The Class 395 can operate at a maximum speed of 140 mph (225 km/h) under 25kVAC overhead electrification on High Speed 1, and 100 mph (160 km/h) on 750VDC third rail supply on conventional lines. It is typically formed as a six-car train, although they can be rapidly coupled to one another to form a 12-car train as required. The type, which was entirely manufactured in Japan, is the first Hitachi-built rail vehicle to be sold to a European customer,[11][12] as well as being the first British order for a Japanese train.[6] The fleet was ordered during June 2005 by HSBC Rail, and was delivered to the UK between August 2007 and August 2009. Following the completion of 4,000 miles (6,400 km) fault-free running six months ahead of schedule, a 'preview' service was launched between London St Pancras and Ashford via Ebbsfleet on 18 June 2009.[6] These were gradually expanded until the commencement of the full regular service on 13 December 2009.[3]
The use of the high-speed trains as part of the transport infrastructure for the Olympic Park formed part of the original bid for the 2012 Summer Olympics.[13][14] The service was named the Olympic Javelin, which formed the origin of the Javelin nickname.[15] The Olympic services began 28 July 2012.[16] Furthermore, the Class 395 has also been irregularly operated for charter services – though the first such uses did not happen until after the 2012 Olympics due to a lack of free units.[17]
History
Background
In December 2003, formal approval was given by the Strategic Rail Authority for domestic services to be run on the under-construction Channel Tunnel Rail Link (CTRL) in Kent, England, which has since been rebranded as High Speed 1 (HS1).[18] Preliminary consultations for a new franchise including the envisioned 'CTRL Domestic' services along with new rolling stock for operating the said services, which were to begin in 2004.[19] In 2005, the proposed high-speed services were combined with those from the former South Eastern rail franchise to form the Integrated Kent franchise (IKF).[20]
In October 2004, Hitachi was announced as the preferred bidder to supply high-speed trains for the CTRL services.[8][21][22][23] During June 2005, a contract valued at £250million was signed with Hitachi Europe to supply 28 units, with Eversholt Rail Group acting as the financier (ROSCO); at this point, the new fleet had an expected service date of 2009.[24][25][26][27] In November 2005, the Department for Transport announced Govia as the new operator of the IKF.[28]
The contract was Hitachi's first rail vehicle sold to a European customer.[11][12] The company had previously worked with HSBC Rail and UK rail authorities between 2002 and 2003 to demonstrate that the company's traction system was suitable for use on the Great Britain rail network, including testing asynchronous AC motors and confirming electromagnetic compatibility, as part of a separate contract involving the upgrade of existing Class 465 and 466 EMUs.[29] The contract was also the first British order for a Japanese train; as such, Hitachi viewed the deal as a key opportunity to establish itself in the UK market.[6][30]
Construction of the CTRL (High Speed 1) was complete in November 2007. By 2008, the initially planned 'CTRL Domestic' services (2003) from London St Pancras to Gravesend, and Canterbury West and Folkestone Central, via Ashford, had been expanded in scope to include services to Medway Towns, East Kent and Dover.[31] Furthermore, a 29th train was added to the order agreement by franchise holder Southeastern so as to provide additional capacity.[1]
Maintenance depots and training
The contract for the trains included maintenance of the trains;[32] according to Hitachi, the maintenance techniques and schedules of which being initially generated from experience of their Shinkansen cousins in Japan.[33] Maintenance services are provided via a consortium, referred to as 'DEPCO', which included HSBC Rail (finance), Fitzpatrick Contractors Ltd (construction), RPS Burks Green (architects/civil engineers), EMCOR UK (mechanical and electrical plant) and GrantRail (trackwork) constructed a new maintenance depot building at Ashford and the updating of the existing depot site.[4][34][35][36]
The new Ashford Depot was constructed on the site of the Ashford Down Yard Carriage Sidings,[37][note 1] and formally opened on 2 October 2007.[38] The facility included a five-track trainshed with bogie drop made by BBM and train lifting equipment from Mechan. A second building housed a wheel lathe from Sculfort. Other facilities included carriage washing plant, a 25kV OHL test track, and sidings for rolling stock.[36] The design and layout of the depot, which was optimised specifically for the Class 395, enables the most efficient workflow possible, including minimal complex shunting actions, physical minimisation wherever reasonable, and in line with modern data management practices.[39]
A Class 395 train simulator supplied by Corys TESS was acquired for use at Southeastern's training centre in Ashford for driver training.[40][41] Southeastern's co-parent company SNCF also assisted with high-speed driver training.[42] The DEPCO consortium also updated Ramsgate train depot for the IKF with facilities including storage sidings for the Class 395 trains and light maintenance facilities.[36]
