Interstate 64 (I-64) in the US state of Virginia runs east–west through the middle of the state from West Virginia to the Hampton Roads region, for a total of 299 miles (481 km). From the West Virginia state line to Chesapeake, it passes through the major cities of Lexington, Staunton, Charlottesville, the state capital of Richmond, Newport News, Hampton, and Norfolk. It is notable for crossing the mouth of the harbor of Hampton Roads on the Hampton Roads Bridge–Tunnel (HRBT), the first bridge–tunnel to incorporate artificial islands, concurrent with U.S. Route 60 (US 60). Also noteworthy is a section through Rockfish Gap, a wind gap in the Blue Ridge Mountains, which was equipped with an innovative system of airport-style runway lighting embedded into the pavement to aid motorists during periods of poor visibility due to fog or other conditions.
Route description
Alleghany County to Charlottesville
I-64 enters Virginia as a four-lane divided highway, continuing its concurrency with US 60 through Covington into Lexington where the two routes split. From Lexington, I-64 then turns northward to Staunton, overlapping I-81 in the Shenandoah Valley. From Staunton, I-64 leaves I-81, passes through Waynesboro, crosses Rockfish Gap, and continues eastward, passing just to the south of Charlottesville, closely following the path of the historic colonial-era Three Notch'd Road, which had been established in the Colony of Virginia by the 1730s and was largely replaced in the 1930s by US 250.[3] Just outside of Charlottesville in Zion Crossroads, I-64 received the state's first diverging diamond interchange at its interchange with US 15, which opened to traffic on February 21, 2014, and was completed on April 15, 2014.[4][5][6]
This portion of I-64 was set up by the Virginia Department of Transportation (VDOT) with a contraflow lane reversal system in place in the event of a mass evacuation of the Hampton Roads area region due to a hurricane or other catastrophic event. Gates are installed at the eastbound I-64 entrance and exit ramps from exit 200 (I-295) to exit 273 (US 60 east of the HRBT), and crossover roads are in place near the aforementioned exits.[7]
About a mile (1.6 km) before the southern interchange with State Route 199 (SR 199), I-64 becomes a six-lane divided highway as it continues toward Hampton Roads. Shortly after entering its interchange with SR 173 (Denbigh Boulevard), I-64 enters the Hampton Roads metropolitan area and widens out to an eight-lane divided highway, continuing generally south-southeasterly into Hampton where it meets the northern terminus of I-664 beginning the Inner Loop of the Hampton Roads Beltway. I-64 curves north-northeast to pass north of Downtown Hampton and cross the Hampton River, turning back southward to reach the Hampton Roads Bridge–Tunnel, which it utilizes to cross the main shipping channel at the entrance to the harbor of Hampton Roads from the Chesapeake Bay. Once on the Southside, I-64 turns south through Norfolk, passing the eastern boundary of Naval Station Norfolk and Chambers Field and the spur route supplying it, I-564. It then becomes a six-lane divided highway with a two-lane reversible roadway in the middle, which is used for HOV traffic during morning and afternoon rush hours. It continues through Norfolk, curving multiple times and eventually ending up heading due south as it passes the interchange with another of its spur routes, I-264 on the northwest side of Virginia Beach.
After I-264, there are no more directional markers on I-64 from here to its "eastern" terminus because I-64 "east" will actually head west after its current southward course, and vice-versa. From I-264 to its "eastern" terminus, it is simply only signed as I-64 and either the Inner and Outer loop of the Hampton Roads Beltway.
Shortly after the I-264 interchange, I-64 leaves Virginia Beach for the city of Chesapeake. It soon comes to a complex interchange between another of its spur routes, I-464, along with US 17 and SR 168. I-64, now running westward, crosses the Southern Branch Elizabeth River using the High Rise Bridge. The road then curves northwesterly and ends at Bower's Hill, where it meets both the western terminus of I-264 and the southern terminus of I-664 near the northeastern corner of the Great Dismal Swamp. I-64's lanes continue northbound as I-664 to Newport News across the Monitor–Merrimac Memorial Bridge–Tunnel (MMMBT), ending at I-64 in Hampton, completing the beltway.
