Energy in Croatia describes energy and electricity production, consumption and import in Croatia.
As of 2023, Croatia imported about 54.54% of the total energy consumed annually: 78.34% of its oil demand, 74.48% of its gas and 100% of its coal needs.[1]
Croatia satisfies its electricity needs largely from hydro and thermal power plants, and partly from the Krško nuclear power plant, which is co-owned by Croatian and Slovenian state-owned power companies. Renewable energies account for approximately 31.33% of Croatia's energy mix.[1]
Electricity
Hrvatska elektroprivreda (HEP) is the national energy company charged with production, transmission and distribution of electricity.
Production
At the end of 2022, the total available power of power plants on the territory of the Republic of Croatia was 4,946.8 MW, of which 1,534.6 MW in thermal power plants, 2,203.4 MW in hydropower plants, 986.9 MW in wind power plants and 222.0 MW in solar power plants. For the needs of the electric power system of the Republic of Croatia, 348 MW from NPP Krško is also used (ie. 50% of the total available power of the power plant in accordance with the ownership shares).[2]
The total production of electricity in the Republic of Croatia in 2022 was 14,220.5 GWh, whereby 63.7 percent (9,064.9 GWh) was produced from renewable energy sources, including large hydropower plants. In this percentage, large hydropower plants participated with 38.4 percent (5,454.2 GWh), and 25.4 percent (3,610.8 GWh) of electricity was produced from other renewable sources (wind energy, small hydropower plants, biomass, geothermal energy, biogas and photovoltaic systems). Domestic electricity production covered 75.2 percent (14,220.5 GWh) of electricity needs, which in 2022 amounted to 18,915.3 GWh. The import of electricity in 2022 amounted to 11,919.7 GWh, which is 63.0 percent of the total realized consumption. The export of electricity amounted to 7,224.9 GWh, which is 50.8 percent of the total domestic electricity production (14,220.5 GWh).[2]
Hydropower
Croatia has 28 hydropower plants of which 2 are reversible, 2 small size and 1 pumped storage. They are distributed in three production areas: North, West and South with one independent plant, and are HEP's most important source of renewable energy.[3]
Most of Croatian wind energy is produced by companies in private ownership for difference of other types of energy production. Out of 25 wind firms only one is owned by HEP (VE Korlat) while others are mainly owned by private companies or foreign energy corporations.[4]
There are 7 thermal power plants of which 4 are also heating plants and one is combined cycle power plant.[11] Additionally, the first geothermal power plant was opened in 2019, but there are projects and potential for new ones.[12]
In 2014, HEP built nine solar power plants on the roofs of business buildings. The power plants are located in the office building at the headquarters of HEP in Zagreb and the buildings of the HEP Distribution System Operator. Solar power plants have the status of a privileged producer of electricity, which enables the sale of produced electricity to HROTE at a preferential price. Since 2018, Hrvatska elektroprivreda has started building integrated solar power plants according to the concept of a customer with its own production. This model enables a significant reduction in costs for own consumption of electricity. Most of the produced energy is consumed in the buildings themselves, while the rest of the energy is delivered to the distribution network.[18] HEP's first non-integrated power plant was SE Kaštelir, purchased in 2019 from a private producer, and the first independently built was SE Vis, commissioned in 2020.[19]
56 integrated SPP in the status of customer with own production
2.575
2018–present
Transmission
Croatian transmission grid consists of lines on three different rated voltage levels, namely 400, 220 and 110 kV. Total length of high-voltage lines is 7,763.53 km (4,824.03 mi) while length of medium and low voltage lines is 141,936.9 km (88,195.50 mi).[23]
The grid was often the target of attacks during Croatian War of Independence, resulting in frequent black-outs during the period. Since then, the grid has been repaired, and reconnected to synchronous grid of Continental Europe synchronous zones 1 and 2, making it an important transit system again.[24]