Testing and preview service
Pre-shipping factory tests included static and dynamic load tests, traction and braking tests, including tests on a 750VDC third-rail system specially installed at Hitachi's test track.[43] This round of manufacturer tests included the use of supercomputers to conduct both simulations and verification tests.[30]
The first train was delivered from Japan to Southampton Docks on 23 August 2007.[44] Days later, it was unveiled by Secretary of State for TransportRuth Kelly at a media event held at Hitachi's new Ashford maintenance facility.[6] Following the delivery of the first four units in March 2008, production was temporarily put on hold while these units were subjected to extensive UK-based testing. Homologation testing was undertaken by Serco.[45][46] SNCF International assisted with testing of KVB and TVM 430 signalling systems, with speeds of 240 km/h (150 mph) attained in January 2008.[43][47]
Following the successful completion of these tests, production and shipping of the main production tranche commenced in December 2008.[6][48][49] Each train was required to demonstrate 5,000 mi (8,000 km) of fault-free operations prior to their acceptance by Southeastern.[6] The final three trains arrived in the UK in August 2009,[2][1][50] with the final train delivered to Southeastern on 11 December 2009.[51]
The performance metric of 4,000 miles (6,400 km) fault-free running was achieved six months ahead of schedule, clearing the way for a 'preview' service to be offered between London St Pancras and Ashford via Ebbsfleet. On 18 June 2009, these were ceremonially launched by the Secretary of State for Transport Andrew Adonis, although the preview service only became available to general passengers on 29 June.[6] The preview service allowed for further train testing under real-world conditions,[52] during which the type reportedly achieved a 99% punctuality rate in the first month of operations.[2][1][53] In September 2009, preliminary services were launched to the Kent coast (Dover via Folkestone, and Ramsgate via Canterbury).[54][55][56] During November 2009, preview services commenced on the North Kent line as well.[57][58]
Even during the preview service, the Class 395 presented several performance improvements in comparison to conventional rolling stock, including its high rate of acceleration, lower noise levels (primarily attributed to its air conditioning arrangements), and its aesthetic appeal. Railway journalist Richard Clinnick observed several minor shortcomings of the interior, such as the somewhat cramped seating arrangement and the lack of securing straps at the baby changing facility, but positively reviewed the overall package.[6] In September 2010, it was reported that several passengers were concerned by the presence of a 'wobbling' motion that occurred within some tunnel sections; the phenomenon was described by Southeastern as non-dangerous, but all trains were fitted with dampers that prevent any recurrence of the issue.[59][60]
Station with limited or peak-hour-only High Speed service
This section needs expansion with: details on current operations. You can help by adding to it. (November 2022)
A full regular service commenced on 13 December 2009.[3][61] Initial services included a half-hourly north Kent service to and from St Pancras, London, via Stratford, Ebbsfleet, Gravesend, Strood, Rochester, Chatham, Gillingham, Rainham, and Sittingbourne to Faversham, a half-hourly service to East Kent via Stratford, Ebbsfleet, Ashford with one train continuing to Margate via Canterbury West, Ramsgate and Broadstairs, with the other to Dover via Folkestone West and Folkestone Central.[62] Seven million journeys were made in the first year of operation.[63]
The introduction of the trains was generally successful, with good reliability and passenger satisfaction figures. The new high-speed services also caused an increase in passenger numbers above that already being experienced on the Kent network.[64][65][66] On introduction, timetabled journeys to London from Ebbsfleet were reduced from 51 to 18 minutes, whilst trains using the entire length of High Speed 1 (starting in Ashford) had timetabled journeys reduced by around 45 minutes.[67]
However, the service has been criticised as being of limited use to many London commuters because trains terminate at St Pancras. Additionally, the change in service patterns to accommodate high-speed trains resulted in some non-high-speed services in Kent becoming slower.[68]
In May 2011, a limited service from Maidstone West via Strood and Gravesend started,[69] followed in September 2011 by a limited service from Sandwich via Deal to London St Pancras (partially subsidised by Kent County Council).[70][71] In 2013, four years after the service started, total passenger numbers were ten million and punctuality was 92.6% (compared to 90.1% nationwide).[72][better source needed]