History
This section needs expansion. You can help by adding to it. (August 2023)
The decision was on hold for three years while the state continued planning for the piece of the US 250 alignment from Richmond to Short Pump, which would be needed anyway to handle traffic.[12] In 1961, US Secretary of Commerce Luther H. Hodges rejected that plan and chose the present route, leaving Lynchburg as the largest city in Virginia not served by an Interstate. Officially, the chosen route was considered more efficient. However, there is speculation that the decision involved "back-room" politics of the Kennedy administration.[13]
Auxiliary routes
I-64 has four auxiliary routes, all of which are in the Hampton Roads Area:
I-264—A bypass route serving the Virginia Beach Oceanfront, Downtown Norfolk, and most of Portsmouth.
I-464—A connector route serving the western side of Chesapeake, Portsmouth, and Downtown Norfolk. It connects I-64 in Chesapeake to I-264 in Norfolk.
I-664—A bypass route serving Chesapeake, Suffolk, Newport News, and Hampton.
Both of the bypass routes are shorter than the main leg for through traffic—I-664 is about 15 miles (24 km) shorter than the bypassed main leg while I-264 is about a mile (1.6 km) shorter than the main leg it bypasses.
On December 22, 2019, around 69 cars were involved in a pileup on I-64 westbound at the Queen's Creek Bridge near exit 238 (SR 143 east). 51 injuries were reported, including two life-threatening. Per reports, ice and fog were seen at that time.[14][15]
Current and future projects
I-64 widening projects
Two segments on I-64 have been identified as candidates for widening: I-64 on the Virginia Peninsula from New Kent County to Newport News and I-64 in South Hampton Roads from the I-464/US 17/SR 168 interchange in Chesapeake to the Bowers Hill Interchange in Suffolk.
Peninsula
On the Peninsula, most of the I-64 corridor is a four-lane roadway and is one of the most-traveled segments in the region, connecting the Hampton Roads metropolitan area to the Greater Richmond Region. In recent years, the corridor has become a major bottleneck for traffic, with over half of the entire 75-mile (121 km) stretch having failing or near failing levels of service and continued increased safety concerns.[16] In 2011, VDOT initiated a study that would consider widening the highway with either additional general purpose lanes in the median and/or on the outside shoulder, adding two-lane, fully reversible managed lanes (either as a tolled express lane or an HOT-lane facility) or the addition of full tolling on the entire span.[17] The approved plan selected by VDOT and partners included the plan that added an additional general purpose lane in each direction by either expanding into the median or on the outside shoulder.[18] In June 2013, the Commonwealth Transportation Board (CTB) included $100 million (equivalent to $129 million in 2023[19]) in funding for the project in its Six-Year Improvement Program, allowing the project to move forward into the design and build phases. The Hampton Roads Transportation Planning Organization (HRTPO) allocated an additional $44 million (equivalent to $54.8 million in 2023[19]) to Segment I of the project to extend the boundaries beyond the Fort Eustis interchange.[20] The project is broken down into three operationally independent segments, which are independently funded, designed and built by a different company.
Segment I encompassed the portion of I-64 beginning west of SR 143 (Jefferson Avenue; exit 255) to just east of SR 238 (Yorktown Road; exit 247). Construction on this segment began in September 2015 and was completed December 1, 2017.[20] It was managed by Shirley Contracting Company LLC at a total cost of $122 million (equivalent to $149 million in 2023[19]).
Segment II began 1.05 miles (1.69 km) west of SR 199 (Humelsine Parkway/Marquis Center Parkway) near exit 242 and ended 0.54 miles (0.87 km) east of SR 238 (Yorktown Road) near exit 247, where Segment I ends. Construction on this segment was managed by Alan Myers VA LLC and costed $138 million (equivalent to $162 million in 2023[19]). Construction began in the autumn of 2016 and was completed in spring 2019.[21]
Segment III begins approximately one mile (1.6 km) west of SR 199 (Newman Road; exit 234) to 1.05 miles (1.69 km) west of SR 199 (Humelsine Parkway/Marquis Center Parkway; exit 242), where Segment II ended. Construction on this segment is managed by Shirley Contracting Company LLC with an estimated cost of $178 million. Construction began in August 2018 and is estimated to be complete in autumn 2021.[22]
In the Richmond area, a project to widen I-64 to six lanes from exit 200 (I-295) in Henrico County to exit 205 (Bottoms Bridge) in New Kent County. The project was managed by Corman-Branch, a joint venture at an estimated cost of $43 million (equivalent to $50.5 million in 2023[19]). Construction began in August 2017 and was completed in summer 2019.[23]
Southside
Similar to I-64 west of Newport News on the Peninsula, VDOT and the HRTPO undertook environmental and preliminary engineering studies for the improvement of the eight-mile (13 km), 48-year-old corridor of the I-64 from I-464 in Chesapeake to the Bower's Hill Interchange. This included replacing the functionally obsolete High Rise Bridge, which was completed one year after the study corridor opened, in 1969.
