The original Eskbank and Dalkeith railway station was previously closed (along with the Waverley Route) in 1969. The new construction work was undertaken by BAM Nuttall. The new station, further south than the original, opened on 6 September 2015.[2]
Facilities
Car parking space is available for 248 cars and also cycle storage space.
As of the May 2021 timetable change, the station is served by an hourly service between Edinburgh Waverley and Tweedbank, with a half-hourly service operating at peak times (Monday to Saturday). Some peak time trains continue to Glenrothes with Thornton. All services are operated by ScotRail.[3]