The 400 Series Mini Shinkansen[73] and Hitachi's A Train design form the basis of the Class 395 design.[8][6] From the 400 Series the class inherits the same six-car trains with 20-metre (65 ft 7 in) carriages, but with two doors per side placed one-third and two-thirds along the carriage instead. [note 2] Both types of train are designed for operations at high speed on newly built lines, as well as at lower speed on conventional legacy lines.[74] Unlike the steel-bodied 400 Series, the Class 395 has its carbody (walls, roof, floor) formed from friction stir welded (FSW) double-walled hollow extruded aluminium body panels, a technology that Hitachi Rail considers to be a part of its A-Train train family specification.[8][75] The manufacturer claims that the FSW approach achieves minimal strain while providing a lightweight and high strength carbody in comparison to conventional techniques.[75]
Each Class 395 unit contains six cars, formed DPT1-MS1-MS2-MS3-MS4-DPT2.[note 3] The intermediate cars carry the traction motors - one at each axle - while the unpowered outer cars carry the pantographs.[7] The bogies are bolsterless, with both powered and unpowered bogies sharing a common design to simplify maintenance.[75] Each six-car unit can work in multiple with another to create 12-car trains. The coupling process is automated and has been designed to take less than 60seconds.[75][76]
The propulsion system of the Class 395 comprises 16 electric motors each rated to produce 210 kW (280 hp) that work in conjunction with four IGBT converter/inverter units.[7] In combination with its braking system, it can achieve a peak acceleration rate of 0.7 m/s2 (2.3 ft/s2) and a normal maximum deceleration rate of 0.9 m/s2 (3.0 ft/s2), although the latter can be elevated to 1.2 m/s2 (3.9 ft/s2) under emergency circumstances. The train uses an electrically operated air brake system, supplied by Faiveley.[77][7] Approximately 40% of the train's components were sourced from suppliers within the European Union.[78]
Each six-car train is fitted with 340 seats in 2+2 formation, all standard class, with an additional twelve tip-up priority seats located in an indicated wheelchair area near the vestibules of the DPT1 vehicle.[6] There is no separation between the vestibules and the main interior save for wind shields.[79] There are two toilets per unit, one of which is larger and designed to be universally accessible.[5][80][81] The seats are mostly arranged 'airline' style, though there are also a small number of table seats present in each car.[6] Nearly all seats feature flip-down tables and coat hooks, while a single electrical socket has been provided for each pair of seats. The interior design and layout is in conformance with the Rail Vehicle Accessibility Regulations 2010.[79]
The trains meet UK Railway Group Standards (RGS), and European Union Technical Specifications for Interoperability (TSI) standards for crashworthiness, and UK or EU standards for structure-load-bearing behaviour, material strength, aerodynamics, noise and fire resistance.[82] Key areas of the train's design that were heavily influenced by these standards were its fireproofing measures and crashworthiness approach, which Hitachi observed to bear considerable differences with their corresponding Japanese standards.[83] In addition to the applicable standards, the Class 395 was greatly shaped by the various criteria specified by the customer. Wherever it has been beneficial to do so, the various technologies and new approaches developed for the type have been incorporated by Hitachi back into its main product lines.[84]
Each train is equipped with a computer-based Train Management System (TMS), which incorporates numerous monitoring systems, communications, environmental controls, and enables the train crew to control various onboard systems, including Selective Door Operation (SDO). The TMS features considerable redundancy, which has enabled it to obtain a SIL 2 safety certification.[85] The SDO system uses a combination of GPS and train speed integration to estimate its position and identify the station at which the train has stopped, simplifying the correct door selection sequence.[85] For reliability, passenger doors use a relatively simple sliding pneumatic system that has already been in use for several decades on Shinkansen trains.[4][86]
The fleet is currently being refurbished at a cost of £27 million. New carpets, lighting, customer information and digital media screens and USB sockets are being installed. Panels and seat grab handles are being repainted and seat covers are being replaced.[87]
At 3pm on 23 October 2017, 395008 (heading towards London St Pancras) struck a delivery van on a level crossing near Teynham between Faversham and Sittingbourne.[95]
Model railways
In 2009 Hornby Railways launched two model versions of the BR Class 395, a super detailed model, and a basic representation of the prototype as part of their Railroad range both in South Eastern Blue livery and in 2012 Hornby released a special Olympic Games Livery in both super detail and basic in OO gauge.[96]
^This layout, often used for commuter trains, was selected in order to fulfil requirements that the train have a maximum station dwell time not exceeding 90seconds.[4]
^DPT = Driver's cab, Pantograph, Trailer car; MS = Motor car, Standard class (open saloon).[4] Some sources refer to the cars as DPTSO (Driver's cab, Pantograph, Trailer car, Second class, Open saloon) and MSO (Motor car, Second class, Open saloon) respectively.