This study, completed in 2013, showed that the corridor frequently performed at near-failing levels of service (level of service grades D and E), with the High Rise Bridge itself outright failing, resulting in higher crash rates when compared to other areas in the region.[24] This is because most of the interchange ramps were built to previous Interstate standards and were based on then-rural development in the Western Chesapeake and Eastern Suffolk.[25] In addition, since the start of tolling at the Elizabeth River Tunnels, the High Rise Bridge and the corridor has received a nearly seven-percent increase in traffic during peak hours, further exacerbating the problem.[26]
In March 2015, the CTB identified and approved of the addition of two lanes of capacity in each direction,[27] with the possibility of them being either two HOT lanes, one HOV and one general-purpose lane, or all four lanes being tolled. Widening would be accomplished by adding the lanes in the median east of US 17 and to the outside shoulder west of US 17.[28] The approved plan also calls for the construction of a new, four-lane 135-foot (41 m) fixed-span bridge to the south of the current High Rise Bridge. Construction will be conducted in multiple phases, similar to the widening project on the Peninsula:
The first phase of the project would widen I-64 to three lanes in each direction by adding the new lane to the median in both directions as a managed lane, begin the construction of the new High Rise Bridge, and replace and rehabilitate other existing bridges in the area. This segment is estimated to cost around $600 million.[29]
The second phase would see all six lanes of I-64 shifted to the newly constructed bridge while the old bridge is demolished and replaced with a new four-lane bridge that would eventually carry Inner Loop (I-64 west) traffic.
The final phase would see the addition of the fourth lanes of traffic added to both directions and the shift of Inner Loop/I-64 west to the newly reconstructed bridge.
Once completed, the entire corridor would be an eight-lane stretch of highway, with two 135-foot (41 m) fixed-span bridges. Estimated costs for the entire project are currently estimated at $2.3 billion.[28] Currently, only part of first phase of the plan has been funded, which includes preliminary engineering and right-of-way service. A final design for the project is expected in December 2016, and a final contract award date is tentatively scheduled for August 2017.[30]
I-64 Express Lanes
State and regional leaders have come up to convert the region's 32 miles (51 km) of existing high occupancy vehicle (HOV-2) lanes into high occupancy toll (HOT-2) lanes called the I-64 Express Lanes. According to a 2016 study by VDOT, only 1,600 vehicles travel through the Norfolk HOV lanes during the morning HOV restriction (6:00–8:00 am) and only 1,300 vehicles through the lanes through Virginia Beach and Chesapeake.[31] The plans for the I-64 Express Lanes have been divided into individual segments, all of which have been endorsed by the regions transportation planning organization.
Segment 1 converted the two-lane reversible roadway in Norfolk between the I-64/I-564 interchange and the I-64/I-264 interchange to HOT-2 lanes. Inner Loop traffic (eastbound from Hampton through Norfolk) enters through the ramp just prior to the I-564 interchange and exits through either the left exit directly to I-264 east, the slip ramp back to the Inner Loop for the interchange to I-264 west, or continue straight into mainline Inner Loop on the other side of the interchange. Outer Loop (westbound from Chesapeake to Norfolk) traffic enters the lanes at the ramp just after the I-64 Twin Bridges at the Elizabeth River, I-264 west traffic (from Virginia Beach to Downtown Norfolk) uses the flyover ramp from mainline I-264 to the Express Lanes, and I-264 east traffic (from Downtown Norfolk to Virginia Beach) merges onto the Outer Loop and utilizes the slip ramp entry. Tolling is only operational from Monday–Friday from 5:00–9:00 am and from 2:00–6:00 pm. Minimum toll during these periods is $0.50 and increases proportionally to traffic. Toll gantry installation and conversion was completed January 10, 2018, slightly behind schedule.[32]
