 2022In office2001–2020Member of the Geleen municipal councilIn office1990–2000 Personal detailsBornA.C.M. Raven (1957-11-03) 3 November 1957 (age...
العلاقات الباربادوسية الوسط أفريقية باربادوس جمهورية أفريقيا الوسطى باربادوس جمهورية أفريقيا الوسطى تعديل مصدري - تعديل العلاقات الباربادوسية الوسط أفريقية هي العلاقات الثنائية التي تجمع بين باربادوس وجمهورية أفريقيا الوسطى.[1][2][3][4][...
Claudia Mo pada tahun 2013 Claudia Mo (nama lahir Mo Man-ching; lahir 18 Januari 1957), juga dikenal sebagai Claudia Bowring, adalah seorang wartawati dan politikus asal Hong Kong, anggota dari kamp pan-demokrasi. Ia adalah anggota Dewan Legislatif, mewakili daerah pemilihan Kowloon Barat.[1] Referensi ^ Chan, Yannie (7 November 2013). Claudia Mo. HK Magazine. Pranala luar Wikimedia Commons memiliki media mengenai Claudia Mo. Situs web resmi Pengawasan otoritas Umum Integrated A...