^"London 2012 venue: Olympic zone". BBC News. London: British Broadcasting Corporation. 16 January 2004. London's bid team say the Olympic Park will be served by 10 train lines, including 'Olympic Javelin' bullet trains providing a link to the city centre in seven minutes.
^ abcdeLindsay, Doug (15 September 2019). "Operation 'Javelin'". The Railway Magazine. Horncastle: Mortons Media Group. Archived from the original on 5 August 2020. Retrieved 26 November 2022.
^"News in Brief". Railway Gazette International. Sutton: DVV Media International. 1 July 2005. Archived from the original on 4 November 2012. Retrieved 4 August 2009.
^Ojima, Hirofumi (24 January 2008). "Networkers get a traction transplant". Railway Gazette International. Sutton: DVV Media International. Archived from the original on 1 October 2012. Retrieved 26 November 2022.
^"High-speed simulator". Railway Strategies. Norwich: Schofield Publishing. 1 November 2007. Archived from the original on 4 March 2016. Retrieved 26 November 2022.
^Rapport d'Activité 2008(PDF) (in French). Paris: SNCF International. 18 March 2009. p. 10. Archived from the original(PDF) on 24 August 2009. Retrieved 26 November 2022. Dans le cadre d'un contrat conclu entre SNCF International et Hitachi, des experts du Centre d'Ingénierie du Matériel de la SNCF étaient à bord des trains à Grande Vitesse Class 395 de l'opérateur SouthEastern pour contrôler le bon fonctionnement des équipements de sécurité. Des tests à 240 km/h ont eu lieu en janvier 2008 pour valider définitivement les dispositifs des premières rames livrées en Grande-Bretagne
^"High speed service". Newcastle upon Tyne: London & South Eastern Railway. 8 October 2008. Archived from the original on 13 September 2012. Retrieved 26 November 2022.
^"High Speeding To Success". Newcastle upon Tyne: London & South Eastern Railway. 14 June 2010. Archived from the original on 25 June 2010. Retrieved 5 January 2012.
British British people British Empire British Nigerians British Israelism British protectorate British nationalism British nationality law British passport British Airways British idealism British Raj British Academy British Invasion British Waterways British blues Royal British Legion British Emperor British comics White British British Asians British Rail British Museum British Americans British Guiana British occupation of Manila British Peruvians British Somaliland British Columbia British subject British North America Acts Terminology of the British Isles Gaumont-British British rule in B…
urma British national identity British Uruguayans British Naturism The British Museum Friends British Isles British school British Cycling British Aluminium British Gas British space programme British prince British Championship British Spanish British Library British Shipbuilders British Columbia Hussars British Antarctic Territory British Honduras British languages British Cyprus British cuisine British Lion Films British Midland International British colonization of the Americas British Shorthair British Boy Scouts and British Girl Scouts Association British Jews British Caledonian British Overseas Territories citizen British Overseas Territories British Ceylon Order of the British Empire Colony of British Columbia (1866–1871) British Tamils British Land British Sign Language British West Indies British Weihaiwei British soul British Bulldog British Pashtuns British Iraqis British Overseas citizen British sitcom British America British English British Kaffraria British Pakistanis British diaspora British Army British Indians British Iron Company Outline of British Columbia Names of the British Isles British Latin American History of the British Isles British Sugar British West