Distribution
Under the 2004 Energy law, customers in Croatia are allowed to choose their preferred distributor of electricity. However, HEP Operator distribucijskog sustava or HEP-ODS (a Hrvatska elektroprivreda subsidiary) remains the largest distributor to both industry and households. Its distribution grid is 142,365 km (88,461.51 mi) long, with 26 859 transformers installed, totaling 23,421 MVA of power.[23]
In 2022 there were 2,133,522 customers, 95.8% of which were households.[25]
Development projects
Hydropower
With the implementation of the project HE Senj 2, HEP intends to use the remaining hydro potential in the Lika and Gacka basins by upgrading the existing hydropower system. The project involves the construction of a large reservoir and additional capacity in order to transfer production to the top of the daily chart. This will enable the capacity to inject high regulatory power into the power system with flexible hydro units ready for rapid power change. The construction of the hydroelectric power plant will cost 3.4 billion kuna and will have an installed capacity of 412 MW, while the construction deadline is 2028.[26]
Wind energy
In 2023, Croatia had capacity of 1143 MW of Wind energy.[27] In July 2022, the Spanish company Acciona Energia announced an investment of one hundred million euros in the construction of two wind farms. One will be built in the vicinity of Split, and the other between Šibenik and Knin and will contain 16 wind turbines with a production of 203 GWh of clean electricity per year. The projects named Opor and Boraja 2 will be sufficient to supply 60 thousand households, and the propellers will start spinning at these locations in 2024, after a year and a half of construction and testing. This will avoid the annual emission of 135,000 tons of CO2. In 2013, the same company built the Jelinak wind park worth 48 million euros.[28]
The European Bank for Reconstruction and Development (EBRD) will grant a loan of EUR 43 million to the company Kunovac, jointly owned by the funds Taaleri Energia SolarWind II and ENCRO Kunovac, for the construction and operation of two onshore wind farms in the Zadar region. Zagrebačka banka and Croatian bank for reconstruction and development will participate in the financing with a total loan amount of 126 million euros, and the total network capacity of the two power plants is 111 megawatts, which is enough to power 85,000 households.[29]
In January 2023, the Greek energy company EuroEnergy announced that it was taking over the 114 MW wind farm project in Lika-Senj County. The acquisition reserves the right to expand with an additional 70.5 MW of wind capacity, subject to grid upgrades that can increase production. The value of the project is EUR 150 million and will be realized in the area of Udbina.[30]
The action plan for renewable energy sources at sea is the first comprehensive study that looks at the possibilities of renewable energy development in the Adriatic, and it was financed by the European Bank for Reconstruction and Development. The study considered two technologies: wind farms (stationary and floating) and floating solar farms. Through a spatial analysis of numerous ecological and other technical parameters, the experts came up with data on the possibility of RES development in five zones with an area of 1,260 square kilometers, of which 204 km2 is within the territorial sea. It has been calculated that a 25 GW RES power plant could be installed on that surface. If the area where the medium impact on the landscape is assessed is added to that area, the possible area for RES increases to an additional 1,602 km2 and 44 GW. The development of offshore wind farms in these zones depends on concession agreements between INA and the Republic of Croatia. Also, if hydrocarbon exploitation areas in the central and southern Adriatic are added to that area, a possible 26,000 square kilometers for floating wind power plants and solar power plants will be reached, due to greater depth.[31]
Thermal power
In December 2019, the project of building a new high-efficiency combi-cogeneration unit KKE EL-TO Zagreb began, electric power 150 MW. The construction lasts for three years, and this project will replace part of the dilapidated and obsolete units at the EL-TO Zagreb location.[32] It is expected for a unit to start working in the summer of 2023.
