The B Line is one of the city's two fully-underground subway lines (along with the D Line). The two lines share tracks through Koreatown and Downtown Los Angeles. As of 2019[update], the combined B and D lines averaged 133,413 boardings per weekday.[2]
In 2020, Metro renamed all of its lines using letters and colors, with the Red Line becoming the B Line (retaining the red color in its service bullet) and the Purple Line becoming the D Line.
B Line trains run every day between approximately 4:30 a.m. and midnight. Trains operate every 12 minutes during peak hours. Early morning and night service is approximately every 20 minutes.[3]
Time
5A
6A
7A
8A-6P
7P
8P
9P-12A
Weekdays
14-18
12
20
Weekends/Holidays
20
16-20
12
20
Station listing
The following table lists the stations of the B Line, from north to south. All stations are located in the city of Los Angeles, California.
Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found on Phabricator and on MediaWiki.org.
The current B Line is the product of a long-term plan to connect Downtown Los Angeles to central and western portions of the city with a subway system. Original proposals in the 1980s had it running down Wilshire Boulevard to Fairfax Avenue and then north to the San Fernando Valley. Residents in some parts of the city bitterly opposed the subway. A 1985 methane explosion at a Ross Dress for Less clothing store near Fairfax gave Rep. Henry Waxman, who represented the Fairfax District, a reason to derail the project that was opposed by his constituents by prohibiting tunnelling in an alleged "methane zone" west of Western on Wilshire.[7] After some political wrangling, a new route was chosen up Vermont Avenue to Hollywood Boulevard.
The groundbreaking for the first segment of the subway was held on September 29, 1986, on the site of the future Civic Center/Grand Park station.[8][9] Today's B Line was built in four minimum operating segments:
Overall, the construction of the subway over the four phases cost $4.5 billion.[13]
On June 22, 1995, during the construction of MOS-2B, a sinkhole appeared on Hollywood Boulevard, barely missing several workers and causing damage to buildings on the street.[14] Subway construction was delayed during the investigation and repairs of the sinkhole. The contractor on that segment project was replaced, and because of the perceived mismanagement of Red Line construction, in 1998 voters banned the use of existing sales taxes for subway tunnelling.[15]
Construction of MOS-3, by comparison, proceeded with relatively few issues. Tunnelling from North Hollywood for the subway started in 1995. Workers dug under the Santa Monica Mountains using tunnelling machines. Work progressed an average of 50 to 200 ft (15 to 61 m) daily, performed by work crews round-the-clock six days a week.
Original proposals for the subway system included expansions east from Union Station to East Los Angeles and west from North Hollywood towards the Warner Center transit hub in the San Fernando Valley. Barred from subway tunnelling, Metro turned to other types of mass transit. In the San Fernando Valley, residents passed a law in 1991 mandating that any rail line in the area be built underground,[16][17] so Metro built a busway (now the G Line) from North Hollywood to Warner Center, which opened on October 29, 2005. East of Union Station, Metro built a light rail line with at-grade and underground segments to East Los Angeles, now part of the E Line, which opened on November 15, 2009.
Operations
On Metro Rail's internal timetables, the B Line is called line 802.
Maintenance
The B Line operates out of the Division 20 Yard (Santa Fe Yard), located at 320 South Santa Fe Avenue in Downtown Los Angeles. This yard stores the fleet used on the B and D Lines, and where heavy maintenance is performed. Cars reach this yard by continuing past Union Station, making a right turn and surfacing at the Eastern terminus of Ducommun Street. They then travel south to 1st Street, through a washing station, and enter the yard.
Rolling stock
The B Line uses A650 75 ft (22.86 m) electric multiple unit cars built by Breda in Italy. Trains usually run in six-car configurations during peak hours and four-car configurations otherwise. The cars are maintained in a Metro yard on Santa Fe Avenue near 4th Street alongside the Los Angeles River in downtown Los Angeles.
In March 2017, Metro ordered new CRRC HR4000 railcars, which will operate on the B Line when they are delivered.[18] In January 2024, Metro ordered 182 Hyundai Rotem HR5000 trains, allowing for future replacement of all Breda A650 trains as well as expanded train service including a four minute train frequency.[19]
Potential future extensions
Extension to Arts District
In 2010, at the request of L.A. City Councilman Tom LaBonge, Metro staff studied the possibility of adding a station along the west bank of the Los Angeles River to 6th Street and Santa Fe Avenue. The study concluded that such an extension, completed at-grade along Metro-owned right-of-way, could be completed for as little as $90 million.
The study suggested an alternative station at the Division 20 Yard north of 4th Street and Santa Fe Avenue. This station would be closer to the residential population of the Arts District. As new turnback tracks will need to be built as part of the D Line Extension (to allow shorter headways), this Arts District extension could possibly be partially completed as part of the Purple Line Extension project, lowering the incremental cost of the station while increasing its usability.[20][21]
One of the proposals for the Vermont Transit Corridor being considered by Metro would extend a subway line from Wilshire/Vermont station down Vermont Avenue to 120th Street. Metro is also considering other types of mass transit for the line, including light rail and busway options.
Incidents
On December 22, 2006, a rider accidentally spilled a vial of mercury on the platform at Pershing Square station. He notified the operator on a passenger intercom before boarding a train, but Los Angeles County Sheriff's Department did not know of the spillage until eight hours later.[22] In response, Metro implemented new hazardous materials (Hazmat) training to its field employees and operators.[23]
On August 19, 2011, near the Hollywood/Vine station, an altercation between two passengers resulted in one being fatally stabbed.[24] The suspect was arrested on August 24.[25]
On September 4, 2012, a 54-year-old man fell onto the tracks at the North Hollywood station and was hit by an oncoming train.[26] He was rushed to hospital, where he later died.[27]
On May 22, 2018, an unidentified man "probably jumped" onto the tracks at the 7th St/Metro Center station and was hit by an oncoming train. He was rushed to a hospital, where he later died. It is unknown if it was suicide or not.[28]
On April 20, 2024, a woman in her 50s was stabbed in the throat at the Universal City station shortly after 5am. She was taken to a hospital where she died from her injuries.[29]
Notes
^Ridership data is combined for the B and D lines.
^Covarrubias, Amanda (October 18, 2005). ""Is a Busway the Valley Way?; The region's Orange Line is ready to roll but some wonder if it will do much to curtail traffic."". Los Angeles Times. p. A1.
^Lopez, Steve (July 27, 2001). "Hahn Tiptoes in Front of Buses, Is Flattened". Los Angeles Times.