Philippine superhero television series DarnaPromotional posterAlso known as Mars Ravelo's Darna Darna: The TV Series Genre Superhero Science fiction Drama[note 1] Action[note 1] Fantasy[note 1] Based onDarna by Mars RaveloWritten by Ma. Carmela Abaygar Hannah Rhocellhynnia H. Cruz Jasper Emmanuel A. Paras Jann Kayla C. Mendoza Inaque EranaDirected by Chito S. Roño (first final weeks) Avel E. Sunpongco Benedict Mique Darnel Joy Villaflor Starring Jane De Leon Joshua Garci…
Indian reserve in Ontario, CanadaLake of the Woods 37BIndian reserveLake of the Woods Indian Reserve No. 37BLake of the Woods 37BCoordinates: 49°19′N 94°49′W / 49.317°N 94.817°W / 49.317; -94.817Country CanadaProvince OntarioDistrictKenoraFirst NationAnimakee Wa Zhing 37Area[1] • Land1.06 km2 (0.41 sq mi) Lake of the Woods 37B is a First Nations reserve[1] in Kenora District, Ontario. It consists of an island ne…
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.Find sources: Albany State Golden Rams – news · newspapers · books · scholar · JSTOR (April 2018)This article reli…
Municipality in Carazo, NicaraguaSan MarcosMunicipalitySan Marcos, Carazo in 2019San MarcosLocation in NicaraguaCoordinates: 11°55′N 86°12′W / 11.917°N 86.200°W / 11.917; -86.200Country NicaraguaDepartmentCarazoArea • Municipality46 sq mi (118 km2)Population (2022 estimate)[1] • Municipality33,303 • Density730/sq mi (280/km2) • Urban21,895 San Marcos is a town and a municipality …
Friedrich von PayerVice-Chancellor of the German EmpireIn office9 November 1917 – 10 November 1918ChancellorGeorg von Hertling, Maximilian of Baden, Friedrich EbertPreceded byKarl HelfferichSucceeded byEugen SchifferMember of the Reichstag for Tübingen-ReutlingenIn office1877–1878Member of the Reichstag for Tübingen-ReutlingenIn office1880–1887Member of the Reichstag for Tübingen-ReutlingenIn office1890–1918 Personal detailsBorn(1847-06-12)12 June 1847Died14 July 1931(1931-07…
Vadim Virny (links) tegen de latere winnaar Harm Wiersma De achtkamp om het wereldkampioenschap dammen 1983 was een dubbelrondig toernooi dat van 3 t/m 16 juli 1983 in Amsterdam werd gespeeld. Winnaar met 18 punten uit 14 partijen werd Harm Wiersma. Hij eindigde 1 punt voor nummer 2 Vadim Virny en 2 punten voor de nummers 3 Rob Clerc en Anatoli Gantvarg. Titelverdediger Jannes van der Wal was niet in vorm en eindigde met 7 punten afgetekend op de laatste plaats. Het toernooi werd georganiseerd a…
انتخابات البرلمان العراقي 2010 العراق → 7 مارس 2010 نتائج الانتخابات العراقية الانتخابات النيابية العراقية لعام 2010 هي انتخابات لمجلس النواب العراقي تم إجرائها في العراق في 7 مارس 2010 وتنافس بالانتخابات قرابة 6281 مرشحاً بينهم 1813 امراة توزعوا على 12 ائتلافاً كبيراً و167 كيا…
Lead ship of Accentor-class minesweeper For other ships with the same name, see USS Accentor. USS Accentor History United States NameAccentor NamesakeAccentor BuilderW. A. Robinson, Inc., Ipswich, Massachusetts Laid down21 January 1941 Launched10 May 1941 Commissioned24 July 1941 Decommissioned1 September 1942 In service1 September 1942 Out of service14 June 1946 Stricken3 July 1946 Identification Hull symbol:AMc-36 Code letters:NAEO FateSold as surplus, October 1946 General characteristics Clas…
1975 film This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article needs a plot summary. Please add one in your own words. (September 2023) (Learn how and when to remove this template message) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources:…
American basketball player Garland O'ShieldsO’Shields from the 1945 VolunteerPersonal informationBorn(1921-05-23)May 23, 1921DiedJanuary 17, 2001(2001-01-17) (aged 79)NationalityAmericanListed height6 ft 1 in (1.85 m)Listed weight195 lb (88 kg)Career informationHigh schoolSpartanburg(Spartanburg, South Carolina)College Spartanburg CC Tennessee (1944–1946) Playing career1946–1948PositionGuardNumber9Career history1946–1947Chicago Stags1947Syracuse Nationals194…