Nuclear power
In 1978, the Adriatic island of Vir was selected as a location for a future nuclear power plant, but these plans were abandoned.[33]
According to reports, since 2009 Croatia has been discussing the option of building a nuclear power plant with Albania, in a location on the shore of Shkodër Lake, on the border with Albania and Montenegro. In April 2009 the Croatian government denied that any agreement had been signed.[34]
In a 2012 poll among 447 Croatian citizens, who were asked "Do you think it is justified to use nuclear energy for the production of electricity?", 42% answered "yes" and 44% answered "no".[35]
In 2021 the Slovenian government has issued an energy permit to GEN Energija for the planning and construction of the second unit of the Krško Nuclear Power Plant, followed by a statement by the Minister of Economy and Sustainable Development of CroatiaTomislav Ćorić that Croatia "will not look benevolently at the construction of the new bloc".[36] In March 2022, Plenković confirmed Croatia's readiness to enter the project of building the second block of the Krško NPP.[37]
Solar power
As of 2021, Croatia had 100 MW of solar power, providing 0.4% of electricity. The potential for solar energy in Croatia is estimated at 6.8 GW, of which 5.3 GW would be accounted for by utility-scale photovoltaic plants and 1.5 GW by rooftop solar systems.[38] Croatia plans to install 1.5 GW of solar capacity by 2024.[39] The total solar power grid-connected capacity in Croatia was 461 MW as 2023.[27]
In May 2023, Acciona Energy announced the construction of the largest solar power plant in Croatia. The new power plant will be spread over three million square meters of rugged state land and will have a capacity of 150 MW, which is enough to meet the needs of around 100,000 households. Its official name is SE Promina.[8]
Battery storage
In September 2022, the European Commission approved state support in the amount of 19.8 million euros for the project of building a large-capacity battery system. The project will be built in Šibenik, and will enter into operation in 2023 with a capacity of 10 MW, and ultimately the capacity will be 50 MW.[40]
Geothermal energy
The results of the geothermal potential research showed that the Virovitica-Podravina County lies on a geothermal basin. The value of the Geothermal Potential Research project in Virovitica-Podravine County, which began in 2019, amounts to 304,169 euros. Therefore, the construction of a geothermal power plant with a capacity of 20 megawatts is planned in that area, which has the potential to become the largest such power plant in Europe. It is designed up to 1,300 meters, and hot water is expected already at 600 meters. An exploratory well was completed in the area of Čađavica, which discovered a geothermal source at a depth of 4,300 meters. The areas of Orahovica, Slatina and Nova Bukovica also have geothermal potential.[41]
^ ab"Energija u Hrvatskoj 2022"(PDF). Energetski institut Hrvoje Požar (in Croatian and English). Ministry of Economy and Sustainable Development, Republic of Croatia. ISSN1848-1787. Retrieved 22 February 2024.
^"Hidroelektrane" [Hydropower plants]. HEP Proizvodnja (in Croatian). Retrieved 30 March 2022.
^ ab"Renewable capacity statistics 2024"(PDF). IRENA (in English, Spanish, and French). Abu Dhabi, UAE: International Renewable Energy Agency. 2024. Retrieved 8 June 2024.
МТУ-55 Мостоукладчик МТУ-55 в техническом музее ОАО «АВТОВАЗ» в г. Тольятти МТУ-55 Классификация танковый мостоукладчик Боевая масса, т 36,0 Экипаж, чел. 2 История Производитель Годы производства с 1962 Годы эксплуатации с 1962 Основные операторы Размеры Длина корпуса, мм 604010 500 с об
Type of love that focuses on feelings In love redirects here. For other uses, see In Love. Not to be confused with Romance languages. This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article is written like a personal reflection, personal essay, or argumentative essay that states a Wikipedia editor's personal feelings or presents an original argument about a topic. Please help improve...
Mérgulo-de-bico-longo Estado de conservação Quase ameaçada Classificação científica Reino: Animalia Filo: Chordata Classe: Aves Ordem: Charadriiformes Família: Alcidae Género: Brachyramphus Espécie: B. perdix Nome binomial Brachyramphus perdix(Pallas, 1811). O Mérgulo-de-bico-longo (nome científico: Brachyramphus perdix) é um espécie de ave da família dos alcídeos encontrada na costa do Pacífico Norte.[1][2] Referências ↑ Friesen, V. L., Piatt, J. F., & Baker, A. J. (1...
