Purple Line (Bangkok)

MRT Purple Line
J-TREC sustina trainset
Overview
Other name(s)MRT Chalong Ratchadham Line
Native nameสายสีม่วง
สายฉลองรัชธรรม
OwnerMass Rapid Transit Authority
LocaleNonthaburi Province and Bangkok
Termini
StationsTotal : 33 stations
16 (operational)
17 (under construction)
Color on map    Purple
Service
TypeRapid transit
SystemMRT
Operator(s)Bangkok Expressway and Metro
Depot(s)Khlong Bang Phai
Kru Nai (under construction)
Rolling stockJ-TREC Sustina
S24-EMU : 21 three-car trainsets
Daily ridership70,303 (๋July 2024)
History
Commenced10 November 2009; 15 years ago (2009-11-10)
Opened6 August 2016; 8 years ago (2016-08-06)
Technical
Line lengthTotal :43.70 km (27.15 mi)
20.92 km (13.00 mi) (operational)
22.78 km (14.15 mi) (under construction)
Number of tracks2
CharacterElevated: 30.63 km (19.03 mi)
Underground : 13.07 km (8.12 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed80 km/h (50 mph)
SignallingBombardier CITYFLO 650 moving block CBTC ATC under ATO GoA 2 (STO), with subsystems of ATP, ATS and CBI[1]
Route map

PP1
Khlong Bang Phai
To Main Depot Right arrow
PP2
Talad Bang Yai
PP3
Sam Yaek Bang Yai
PP4
Bang Phlu
PP5
Bang Rak Yai
PP6
Bang Rak Noi Tha It
PP7
Sai Ma
Chao Phraya River
PP8
Phra Nang Klao Bridge
PP9
Yaek Nonthaburi 1
PP10
Bang Krasor
 MRT  Pink Line:
Min Buri Right arrow
PP11
Nonthaburi Civic Center
PP12
Ministry of Public Health
PP13
Yaek Tiwanon
PP14
Wong Sawang
 SRT  Light Red Line:
Left arrow Taling Chan – Bang Sue Right arrow
PP15
Bang Son
PP16
Tao Poon
 MRT  Blue Line:
Left arrow Tha Phra – Bang Sue Right arrow
Parliament House
Sri Yan
Vajira Hospital
National Library
Bang Khun Phrom
Democracy Monument
 MRT  Orange Line:
Left arrow Taling Chan – Min Buri Right arrow
Sam Yot
 MRT  Blue Line:
Left arrow Bang Khae – Hua Lamphong Right arrow
Chao Phraya River
Memorial Bridge
 SRT  Dark Red Line:
Left arrow Maha Chai – Hua Lamphong Right arrow
Wongwian Yai
 BTS  Silom Line:
Left arrow Bang Wa – Siam Right arrow
Somdech Phra Pinklao Hospital
Dao Khanong
Bang Pakaeo
Bang Pakok
Yaek Pracha Uthit
Rat Burana
Phra Pradaeng
Khru Nai

The MRT Purple line (Thai: รถไฟฟ้ามหานคร สายสีม่วง) or MRT Chalong Ratchadham line (Thai: รถไฟฟ้ามหานคร สายฉลองรัชธรรม) is Bangkok's fifth rapid transit line, following the Sukhumvit Line, Silom Line, MRT Blue Line, and Airport Rail Link. The line is 23 km (14 mi) long,[2] serving the north-western area of Bangkok running from Tao Poon to Klong Bang Phai in Nonthaburi Province.

The line opened on 6 August 2016.[3][2] It is the second line of MRT system and is operated by BEM under a concession contract. Daily ridership is 70,000.[4][5]

A 23.63 km (14.68 mi), 17 station southern extension of the line consisting of a 14.3 km (8.89 mi) underground section and a 9.3 km (5.78 mi) elevated section [6] commenced construction in August 2022. The cost of the southern extension is 82 billion baht and it is planned to open at the end of 2027.[7] By the end of May 2023, construction had progressed to 11.50%.[8]

Route alignment

The MRT Purple Line platform at Khlong Bang Phai MRT station
MRT Purple Line route map at Tao Poon Station (14 August 2016)
Ticket Vending machines at Khlong Bang Phai MRT station
Entrance to Tao Poon station, MRT Purple Line
Khlong Bang Phai MRT station

The Purple line starts from Khlong Bang Phai station in Bang Bua Thong District. The line travels south along Kanchanaphisek Road before turning eastward near Central WestGate, onto Rattanathibet Road. It continues along Rattanathibet Road, passing through a large residential area in Bang Yai District and crosses the Chao Phraya River on a bridge parallel to the Phra Nang Klao Bridge and runs towards Nonthaburi Civic Center station. The line then turns southward onto Tiwanon Road, passing the Ministry of Public Health and turns southeast onto Krung Thep-Nonthaburi Road, entering Yaek Tiwanon station. The line then enters Bangkok city limits at Bang Sue district and passes Bang Son station before terminating at the upper platforms of Tao Poon station, with a total length of 23 kilometres (14.29 mi), serving 16 stations.

History

Officially named the Chalong Ratchadham Line (Thai: สายฉลองรัชธรรม) – "To Celebrate the Great King's Reign with Righteousness"[9] – but informally known as the "Purple Line", the rapid transit line provides a north–western corridor in Bangkok's Mass Rapid Transit Master Plan. The line also incorporated an extension of the Blue Line from nearby Bang Sue station to Tao Poon Station.