Halfdan Strøm - Portrait of Karen Hannover - NG.M.01831 - National Museum of Art, Architecture and Design Karen Anna Hannover née Topsøe (1872–1943) was a Danish ceramist. With no formal education in art, while in Paris in 1892–94, she was inspired to take an interest in culture by her aunt, the painter Anna Petersen. This led to contacts with the artist Jens Ferdinand Willumsen and the poet Sophus Claussen. In 1897, she married the art historian Emil Hannover who took a special interest …
Former local government district in England Easington DistrictShown within ceremonial County DurhamHistory • OriginEasington Rural DistrictSeaham Urban District • Created1974 • Abolished2009 • Succeeded byCounty Durham StatusDistrictONS code20UFGovernmentEasington District Council • HQEasington Easington was, from 1974 to 2009, a local government district in eastern County Durham, England. It contained the settlements of Easington,…
Hydrogen deuteride Names IUPAC name Hydrogen deuteride Systematic IUPAC name (2H)Dihydrogen[citation needed] Identifiers CAS Number 13983-20-5 Y 3D model (JSmol) Interactive image ChemSpider 146609 Y ECHA InfoCard 100.034.325 EC Number 237-773-0 PubChem CID 167583 UN number 1049 InChI InChI=1S/H2/h1H/i1+1 YKey: UFHFLCQGNIYNRP-OUBTZVSYSA-N YInChI=1/H2/h1H/i1+1Key: UFHFLCQGNIYNRP-OUBTZVSYED SMILES [2H][H] Properties Chemical formula HD Molar mass 3.02204…
Trade pact between Asian nations China–Pakistan Free Trade AgreementChina–Pakistan Free Trade AgreementTypeBilateral Free Trade AgreementSignatories2 (Pakistan and China)Negotiations for phase one commence24 November 2006Phase one signed7 July 2007Phase one concludedDecember 2012Negotiations for phase two commenceJuly 2013Phase two signed28 April 2019Phase two ratified1 January 2020Phase two intended conclusion2024 The China–Pakistan Free Trade Agreement (CPFTA) is a free trade agreement (…
37th FIS Alpine World Ski ChampionshipsHost citySt. Moritz, SwitzerlandEvents10Opening2 February 2003Closing16 February 2003Opened byPascal Couchepin← 20012005 → Piz Nairclass=notpageimage| Location of Piz Nair in Switzerland Piz Nairclass=notpageimage| Location of Piz Nair in the Alps of Europe The FIS Alpine World Ski Championships 2003 were held in St. Moritz, Switzerland, at Piz Nair from February 2–16, 2003.[1] St. Moritz previously hosted the world champions…
Climate Index Countries by Environmental Performance Index (2020) The Environmental Performance Index (EPI) is a method of quantifying and numerically marking the environmental performance of a state's policies. This index was developed from the Pilot Environmental Performance Index, first published in 2002, and designed to supplement the environmental targets set forth in the United Nations Millennium Development Goals.[1] The EPI was preceded by the Environmental Sustainability Index (…
شركة أوكيوالشعارمعلومات عامةالجنسية سلطنة عمان التأسيس 1996النوع شركة حكومية تابعة لسلطنة عمانالمقر الرئيسي سلطنة عمانموقع الويب oq.com… المنظومة الاقتصاديةالصناعة الاستثمار في قطاعي النفط والغاز والمجالات المرتبطة بالطاقةأهم الشخصياتالمؤسس سياسة عمان تعديل - تعديل مصدري …
VirginioBackground informationBirth nameVirginio SimonelliBorn (1985-01-31) January 31, 1985 (age 38)Fondi (LT), Lazio, ItalyGenresPopOccupation(s)SingerInstrument(s) Vocals piano Years active2005–presentLabelsUniversal Music(2005-2006, 2011-2014, 2022-present) iMean Music(2015-2019)MP Film(2020-present)Websitevirginiosimonelli.itMusical artist Virginio Simonelli (Italian pronunciation: [virˈdʒiːnjo simoˈnɛlli]; born January 31, 1985), simply known as Virginio, is an Italian …
Ferrari 246 SP Ferrari 268 SP Prova Общие данные Производитель Ferrari Годы производства 1961—1962 Дизайн и конструкция Тип кузова 2‑дв. родстер (2‑мест.) Компоновка задняя среднемоторная, заднеприводная Колёсная формула 4 × 2 Двигатель 2.4-V6 Общие данные Производитель Ferrari Код двигате…
هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (مارس 2020) صفية بنت الملك صبير الحنّكابي، بنت أحد ملوك الشايقية في القرن التاسع عشر. قاد والدها الملك صبير الشايقية في موقعة جبل الضيقة ضد الأتراك عام 1820م. ولما انهزم الشا…