The NASA-ISRO Synthetic Aperture Radar (NISAR) mission is a joint project between NASA and ISRO to co-develop and launch a dual-frequency synthetic aperture radar on an Earth observation satellite. The satellite will be the first radar imaging satellite to use dual frequencies. It will be used for remote sensing, to observe and understand natural processes on Earth. For example, its left-facing instruments will study the Antarcticcryosphere.[7] With a total cost estimated at US$1.5 billion, NISAR is likely to be the world's most expensive Earth-imaging satellite.[8]
The mission is a partnership between NASA and ISRO.[10] Under the terms of the agreement, NASA will provide the mission's L-bandsynthetic aperture radar (SAR), a high-rate telecommunication subsystem for scientific data GPS receivers, a solid-state recorder, and a payload data subsystem. ISRO will provide the satellite bus, an S-bandsynthetic aperture radar (SAR), the launch vehicle, and associated launch services.[12]
All data from NISAR will be freely available one to two days after observation and within hours in case of emergencies like natural disasters.[9] Data collected from NISAR will reveal information about the evolution and state of Earth's crust, help scientists better understand our planet's natural processes and changing climate, and aid future resource and hazard management.[10]
The satellite will be three-axis stabilized. It will use a 12 m (39 ft) deployable mesh antenna and will operate on both the L- and S- microwave bands.[10] The aperture mesh reflector (antenna) will be supplied by Astro Aerospace, a Northrop Grumman company.[13]
ISRO's share of the project cost is about ₹788 crore (US$94 million), and NASA's share is about US$808 million.[14][15]
Launch
The satellite was to be launched from India aboard a GSLV Mark II on 30 March 2024, but it has been postponed till further notice due to a needed hardware update.[5] The orbit will be a sun-synchronous, dawn-to-dusk type. The planned mission life is three years.[1] The satellite was fully integrated in January 2024 and was performing its final testing and analysis in preparation for launch.[16] However, in an interview with the Times of India, Chairman of ISRO S. Somanath said that though the GSLV for NISAR will be built by March-April, the satellite is still undergoing tests and they were expecting some delay. They are now expecting to launch the satellite in the second half of the year.[17] Tests found that the reflector might face higher-than-expected temperatures when stowed during flight and so it was returned to the manufacturer in California to apply a reflective coating to mitigate the risk of overheating.[18][19]
^ abFoust, Jeff (24 March 2024). "Antenna work delays NISAR launch". SpaceNews. Retrieved 2 April 2024. In a March 22 statement, NASA said a new launch date for the NASA-ISRO Synthetic Aperture Radar (NISAR) mission will be set at the end of April.
^"NISAR Mission". ISRO. 19–20 November 2015. Archived from the original on 4 August 2020. Retrieved 16 March 2021.