In the 1990s, the plan for the Purple Line was to run from Bang Phut to Bang Sue for 12 kilometres (7.5 mi), with an extension to Thewet for 6.7 kilometers (4.2 mi).[10]

This line was created from the adjustment of the 1994 mass transit rail system master plan, which connected the original extension of the Blue Line from Tao Poon to Bang Yai, while the original Purple Line would have run from the National Library to Tao Poon and the original Orange Line from Samsen (National Library) to Rat Burana, becoming a new line designated as the Purple Line, included in the master plan of the Office of Transport and Traffic Policy and Planning (OTP) for the first time in 2004. Five years later, the line's construction began.

Northern section

Construction was divided into six contracts, three of them for civil works. The contracts were signed from late 2009 to early 2010 and completion was originally scheduled for the end of 2014.[11][12][13][14] The third contract included construction of four park and ride buildings at the Khlong Bang Phai, Sam Yaek Bang Yai, Bang Rak Noi Tha It, and Yaek Nonthaburi 1 stations. On 31 March 2017, the fifth contract was effectively terminated and became part of a new Blue Line concession agreement.[15][16]

The 2011 Thailand floods delayed the construction of the line for nearly 1 year. In June 2013, five people were injured when six beams fell onto vehicles below Tao Poon station.[17] In July 2014, the civil work was 94 percent complete;[18][19] in October 2014, civil work was stated to be 99% complete.[20]

The line opened on August 6, 2016, when His Majesty King Bhumibol Adulyadej graciously appointed Her Royal Highness Princess Maha Chakri Sirindhorn to represent him in presiding over the opening ceremony and officially pressing the button to open the electric train system.[3][21] However, the MRT Blue Line extension to Tao poon was delayed, so when it opened the Purple Line couldn't interchange with the Blue line as planned. This resulted in low line usage. Even with a reduced fare, the line only attracted about 22,000 passengers daily compared to a goal of 100,000. A shuttle bus service was in operation between Tao Poon MRT station and Bang Sue MRT station to connect with the Blue Line.[22] When the Blue line extension finally opened a year later, on 11 August 2017,[23][24] ridership significantly increased. In 2019, daily ridership was 70,000.[4][5]

Construction contracts

Contract Notes Contractor(s) Length
(km)
1 Phra Nang Klao Bridge to Tao Poon CKTC Joint Venture[11] 13
2 Khlong Bang Phai to Phra Nang Klao Bridge Sino-Thai Engineering & Construction[12] 10.75
3 Khlong Bang Phai Depot and Park & Ride buildings PAR Joint Venture[13]
4 Purple Line Rolling stocks and O&M Bangkok Expressway and Metro[25][26][27][28][29]
5 Bang Sue to Tao Poon section and O&M (MRT Blue Line)
6 Track and Electrical Italian-Thai Development[30][31]

Southern section

As the northern section of the Purple line was built first, the 2nd phase of the Purple Line south from Tao Poon via Rattanakosin - Bangkok's old town to Rat Burana would fully complete the line. The length of the southern extension is 23.63 km (14.68 mi) (14.29 km (8.88 mi) underground, 9.34 km (5.80 mi) elevated with 17 stations - ten underground and seven elevated).[6]

The Thai Cabinet was expected to approve the tender in mid 2017 with a tender then to be issued in the second half of 2017.[32] On 25 July 2017, Cabinet approval was given,[33][34] but the tender was then delayed until 2018.[35][36] By December 2018, a tender had still not been issued and was further delayed.[37] In August 2019, subject to final land acquisition, a March 2020 tender was planned.[38] In mid 2020, the Ministry of Transport still aimed for a tendering process within 2020 despite COVID-19 related delays.[39] The MRTA then expected to issue a tender in February 2021.[40] and if construction had begun in 2021, the extension was projected to enter service sometime in 2027.[41] However, the tender was delayed yet again and subsequently cancelled in August 2021 until it was finally issued in November 2021.[42]

Construction contracts were signed on 11 March 2022 with a 2005 construction period for an ambitious planned 2027 opening date.[43]

Construction progress

Contactors were issued with a Notice to Proceed on 25 April 2022 giving them access to sites along the route with actual construction planned to begin from August 2022.[44] Construction began in early August for two contract sections, 3 & 4.[45] Some 410 lots and 500 buildings will need to be appropriated to build the extension and as of May 2022 many of them were still to be surveyed.[7]

Construction progress was at 3.45% complete at the end of September 2022.[46] By the end of November 2022, construction progress was at 4.30%. [47] At the end of February 2023, construction had progressed to 7.73%.[48]

By the end of May 2023, construction had progressed to 11.50%. [49]

Construction contracts

Contract Notes Contractor(s) Length
(km)
Progress
(November 2024)
Cost[50]
1 Tao Poon to National Library CKST Joint Venture 4.8 61.02% ฿19,430 million
2 National Library to Phan Fah 3.44 52.95% ฿15,878 million
3 Phan Fah to Memorial Bridge ITD-NWR Joint Venture 3.1 41.91% ฿15,109 million
4 Memorial Bridge to Dao Khanong Unique Construction and Engineering 4.1 45.22% ฿14,982 million
5 Dao Khanong to Kru Nai & Depot Italian-Thai Development 9 24.11% ฿19,904 million
6 Track and Electrical 36.37% ฿3,589 million
7 Rolling stock TBA TBA
Total Progress 46.34%[51] ฿82,083 million