Segment 2 would convert the single HOV-2 diamond lanes in each direction to HOT-2 lanes and would also include the newly expanded High Rise Bridge and associated lanes of I-64 from the I-464/I-64 interchange. Both directions would have a primary entrance/exit near the Bowers Hill interchange, with a midpoint entrance/exit near the Greenbrier Parkway/Battlefield Boulevard interchanges and a terminal entrance/exit that ties in at the Twin Bridges. The current HOV lanes would be reduced from 16 to 12 feet (4.9 to 3.7 m) (allowing the installation of the tubular road markers separating the general purpose lanes from the tolled express lanes), and new 12-foot (3.7 m) lanes would be built extend across the I-64/I-464 interchange and be built into the new High Rise Bridge and all the way to the Bower's Hill interchange. These lanes would be continuously operational once activated and would be variably priced depending on the traffic in the general-purpose lanes. This segment is scheduled to be completed as part of the High Rise Bridge project, which is scheduled for completion in 2021.[31]
Segment 3 would be built as part of the HRBT Expansion Project and would build from the existing reversible HOV northern terminus at I-564/I-64 through, across the expanded bridge–tunnel, and through the existing HOV-2 diamond lanes in Hampton. Planning for this segment (such as operational times and tolling pricing) will continue as the HRBT Expansion Project continues and would open at the same time as the new HRBT opens in 2024.[31]
Segment 4 would convert the remaining diamond lanes on I-64 in Hampton & Newport News to HOT-2 lanes as an extension of the HRBT Expansion Project. Detailed studies for this project, including operational hours, planning, and design, will occur in 2018 and would open along with the completion of the HRBT Expansion Project.
Hampton Roads Bridge–Tunnel Expansion Project
According to VDOT, in 1958, an average of 6,000 vehicles a day used the facility whereas an average of 88,000 vehicles a day were using the crossing in 2008, with volumes exceeding 100,000 during the tourist season, well exceeding the original design capacity of 77,000 vehicles per day, which sparked decades of debate on how to improve traffic flow at the region's most important water crossing. Studies into the growing traffic at the HRBT have roots back to the early 1990s. In 1992, the Virginia General Assembly had requested that VDOT study growing traffic at the HRBT. The conclusion of that study determined that a longterm large-scale solution to the problem would be required to alleviate backups. For the next 14 years, VDOT would undertake numerous studies in 1999, 2008, 2012, and 2016 to help choose a candidate build that was financially and physically feasible to build. On October 29, 2020, a groundbreaking ceremony was held in Hampton for the HRBT Expansion Project.[33]
After nearly two decades of studies and planning, the CTB and the two regional boards responsible for the project (HRTPO/Hampton Roads Transportation Accountability Commission (HRTAC)) voted unanimously in 2016 to a $3.3-billion expansion of the current bridge–tunnel and its approaches from two to four lanes in both directions from the I-664 interchange to the I-564 interchange, with two new, two-lane bridge–tunnels built to carry traffic eastbound (Hampton to Norfolk). A final environmental impact statement (EIS) was published in May 2017, and the Record of Decision (ROD) from the Federal Highway Administration (FHWA) was granted in June. The project is expected to be completed by November 2025 [33]
I-95 exit 75; east end of concurrency with I-95; eastbound exit is for 3rd Street; westbound exit is for 5th Street; eastbound and westbound entrances are from 7th Street; exit numbers follow I-64
No access from westbound I-64 to eastbound Hampton Roads Center Parkway or from westbound Hampton Roads Center Parkway to eastbound I-64; signed as exits 261A (west) and 261B (east) eastbound
263.13
423.47
63
262
SR 134 north (Neil Armstrong Parkway) / Hampton Roads Center Parkway east – NASA, Poquoson
Westbound exit, eastbound entrance; west end of concurrency with SR 134; signed as exit 262B
Consolidated into exit 276 eastbound; exit 276B is a left exit; no access from eastbound I-64 to eastbound US 460; access from westbound I-64 to westbound US 460 via exit 276C
I-264 exit 14; signed as exits 284A (west) and 284B (east); eastbound exit 284A includes a flyover to I-264 east, so exit 284B is signed only for Newtown Road in that direction; east end of directional (east–west) signage; I-64 east is signed as inner loop (clockwise) and I-64 west is signed as outer loop (counterclockwise).
