The Sampur Power Station (also called Trincomalee Coal Power Plant or TCPP) was a proposed coal-fired power station that was planned to be built in Sampur, Trincomalee, Sri Lanka.
However the construction of the power station was delayed for ten years by various issues including licensing.[4] In September 2016, the Sri Lankan Supreme Court was informed by the Ministry of Power and Renewable Energy that the proposed coal power station would not be constructed in Sampur, after a Fundamental Rights application was filed in May 2016 by an environmental organization.[5][6]