Stations

Code Station Name Opened Platform Type Position Park
&
Ride
Transfer Notes
English Thai
Khlong Bang Phai - Tao Poon: 20.92 km (operational)
 PP01  Khlong Bang Phai คลองบางไผ่ 6 August 2016; 8 years ago (2016-08-06) Island Elevated Exit to:
• Khlong Bang Phai Depot
• DHL Supply Chain & Distribution
 PP02  Talad Bang Yai ตลาดบางใหญ่ Island - Exit to:
• Big C Extra Bangyai
• The Square Bang Yai
• Kasemrad International Hospital Ratthanatibeth
• Home Pro Rattanathibet
• Big C Supercenter Rattanathibet 1
• Decathlon Bangyai
• Index Living Mall Bang Yai
Central Westgate
• IKEA Bangyai
• Bang Yai Market
 PP03  Sam Yaek Bang Yai สามแยกบางใหญ่ Island
 PP04  Bang Phlu บางพลู Island - Exit to Megahome Rattanathibet
 PP05  Bang Rak Yai บางรักใหญ่ Island - Exit to Wat Bang Rak Yai
 PP06  Bang Rak Noi Tha It บางรักน้อย-ท่าอิฐ Island Proposed connecting station to  BTS  (future)
 PP07  Sai Ma ไทรม้า Island -
 PP08  Phra Nang Klao Bridge สะพานพระนั่งเกล้า Island - Connecting station, without paid-area integration to Phra Nang Klao pier for
 Mine Smart Ferry 
 CHAOPHRAYA EXPRESS 
Exit to:
• Wat Noi Nok
• Wat Chaeng Sirisamphan
• Tonsak Market
• Rajamangala University of Technology Suvarnabhumi - Nonthaburi Campus - North Area
 PP09  Yaek Nonthaburi 1 แยกนนทบุรี 1 Island Exit to:
Central Rattanathibet
• Owl Market
 PP10  Bang Krasor บางกระสอ Island - Exit to:
• Big C Supercenter Rattanathibet 2
• Grand Richmond Stylish Convention Hotel

Formerly Si Phon Sawan

 PP11  Nonthaburi Civic Center ศูนย์ราชการนนทบุรี Island - Connecting station, without paid-area integration, to
 MRT  , via a 350-metre elevated pedestrian walkway.
 MRT  (future)
Exit to:
• National Broadcasting and Telecommunications Commission
• Nonthaburi Civic Center
• Esplanade Cineplex Ngamwongwan – Khae Rai
• Siam Business Administration Nonthaburi Technological College
• Makut Rommayasaran Park
 PP12  Ministry of Public Health กระทรวงสาธารณสุข Island - Exit to:
Ministry of Public Health
Srithanya Hospital
• Regional Revenue Office 4
 PP13  Yaek Tiwanon แยกติวานนท์ Island -
 PP14  Wong Sawang วงศ์สว่าง Island - Exit to Big C Market Place Wong Sawang
 PP15  Bang Son บางซ่อน Island - Connecting station, without paid-area integration, to
 SRT 
SRT Southern Line
Exit to Bang Son Market
 PP16  Tao Poon เตาปูน Island - Interchange station to  MRT  Exit to:
• Tao Poon Market
• Lotus's Prachachuen
Tao Poon - Kru Nai: 22.78 km (under construction)
 PP17  Parliament House รัฐสภา 2027; 3 years' time (2027)
(expected)
Island Underground - Exit to:
Thai Parliament
• Defence Industrial Department
• 4th Armoured Regiment, 1st Division King's Royal Guard
• Air Defence Division
• Wat Mai Thongsen
• Wat Kaew Fah Chulamanee
 PP18  Sri Yan ศรีย่าน Stacked - Exit to:
• Supreme Complex
• Makro Samsen
• Royal Irrigation Department
• Medium Irrigation Water Resources Development Division
• Wimol Sriyan Commercial College
 PP19  Vajira Hospital วชิรพยาบาล Stacked - Exit to:
Vajira Hospital
Sukhothai Palace
• Market Place Dusit
• Suan Dusit University
Saint Gabriel's College
 PP20  National Library หอสมุดแห่งชาติ Side - Exit to:
• Suan Sunandha Rajabhat University
• The National Library
• Rajamangala University of Technology Phra Nakhon
 PP21  Bang Khun Phrom บางขุนพรหม Stacked - Exit to:
Bank of Thailand
Bank of Thailand Museum
Bang Khun Phrom Palace
• Wat Sam Phraya
 PP22  Democracy Monument อนุสาวรีย์ประชาธิปไตย Stacked - Interchange station to  MRT  (under construction) Exit to:
• Mahakan fort
• Rattanakosin Exhibition Hall
Queen Sirikit Gallery
• Royal Pavilion Mahajetsadabadin
Wat Saket