I-464 exit 1; SR 168 exit 15A; no access from outer loop I-64 to southbound US 17; signed as exits 291A (I-464) and 291B (US 17 / SR 168); inner loop end of concurrency with SR 168; outer loop end of concurrency with US 17; signed as exits 291B (SR 168) and 292 (US 17) counterclockwise (outer)
Deadly Premonition 2: A Blessing in Disguise Разработчики Toybox Inc. White Owls Inc. Now Production (англ.) (рус.[1] Издатели Rising Star Games Toybox Inc. (Япония) Часть серии Deadly Premonition[d] Даты выпуска Nintendo Switch 10 июля 2020 Windows 11 июня 2022 Жанр survival horror Создатели Руководитель Хидетака Суэхиро (англ.) (рус. Пр...
У Вікіпедії є статті про інших людей із прізвищем Лемпицький.Станіслав Лемпицькийпол. Stanisław Łempicki Станіслав Лемпицький. Не пізніш, ніж у 1939 році.Ім'я при народженні Stanisław ŁempickiНародився 25 травня 1886(1886-05-25)Кам'янка-БузькаПомер 2 грудня 1947(1947-12-02) (61 рік)Краків·інфаркт міокард...
Sebuah gambar menggambarkan kelahiran Saladin. Ayahnya Najm al-din terlihat menggendongnya (1966) Najmuddin Ayyub (meninggal 9 Agustus 1173) adalah seorang dizdar (pemimpin kastil) di Tikrit, menggantikan ayahnya Shadzi ibnu Marwan yang wafat. Ia merupakan saudara kandung Assaduddin Shirkuh. Perjalanan Shadzi dan dua putranya hingga tiba di Tikrit, Irak, demikian berliku. Berhubung Shadzi adalah seorang pejabat dan politikus, ia memiliki hubungan rumit dengan banyak orang, banyak kepentingan....
Italian lawyer and politician, former vice president of the High Council of the Judiciary Giovanni LegniniVice president of the CSMIn office30 September 2014 – 27 September 2018Preceded byMichele ViettiSucceeded byDavid ErminiMember of the Chamber of DeputiesIn office15 March 2013 – 26 September 2014Member of the SenateIn office26 July 2004 – 15 March 2013Member of the Regional Council of AbruzzoIncumbentAssumed office 23 February 2019 Personal detailsBorn...
1975 studio album by John Entwistle's OxMad DogStudio album by John Entwistle's OxReleasedFebruary 1975Studio Novasound Studios Scorpio Studios (both London) Genre Rock hard rock rock and roll rockabilly country disco Length36:39LabelTrackDeccaProducer John Alcock John Entwistle John Entwistle's Ox chronology Rigor Mortis Sets In(1973) Mad Dog(1975) Too Late the Hero(1981) Mad Dog is the fourth solo studio album by the English rock musician John Entwistle, who was the bassist for the ...
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: IBM 632 – news · newspapers · books · scholar · JSTOR (February 2022) (Learn how and when to remove this template message) IBM 632IBM 632 Electronic Typing CalculatorTypeAccounting machineRelease date1958; 65 years ago (1958)Introductory price...
This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Barmulloch – news · newspapers · books · scholar · JSTOR (December 2009) (Learn how and when to remove this template message) Human settlement in ScotlandBarmullochScottish Gaelic: Barr a' MhullaichQuarrywood Road, and the now-demolished Red Road flatsBarmullochLocation within G...
Streptopetalum Scientific classification Kingdom: Plantae Clade: Tracheophytes Clade: Angiosperms Clade: Eudicots Clade: Rosids Order: Malpighiales Family: Passifloraceae Subfamily: Turneroideae Genus: StreptopetalumHochst. Streptopetalum is a genus of flowering plants belonging to the family Passifloraceae.[1] Its native range is Eritrea to Southern Africa.[1] Species Species:[1] Streptopetalum arenarium Thulin Streptopetalum graminifolium Urb. Streptopetalum hildebra...
مقام السيدة زينب مقام السيدة زينب (دمشق) معلومات أساسيّة الموقع دمشق، سوريا الإحداثيات الجغرافية 33°26′40″N 36°20′27″E / 33.444444°N 36.340833°E / 33.444444; 36.340833 الانتماء الديني الإسلام المنطقة محافظة ريف دمشق البلدية السيدة زينب (ريف دمشق) الوضع الحالي مفتوح للمسلمين الأهم...
