The Colombo South Waste Processing Facility (also referred to as the Karadiyana W2E Project or Karadiyana Power Station) is a municipal solid waste-fired thermal power station currently under construction at a 10-acre (40,000 m2) site in Karadiyana, Sri Lanka. Together with the KCHT Power Station, it is one of two projects that won the bid by the Urban Development Authority,[1] from a pool of 121 bidders. Construction of the facility began on 23 August 2017[2] with a completion slated for mid-2019. The estimated cost of the project is approximately US$91 million.[3][4]
The 10 megawatt power station will be operated by Fairway Waste Management (Private) Limited, a subsidiary of the Fairway Holdings. It will use 500 metric tons (1,100,000 lb) of waste, with the generated power sold to the state-owned Ceylon Electricity Board at a rate of Rs. 37.10 per KWh generated. The residual bottom ash from the process will be used for road construction and other uses, while the unusable fly ash (amounting to 2%) will be disposed of at predesignated locations.[3]
This article about a power station is a stub. You can help Wikipedia by expanding it.