Formerly Phan Fa

 PP23  Sam Yot สามยอด Island - Interchange station to  MRT  Exit to:
Khlong Ong Ang
• Mega Plaza Saphan Lek
Phahurat
Rommaninat Park
The Old Siam Plaza
 PP24  Memorial Bridge สะพานพุทธฯ Island - Proposed connecting station to Prachathipok station for  MRL  Exit to:
Suksanari School
Wat Prayurawongsawat Worawihan
Wat Phitchaya Yatikaram Worawihan
Wat Anongkharam Worawihan
• Nan Ah Hospital
• Big C Supercenter Itsaraphap
 PP25  Wongwian Yai วงเวียนใหญ่ Island - Connecting station, without paid-area integration to
 BTS  via 270-metre underground walkway
 SRT  via 120-metre covered walkway (future)
Exit to:
• Wongwian Yai Market
Wongwian Yai
 PP26  Somdech Phra Pinklao Hospital โรงพยาบาลสมเด็จพระปิ่นเกล้า Island - Exit to:
• Somdech Phra Pinklao Hospital
• Samre Market

Formerly Samre

 PP27  Dao Khanong ดาวคะนอง Side Elevated - Exit to:
• Big C Supercenter Dao Khanong
• Wat Mongkhon Wararam
 PP28  Bang Pakaeo บางปะแก้ว Side -
 PP29  Bang Pakok บางปะกอก Side Exit to:
• Wat Bang Pakok
• Bang Pakok Wittayakom School
• Bangpakok 1 Hospital
• Bang Pakok Fresh Market
• Lotus's Bangpakok
 PP30  Yaek Pracha Uthit แยกประชาอุทิศ Side - Exit to:
• Bangkok Employment Office Area 2
• Han Clan Foundation of Thailand
• Wat Sarod School
• Wat Sarod

Formerly Rama 9 Bridge

 PP31  Rat Burana ราษฎร์บูรณะ Side
 PP32  Phra Pradaeng พระประแดง Side - Exit to:
• Phra Pradaeng Arcade Market
• HomePro Suk Sawat
• Big C Supercenter Suksawat
• Thaiwatsadu Suk Sawat
 PP33  Khru Nai ครุใน Side - Exit to Wat Kru Nai

[2]

Rolling stock

In November 2013, BEM contracted with Marubeni Corp, Toshiba Corp, and East Japan Railway Company to install E&S systems, supply 21 three-car trains (total of 63 cars) rolling stock, and provide maintenance for 10 years as part of a contract worth 12.6 billion baht.[52] East Japan Railway train manufacturing subsidiary J-TREC built them in Yokohama with the first sets delivered in early 2016.[53] The trains are owned by the MRTA which paid for the rolling stock at BEMs request.[38] The southern extension will acquire 17 additional trains, along with the current ones, to create a total of 38 trains.

In total, line is service by 21 three-car trains.[9] Trains are powered by 750 V DC via third rail system, are air-conditioned and capable of traveling at up to 80 km/h (50 mph).

Operation

Headways

MRT Purple Line headway[54]
Time Headway (Minutes:Seconds)
Monday - Friday
05.30 - 06.30 07:12
06:30 - 08:30 04:50
08:30 - 09:30 06:25
09:30 - 17:00 08:30
17:00 - 20:00 04:50
20:00 - 21:00 06:25
21:00 - 24:00 09:30
Saturday to Sunday and Public Holiday
06:00 - 24:00 09:30

Ridership

When the Purple line first opened daily ridership was only 22,000 compared to projected numbers of 100,000.[55] After the opening of the Blue Line extension to Tao Poon 1 year later in August 2017, daily average ridership increased significantly from 33,000 to 50,000.[56]

In August 2018, the MRTA Deputy Governor stated that daily ridership had increased to 60,000 each weekday.[57] By late 2019, this had increased to 70,000.[4] In 2023 the purple line saw an average of 50385 passengers per day. [58]

On 16 October 2023, MRT Purple Line began using the new fare rates of 14 to 20 baht (down from 16 to 42 baht) after the '20 Baht Transit Max Fares Policy' was approved by the Thai government.[59]

MRT Purple Line Ridership[60]
Year Quarter Quarterly Ridership Daily Ridership Annual Ridership Remarks
2016 Q1 3,074,389
Q2
Q3 1,161,989 20,731  PP01  Khlong Bang Phai -  PP16  Tao Poon section opened on 6 August 2016.
Q4 1,912,400 20,796
2017 Q1 1,969,874 21,888 11,626,990
Q2 2,196,900 24,142
Q3 3,437,488 37,364  BL10  Tao Poon -  BL11  Bang Sue section on MRT Blue Line opened on 11 August 2017.
Q4 4,022,728 44,206
2018 Q1 4,005,632 44,508 17,644,588
Q2 4,120,533 45,281
Q3 4,791,613 52,083
Q4 4,726,810 51,379
2019 Q1 4,699,831 52,221 19,726,225
Q2 4,665,231 52,419
Q3 5,298,016 57,588
Q4 5,063,147 55,035
2020 Q1 4,719,549 51,863 16,836,638 1st wave of COVID-19 outbreaks (January 2020 - May 2020)
Q2 2,208,015 24,264
Q3 4,840,866 52,619
Q4 5,068,208 55,089 2nd wave of COVID-19 outbreaks (December 2020 - February 2021)
2021 Q1 3,475,384 38,615 9,841,934
Q2 1,993,392 21,668 3rd wave of COVID-19 outbreaks (April 2021 - June 2021)
Q3 1,417,404 15,407 4th wave of COVID-19 outbreaks (July 2021 - early 2022)
Q4 2,955,754 32,128
2022 Q1 2,946,430 32,739 16,450,757
Q2 3,569,128 39,222
Q3 4,691,107 50,991
Q4 5,244,092 57,001
2023 Q1 5,122,816 56,921 21,508,224
Q2 4,897,809 53,823
Q3 5,623,257 61,123
Q4 5,864,342 63,742 Began using 14-20 Baht fare rates from 16 October 2023.[59]
2024 Q1 6,005,239 65,992 22,657,682
Q2 5,718,198 62,837
Q3 6,628,438 72,049
Q4 4,305,807 70,587 As of November 2024.[61]