اضغط هنا للاطلاع على كيفية قراءة التصنيف رتيبة العقرباويات السوطية[بحاجة لمصدر] المرتبة التصنيفية رتبة[1] التصنيف العلمي النطاق: حقيقيات النوى المملكة: حيوانات الفرقة العليا: ثنائيات التناظر القسم: جميع المفصليات الشعبة: مفصليات الأرجل الشعيبة: عنكبوتيات ال
Anatomi popor senjata api. 1) popor, 2) forend, 3) comb, 4) heel, 5) toe, 6) grip, 7) thumbhole Popor atau lebih dikenal dengan nama stock, buttstock atau shoulder stock merupakan istilah dari bahasa inggris untuk bagian dari senapan atau senjata api lainnya di mana laras dan mekanisme senjata ditempatkan, popor ditempatkan pada bahu dari penembak pada saat senjata api digunakan. Popor dapat juga ditemukan pada busur silang (crossbow) meskipun sebenarnya lebih mirip menjadi tungkai dari busur...
Revolusi paraboloida. Keripik kentang Pringles. Contoh paraboloida hiperbolik. Paraboloida dalam geometri adalah permukaan kuadrat yang memiliki tepat satu sumbu simetri dan tidak ada pusat simetri. Istilah paraboloida berasal dari parabola, yang mengacu pada bagian kerucut yang memiliki sifat simetri yang serupa. Setiap bagian bidang paraboloida dari bidang paralel ke sumbu simetri adalah parabola. Paraboloida-nya adalah hiperbolik jika setiap bagian bidang lainnya adalah hiperbola atau dua ...
One of the 234 State Legislative Assembly Constituencies in Tamil Nadu, in India 10°19′39″N 76°57′19″E / 10.327556°N 76.955271°E / 10.327556; 76.955271 ValparaiConstituency for the Tamil Nadu Legislative AssemblyConstituency detailsCountryIndiaRegionSouth IndiaStateTamil NaduDistrictCoimbatoreLS constituencyPollachiEstablished1967Total electors2,05,479[1]ReservationSCMember of Legislative Assembly16th Tamil Nadu Legislative AssemblyIncumbent T. K. A...
Non-profit organization based in Washington, D.C. This article may rely excessively on sources too closely associated with the subject, potentially preventing the article from being verifiable and neutral. Please help improve it by replacing them with more appropriate citations to reliable, independent, third-party sources. (August 2014) (Learn how and when to remove this template message) The Hispanic Heritage Foundation is a non-profit organization based in Washington, D.C. that works to in...
提示:此条目的主题不是核苷酸多樣性。 SNP DNA 單核苷酸多態性(英語:Single-Nucleotide Polymorphism,簡稱SNP,讀作/snɪp/)DNA序列中单个核苷酸的替代导致的、且分布于种群中相当一部分个体(如:1%以上)中的基因多样性。例如,对于某种生物,同一位置基因组片段一部分为AAGCCTA,另一部分为AAGCTTA,则认为此处存在SNP、两种基因型属于等位基因。 几乎所有常见的单...
American actor This article includes a list of general references, but it lacks sufficient corresponding inline citations. Please help to improve this article by introducing more precise citations. (March 2013) (Learn how and when to remove this template message) Adam WilliamsAdam Williams in Without Warning, 1952BornAdam William Berg(1922-11-26)November 26, 1922New York City, U.S.[1]DiedDecember 4, 2006(2006-12-04) (aged 84)Los Angeles, California, U.S.Occupation(s)Film and tele...
SIM-карта в Польше с лозунгом кампании против разжигания ненависти «Слова имеют силу, используй их с умом» Язы́к вражды́, язык ненависти[1], рито́рика не́нависти (англ. hate speech[1]) — совокупность языковых средств выражения и дискурсов[1] резко отрицательного...