1973 studio album by Stan Getz & Bill EvansStan Getz & Bill EvansStudio album by Stan Getz & Bill EvansReleased1973RecordedMay 5, 1964 (#4–6, 9–10)May 6, 1964 (#1–3, 7–8, 11)StudioVan Gelder Studio, Englewood Cliffs, New JerseyGenreJazzLength38:15 (LP); 61:43 (CD reissue)LabelVerveV6-8833ProducerCreed TaylorBill Evans chronology Trio 64(1964) Stan Getz & Bill Evans(1973) The Bill Evans Trio Live(1964) Stan Getz chronology Nobody Else but Me(1964) Stan Getz &...
Association football championship match between Liverpool and Sunderland, held in 1992 For the women's event, see 1992 WFA Cup final. Football match1992 FA Cup finalEvent1991–92 FA Cup Liverpool Sunderland 2 0 Date9 May 1992VenueWembley Stadium, LondonMan of the MatchSteve McManamanRefereePhilip Don (Middlesex)Attendance79,544← 1991 1993 → The 1992 FA Cup final was contested by Liverpool and Sunderland at Wembley. Liverpool won 2–0, with goals from Michael Thomas and Ian Rush....
У этого термина существуют и другие значения, см. Голос России (значения). Голос России Страна Россия Время вещания круглосуточно[1] Дата начала вещания 29 октября 1929 года Дата конца вещания 10 ноября 2014 года Заменён Радио Sputnik Владелец Российская Федерация Сайт radiosput...
Public holiday in North and South Korea Hangeul Day (한글날)Hunmin Jeongeum EonhaeOfficial nameHangeul Day (한글날)Chosŏn'gŭl Day (조선글날)Also calledHangeul Proclamation DayKorean Alphabet DayObserved byNorth Koreans and South KoreansTypeNational, CulturalSignificanceCommemorates the invention of hangeulDateOctober 9 (South Korea)January 15 (North Korea)Frequencyannual Hangeul DaySouth Korean nameHangul한글날Revised RomanizationHangeullalMcCune–ReischauerHan'gŭllal Ch...
Chibchan language spoken in Colombia Ica language redirects here. Not to be confused with the Ika language of Nigeria. ArhuacoIkʉNative toColombiaEthnicity14,800 Arhuacos (2001)[1]Native speakers8,000 (2009)[2]Language familyChibchan Arwako–ChimilaArwako languagesArhuacoLanguage codesISO 639-3arhGlottologarhu1242ELPIcaThis article contains IPA phonetic symbols. Without proper rendering support, you may see question marks, boxes, or other symbols instead of Unicode...
Israeli 155 mm self-propelled howitzer This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: ATMOS 2000 – news · newspapers · books · scholar · JSTOR (March 2009) (Learn how and when to remove this template message) ATMOS An ATMOS system of the Philipine ArmyTypeSelf-propelled howitzerPlace of originIsra...
2003 deadly fire at a rock concert in West Warwick, Rhode Island, USA The Station nightclub fireStation Fire Memorial ParkDateFebruary 20, 2003 (2003-02-20)Time11:07 p.m. (EST)LocationWest Warwick, Rhode Island, U.S.Coordinates41°41′03.6″N 71°30′39.2″W / 41.684333°N 71.510889°W / 41.684333; -71.510889CauseIgnition of acoustic foam by pyrotechnics. Fireworks accident.Deaths100[a]Non-fatal injuries230 The Station nightclub fire occurred...
Republik ZambiaRepublic of Zambia (Inggris)Ichalo ca Zambia (Bemba)Cisi ca Zambia (Tonga)Naha Zambia ye Ipusa (Lozi)Dziko la Zambia (Chichewa)Kyalo kya Zambia (Kaonde) Bendera Lambang Semboyan: One Zambia, One Nation (Inggris: Satu Zambia, Satu Bangsa)Lagu kebangsaan: Stand and Sing of Zambia, Proud and FreeIbu kota(dan kota terbesar)Lusaka15°25′S 28°17′E / 15.417°S 28.283°E / -15.417; 28.283Bahasa resmiInggrisBahasa daerahyang diakui Bemba, Tonga, Lo...
Stadium in Colorado, USA This article is about a football stadium. For other uses, see Folsom Field (disambiguation). Folsom FieldSold out night game with Utah in 2016BoulderLocation in the United StatesShow map of the United StatesBoulderLocation in ColoradoShow map of ColoradoFormer namesColorado Stadium(1924–1944)Address2400 Colorado AvenueLocationUniversity of Colorado Boulder, Colorado, U.S.Coordinates40°00′32″N 105°16′01″W / 40.009°N 105.267°W / 40....