Route map

Network map

See also

References

  1. ^ "Bombardier Projects in Mass-transit signalling" (PDF). Archived from the original (PDF) on 23 November 2021.
  2. ^ a b c Mokkhasen, Sasiwan (10 May 2016). "Sign up to test ride new MRT Purple Line". Khaosod English. Thailand. Archived from the original on 13 November 2021. Retrieved 13 November 2021.
  3. ^ a b "Purple Line: Newly launched, but few using it". Bangkok Post. Retrieved 21 June 2020.
  4. ^ a b c https://www.khaosod.co.th/economics/news_2933591. Khaosod ,30 September 2019
  5. ^ a b "MRTA to issue measure to reduce fares to attract passengers".
  6. ^ a b "MRTA Purple Line project".
  7. ^ a b "Construction of southern Purple Line to begin in August". The Nation. 22 April 2022.
  8. ^ "MRT Purple Line construction update June 2023". MRTA PR Facebook. 8 June 2023.
  9. ^ a b "BEM บริษัททางด่วนและรถไฟฟ้ากรุงเทพจำกัด (มหาชน)". metro.bemplc.co.th (in Thai). Retrieved 22 June 2020.
  10. ^ "Urban Railway Projects In Bangkok - Measures for Securing Financial Resources" (PDF).
  11. ^ a b "ลงนามสัญญาที่1 รถไฟสีม่วง ช.การช่างได้เฮ". thairath.co.th (in Thai). 26 August 2009. Retrieved 21 June 2020.
  12. ^ a b "รฟม.ลงนามสัญญา 2 สายสีม่วง มูลค่า 1.31 หมื่นล้านแล้ว". thairath.co.th (in Thai). 20 January 2010. Retrieved 21 June 2020.
  13. ^ a b "รฟม.ตัดเค้กสัญญา 3 รถไฟฟ้าสายสีม่วง "อิตาเลียนไทย" ได้ทานแห้ว". mgronline.com. 23 June 2009. Retrieved 25 June 2020.
  14. ^ "รถไฟฟ้าสายสีม่วงบางซื่อ-บางใหญ่ฉลุยเซ็นรับเหมาครบ3สัญญา ลงมือก่อสร้างก.พ.นี้ 3 ปีครึ่งเสร็จ !!". www.thailog.org. Retrieved 25 June 2020.
  15. ^ "ปิดดีลเดินรถสีน้ำเงิน ครม.ผ่านฉลุย เร่งเซ็นสัญญาจ้าง Bem ทยอยเปิดเดินรถปลายปี 62". mgronline.com. 28 March 2017. Retrieved 25 June 2020.
  16. ^ "BEM significant event in 2017" (PDF).
  17. ^ "MRTA Purple line accident injures 5". Bangkok Post. 7 June 2013.
  18. ^ "คมนาคมตามความคืบหน้ารถไฟฟ้า 10 สาย เร่งสีม่วงเปิดปลายปี'58 ชงคสช.อนุมัติอีก 6 สาย : ประชาชาติธุรกิจออนไลน์". Archived from the original on 17 October 2014. Retrieved 28 July 2014.
  19. ^ "ระบบรถไฟฟ้าในกทม.และปริมณฑล".
  20. ^ "หนังสือพิมพ์บ้านเมือง » คมนาคม เผยความคืบหน้ารถไฟฟ้า". Archived from the original on 9 October 2014. Retrieved 9 October 2014.
  21. ^ พิธีเปิดการเดินรถ และกดปุ่มเปิดระบบรถไฟฟ้าอย่างเป็นทางการ
  22. ^ "Fare cut boosts Purple Line riders, but still below target". Bangkok Post. Retrieved 11 September 2016.
  23. ^ "Purple Line to connect with MRT on Aug 11". Bangkok Post. 12 July 2017. Retrieved 24 April 2020.
  24. ^ "เปิดวิ่งเชื่อมต่อสถานีเตาปูน-บางซื่อ 12.00 วันนี้". bangkokbiznews.com/. 11 August 2017. Retrieved 25 June 2020.
  25. ^ "รถไฟฟ้าสายสีม่วงคืบหน้าแล้วกว่า70%". posttoday.com. 4 September 2013. Retrieved 25 June 2020.
  26. ^ "Purple Line O&M contract (PDF)" (PDF).
  27. ^ 'Purple Line deal agreed BEM signs 30-year contract with MRTA'. Bangkok Post, 5 September 2013
  28. ^ "Bangkok Purple Line contract awarded". International Railway Gazette. 22 October 2012. Retrieved 6 May 2013.
  29. ^ "BMCLอนุมัติเซ็นสัญญารถไฟฟ้าสายสีม่วงสัญญาที่5". bangkokbiznews.com/. 21 August 2015. Retrieved 25 June 2020.
  30. ^ "ITD closer to Purple Line contract". The Nation. Bangkok. 17 May 2012. Retrieved 26 November 2012.
  31. ^ isranews (4 October 2012). "รฟม.จ้างอิตาเลียนไทยฯสร้างรถไฟฟ้า". สำนักข่าวอิศรา (in Thai). Retrieved 25 June 2020.
  32. ^ http://www.bangkokpost.com/archive/b358bn-rail-projects-expected-to-go-ahead/1256406. Bangkok Post, 26 May 2017