Governor of MorelosIncumbentCuauhtémoc Blancosince October 1, 2018Term lengthSix years, non-renewable.Inaugural holderPedro BarandaFormation1869 The governor of Morelos, which was created with the state of Mexico in 1869. (Morelos was a Federal Territory from June 17, 1914, to February 5, 1917.)[1] Name Party Term Cuauhtémoc Blanco[2] MRN[3][a] Constitutional (2018–2024) Graco Ramírez[4] PRD Constitutional (2012–2018) Marco Antonio Adame Cas...
List of events in the year 1309 ← 1308 1307 1306 1305 1304 1309 in Scotland → 1310 1311 1312 1313 1314 Centuries: 12th 13th 14th 15th 16th Decades: 1280s 1290s 1300s 1310s 1320s See also:List of years in ScotlandTimeline of Scottish history1309 in: England • Elsewhere Events from the year 1309 in the Kingdom of Scotland. Incumbents Monarch – Robert I Events 17 March – Robert the Bruce holds his first Parliament at St. Andrews Deaths 16 July – James Stewart, 5th High St...
2011 American erotic thriller drama television series This article is about the 2011 American television series. For the 2010 Pakistani television drama serial, see Chemistry (serial). ChemistryGenre Erotica Thriller Comedy drama Created by Richard Christian Matheson Norman Steinberg Written by Richard Christian Matheson Norman Steinberg Directed by Mark Haber Brian Trenchard-Smith Michael Robison Starring Ana Alexander Jonathan Chase Ragan Brooks Jeremy Kent Jackson Sally Kellerman Chad Ever...
French writer French and Francophone literature by category History Medieval Renaissance 17th 18th 19th 20th century Contemporary Movements Précieuses Classicism Decadent Parnassianism Symbolism Nouveau roman Writers Chronological list Writers by category Essayists Novelists Playwrights Poets Short story writers Children's writers Countries and regions France Quebec Franco-American Haiti Postcolonial Portals France Literature vte Rémy Belleau Oeuvres compltes 01 Remy (or Rémi) Belleau (152...
Indian author (1934–2021) This article's tone or style may not reflect the encyclopedic tone used on Wikipedia. See Wikipedia's guide to writing better articles for suggestions. (August 2010) (Learn how and when to remove this template message) Manoj DasNative namekuwar sehaj singhBorn(1934-02-27)27 February 1934Sankhari, Balasore, Odisha, IndiaDied27 April 2021(2021-04-27) (aged 87)PuducherryOccupationWriter, columnist, editor, professorAlma materSamanta Chandra Shekhar College, ...
1994 European Parliament election in Italy ← 1989 12 June 1994 1999 → outgoing memberselected membersAll 87 Italian seats to the European ParliamentTurnout73.6% ( 7.5 pp) Party Leader % Seats +/– Forza Italia Silvio Berlusconi 30.6% 27 New PDS Achille Occhetto 19.1% 16 −6 AN Gianfranco Fini 12.5% 11 +7 PPI Rosa R. Iervolino 10.0% 26 +18 Lega Nord Umberto Bossi 6.6% 6 +4 PRC Fausto Bertinotti 6.1% 5 New Segni Pact Mario Segni 3.3% 3 New Greens Carlo Ripa di Meana 3.3%...
Age Wiraksono Asisten Intelijen KasauPetahanaMulai menjabat 16 Januari 2023 PendahuluI Wayan SulabaPenggantiPetahanaPanglima Komando Operasi Udara III ke-7Masa jabatan27 Juni 2022 – 16 Januari 2023 PendahuluSamsul RizalPenggantiDonald Kasenda Informasi pribadiLahir14 Mei 1969 (umur 54) JakartaAlma materAkademi Angkatan Udara (1990)Karier militerPihak IndonesiaDinas/cabang TNI Angkatan UdaraMasa dinas1990—sekarangPangkat Marsekal Muda TNISatuanKorps Penerban...
В Википедии есть статьи о других людях с такой фамилией, см. Резников; Резников, Алексей. Алексей Юрьевич Резниковукр. Олексій Юрійович Резніков Официальный портрет, 2021 17-й министр обороны Украины 4 ноября 2021 — 5 сентября 2023 Глава правительства Денис Шмыгаль Президент В...