The station is currently under construction with a completion date of 2025. The station box dig out was completed.[when?]Tunnel boring machines were launched here dug the tunnel east to Wilshire/Western station, then returned and launched west to Wilshire/Fairfax station.[citation needed]
This is one of two possible transfer stations with the K Line Northern Extension to Hollywood which are under study, the other being Wilshire/Fairfax station.[5]