  33. ^ "ครม.ไฟเขียวรถไฟฟ้าม่วงใต้ 1.101 แสนล้าน "อาคม" จ่อชงอีก 4 สายครบโครงข่าย". 25 July 2017.
  34. ^ http://www.nationmultimedia.com/detail/Economy/30321793. The Nation, 25 July 2017
  35. ^ https://www.bangkokpost.com/archive/purple-line-south-link-bid-faces-delay/1357647. Bangkok Post, 10 Nov 2017
  36. ^ https://www.bangkokpost.com/news/transport/1541274/tor-for-slate-of-transport-projects-set-for-fast-track. Bangkok Post, 17 September 2018
  37. ^ Chantanusornsiri, Wichit (12 December 2018). "Purple Line, Phuket light rail among projects up for PPP". Bangkok Post. Retrieved 25 June 2020.
  38. ^ a b Member Yappofloyd meeting with MRTA Planning Division on 7 August 2019 at MRTA Headquarters
  39. ^ "'ศักดิ์สยาม'สั่งลุยเปิดประมูลรถไฟฟ้าสายสีส้ม-ม่วงใต้ภายในปีนี้". Thai Post | อิสรภาพแห่งความคิด. Retrieved 25 June 2020.
  40. ^ เช็กคืบหน้ารถไฟฟ้าทุกสี ต้นปี 64 เปิดประมูล สีม่วง “เตาปูน-ราษฎร์บูรณะ. Prachachat, 1 December 2020
  41. ^ Theparat, Chatrudee (30 October 2020). "Tangled lines". Bangkok Post. Bangkok Post. Retrieved 31 October 2020.
  42. ^ "REANNOUCEMENT OF INVITATION TO TENDER THE MRT Purple Line Project, Tao Pun - Rat Burana (Kanchanapisek Road) Section". 10 November 2021.
  43. ^ "Purple Line southern section construction to start this year". 11 March 2022.
  44. ^ "ประมูลคุมงานก่อสร้าง"สีม่วงใต้"คึกคัก บริษัทที่ปรึกษาแห่ยื่นชิงเค้ก 2.8 พันล้าน". Manager Online. 25 April 2022. Retrieved 25 June 2020.
  45. ^ "รฟม. ส่งมอบพื้นที่ชุดแรกสร้างรถไฟฟ้า "สีม่วงใต้" สัญญา 3-4 แล้ว". Daily News. 2 August 2022.
  46. ^ "เปิดไซต์ก่อสร้างรถไฟฟ้า 4 สาย ส้ม เหลือง ชมพู คืบเกิน 90% สีม่วง เตาปูน-ราษฎร์บูรณะ เดินหน้าแล้ว 3.42%". Matichon. Archived from the original on 8 October 2022. Retrieved 8 October 2022.
  47. ^ "MRT Purple Line construction update December 2022". MRTA PR Facebook. 8 December 2022.
  48. ^ "MRT Purple Line construction update March 2023". MRTA PR Facebook. 8 March 2023.
  49. ^ "MRT Purple Line construction update June 2023". MRTA PR Facebook. 8 June 2023.
  50. ^ "รายละเอียดโครงการ | โครงการรถไฟฟ้าสายสีม่วง ช่วงเตาปูน-ราษฎร์บูรณะ (วงแหวนกาญจนาภิเษก)". www.mrta-purplelinesouth.com. Retrieved 9 October 2024.
  51. ^ "ความก้าวหน้าของงานก่อสร้าง | โครงการรถไฟฟ้าสายสีม่วง ช่วงเตาปูน-ราษฎร์บูรณะ (วงแหวนกาญจนาภิเษก)". www.mrta-purplelinesouth.com. Retrieved 9 October 2024.
  52. ^ 'Japanese firms win Purple Line deal'. Bangkok Post, 6 November 2013
  53. ^ "First Sustina export order". International Railway Gazette. 23 September 2014.
  54. ^ https://www.mrta.co.th/storage/content/uploads/1702888750OK-PR_122566-01.jpg
  55. ^ "Fare cut boosts Purple Line riders, but still below target - Bangkok Post Property finance advice". Bangkok Post. Retrieved 11 September 2016.
  56. ^ "Purple Line use up 47% since 'missing link' completed". Bangkok Post. Bangkok. 8 September 2017.
  57. ^ http://www.thansettakij.com/content/309472. Thansettakij, 27 August 2018
  58. ^ "Minisery of rail transport".
  59. ^ a b "รฟม. ลดค่าโดยสารรถไฟฟ้า MRT สายสีม่วง สูงสุดไม่เกิน 20 บาท เริ่ม 16 ตุลาคม 2566 ตั้งแต่เวลา 11.00 น. เป็นต้นไป เพื่อลดภาระค่าครองชีพแก่ประชาชนตามนโยบายรัฐบาล".
  60. ^ "สถิติจำนวนผู้โดยสารโครงการรถไฟฟ้ามหานคร สายฉลองรัชธรรม (สีม่วง)". www.mrta.co.th (in Thai). Retrieved 22 September 2024.
  61. ^ "ปริมาณผู้ใช้บริการระบบขนส่งทางราง ประจำเดือน "พฤศจิกายน 2567"". กรมการขนส่งทางราง กระทรวงคมนาคม (in Thai). 4 December 2024. Retrieved 4 December 2024.

Read other articles:

21-ша окрема механізована бригада Неофіційний нарукавний знак бригадиЗасновано січень 2023Країна  УкраїнаВид Сухопутні військаТип  Механізовані військаЧисельність бригада У Вікіпедії є статті про інші значення цього терміна: 21-ша бригада. 21-ша окрема механізована бр

 

Apartheid Street in Hebron, Israel Israeli checkpoint in Shuhada Street in 2012. The only Palestinians that may enter the area are house owners, and they may only enter by foot – since 2010, only Israeli cars can use the road, as well as Israeli settlers and tourists.[citation needed] Al-Shuhada Street (Arabic: شارع الشهداء, lit. Martyr's Street),[1] nicknamed Apartheid Street by Palestinians and King David Street by local Israeli settlers,[2] is a street ...

 

American legislative district Virginia's 34thState Senate district District map before the 2023 election District map from the 2023 electionSenator  Chap PetersenD–Fairfax Demographics56% White6% Black12% Hispanic21% Asian4% OtherPopulation (2019)205,486[1]Registered voters142,507[2] Virginia's 34th Senate district is one of 40 districts in the Senate of Virginia. It has been represented by Democrat Chap Petersen since his 2007 defeat o...

Кешик Орог-тайшиНародився 15 століттяПомер 1478[1][2]Посада правитель[2]Батько Уч-Темур[2]Брати, сестри Q22774128? і Q22774145?Діти Єнган-тайши[2] Кешик Орог-тайши (*д/н — 1486) — 6-й очільник Дербен-Ойрата в 1478—1486 роках. Життєпис Син тайши Уч-Темура. Про молоді р

 

Relações entre Etiópia e Rússia     Mapa indicando localização da Etiópia e da Rússia.   Etiópia   Rússia As relações entre Etiópia e Rússia (em russo: Российско-эфиопские отношения) referem-se as relações entre os dois países, a Etiópia e a Rússia. A Rússia tem atualmente uma embaixada em Addis Abeba e a Etiópia tem uma embaixada em Moscou. O embaixador da Etiópia na Rússia também está credenciado na Armê...

 

Hamburg-Poppenbüttel Der Bahnhof Poppenbüttel nach der ModernisierungDer Bahnhof Poppenbüttel nach der Modernisierung Daten Lage im Netz Endbahnhof Bahnsteiggleise 2 Abkürzung APB IBNR 8004862 Preisklasse 5 Eröffnung 1917 bahnhof.de Poppenb-C3-BCttel-1037180 Lage Ort/Ortsteil Poppenbüttel Land Hamburg Staat Deutschland Koordinaten 53° 39′ 8″ N, 10° 5′ 39″ O53.6521810.09403Koordinaten: 53° 39′ 8″ N, 10° 5′ 39″...

Der Titel dieses Artikels ist mehrdeutig. Zum Pfarrer und kurfürstlichen Rat von Friedrich I. von Brandenburg-Ansbach siehe Friedrich Sesselmann (Pfarrer). Friedrich Sesselmann (* um 1410 in Kulmbach, Oberfranken; † 21. September 1483 in Kamenz, Oberlausitz) war Kanzler in Brandenburg seit 1445, Bischof von Lebus seit 1455 und Regent des Kurfürstentums Brandenburg seit 1473. Inhaltsverzeichnis 1 Leben 1.1 Herkunft und Studien 1.2 Kanzler in Brandenburg 1.3 Bischof von Lebus 1.4 Statthalte...

 

Campeonato Mundial de LuchaBudapest 2016 LuchaDatos generalesSede BudapestHungría HungríaRecinto SYMA Sports and Conference CentreCategoría AbsolutaFecha 10 – 11 de diciembre de 2016Edición LXVIIOrganizador United World WrestlingParticipantes 142 Cronología Las Vegas 2015 Budapest 2016 París 2017 Sitio oficial [editar datos en Wikidata] El LXVII Campeonato Mundial de Lucha se celebró en Budapest (Hungría) entre el 10 y el 11 de diciembre de 2016 bajo la organización ...

 

The Goodman's Croft was a superstition common in 16th and 17th century Great Britain, particularly in Scotland.[1][2] It was also known as the Guideman's Grunde, Halyman's Croft, Goodman's Fauld, Gi'en Rig, Deevil's Craft, Clooties Craft, and the Black Faulie.[1][3] The practice consisted of leaving a portion of cultivable land untilled and devoting it to a supernatural being in the hopes of placating it and ensuring good fortune.[4] Many crofters left ...

Magnifying device A jeweler's loupe A loupe (/ˈluːp/ LOOP) is a simple, small magnification device used to see small details more closely.[1] They generally have higher magnification than a magnifying glass, and are designed to be held or worn close to the eye. A loupe does not have an attached handle, and its focusing lens(es) are contained in an opaque cylinder or cone. On some loupes this cylinder folds into an enclosing housing that protects the lenses when not in use. Optics Di...

 

Psophodidae Psophodidae Eastern whipbird (Psophodes olivaceus)TaksonomiKerajaanAnimaliaFilumChordataKelasAvesOrdoPasseriformesFamiliPsophodidae Bonaparte, 1854 GeneraSee list belowlbs Psophodidae adalah keluarga burung pengicau yang berasal dari Australia dan daerah sekitarnya. Ia memiliki sejarah taksonomi yang rumit dan penulis yang berbeda-beda dalam menentukan burung mana yang mereka masukkan ke dalam keluarga. Dalam pengertian yang paling ketat, ini hanya mencakup lima atau enam spesies ...

 

Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Januari 2023. Gelanggang Olahraga Oepoi adalah sebuah gelanggang olahraga serbaguna di Kota Kupang, Nusa Tenggara Timur, Indonesia. Gelanggang olahraga ini umumnya digunakan untuk olahraga basket dan bulu tangkis. Meskipun kapasitas GOR Oepoi untuk pertandingan bask...

La Doctrine du fascisme Auteur Benito Mussolini et Giovanni Gentile Genre Essai Version originale Langue Italien modifier  La Doctrine du fascisme (en italien : La dottrina del fascismo) est un essai que l'on attribue à Benito Mussolini. En réalité, la première partie de l'essai, intitulée Idee Fondamentali (en français Idées Fondamentales) a été écrite par le philosophe Giovanni Gentile. Seule la seconde partie (Dottrina politica e sociale) est l'œuvre de Mussolini lui-m...

 

1954 film by William Beaudine Yukon VengeanceDirected byWilliam BeaudineWritten byJames Oliver CurwoodWilliam RaynorProduced byWilliam F. BroidyStarringKirby GrantMonte HaleMary Ellen KayHenry KulkyCinematographyJohn J. MartinEdited byAce HermanMusic byEdward J. KayProductioncompanyWilliam F. Broidy Pictures CorporationDistributed byAllied ArtistsRelease dateJanuary 17, 1954Running time68 minutesCountryUnited StatesLanguageEnglish Yukon Vengeance is a 1954 American Northern film directed by W...

 

Governor of The Californias Matías de Armona Civil Governor of Las CaliforniasIn officeJune 12, 1769 – November 9, 1770Preceded byGaspar de PortoláSucceeded byFelipe de Barri (civil in south) & Pedro Fages (military in north) Personal detailsBornSpainProfessionPolitician Matías de Armona also Don Matías de Armona was a governor of Las Californias, serving from June 12, 1769 to November 9, 1770, during Spanish Empire colonial rule of New Spain.[1] Map of New Spai...

Metrostar FerryOverviewOwnerMetrostar Ferry, Inc.LocaleMetro Manila and CaviteTransit typeFerryNumber of lines1Number of stations2OperationBegan operationSeptember 24, 2007Number of vehicles4TechnicalSystem length28 km (17.40 mi) Metrostar Ferry was a passenger ferry service across Manila Bay between Cavite City and Pasay in Metro Manila, Philippines. It is owned and operated by Metrostar Ferry, Inc. The route operated between terminals in San Roque, at the back of the Cavite City H...

 

1978 Iranian filmThe CycleFilm posterDirected byDariush MehrjuiWritten byDariush MehrjuiBased onThe play Aashghaal-duni by Gholam-Hossein SaediProduced byParviz SayyadBahman FarmanaraMalek-Sasan VeisiStarringSaeed KangaraniEzzatollah EntezamiAli NassirianEsmail MohammadiForouzanBahman ForsiCinematographyHoushang BaharlouEdited byTalat MirfendereskiMusic byHormoz FarhatRelease dateApril 12, 1978 (Iran)Running time101 minutesCountryIranLanguagePersianBox officeOver 16 million rials The Cycle (P...

 

تريس آرويوس City Hall الاسم الرسمي Tres Arroyos الإحداثيات 38°22′S 60°16′W / 38.367°S 60.267°W / -38.367; -60.267 تأسس April 24, 1884 تقسيم إداري  بلد  الأرجنتين  محافظات الأرجنتين بوينس آيرس (محافظة)  Partido Tres Arroyos خصائص جغرافية  المساحة 16.63 كيلومتر مربع[1]  ارتفاع 98 عدد السكان (201...

هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (مايو 2023) الغزو الألماني للمجر التاريخ وسيط property غير متوفر. بداية أغسطس 1063  نهاية سبتمبر 1063  تعديل مصدري - تعديل   حدث الغزو الألماني للمجر في أغسطس-سبتمبر 1063، مت...

 

University in Milan, Italy This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: University of Milan – news · newspapers · books · scholar · JSTOR (May 2012) (Learn how and when to remove this template message) University of MilanUniversità degli Studi di MilanoSeal of the University of MilanLatin: Universitas St...