The Hastings line is a secondary railway line in Kent and East Sussex, England, linking Hastings with the main town of Tunbridge Wells, and London via Tonbridge and Sevenoaks. Although primarily carrying passengers, the railway also serves a gypsum mine which is a source of freight traffic. Southeastern Trains operates passenger trains on the line, and it is one of their busiest lines.
The railway was constructed by the South Eastern Railway in the early 1850s across the difficult terrain of the High Weald. Supervision of the building of the line was lax, enabling contractors to skimp on the lining of the tunnels. These deficiencies showed up after the railway had opened. Rectifications led to a restricted loading gauge along the line, requiring the use of dedicated rolling stock.
Served by steam locomotives from opening until the late 1950s, passenger services were then taken over by a fleet of diesel-electric multiple units built to the line's loading gauge. Diesel locomotives handled freight, also built to fit the loading gauge. The diesel-electric multiple units served on the line until 1986, when the line was electrified and the most severely affected tunnels were reduced from double track to single.
The engineer in charge of the construction was Peter W. Barlow and the contractors were Messrs. Hoof & Son.[10] In April 1845 the SER decided that the branch would be double track. A 410-yard-long (370 m) tunnel was required 44 chains (890 m) after leaving Tunbridge. This was named "Somerhill Tunnel" after the nearby mansion. A mile and 54 chains (2.70 km) after leaving Somerhill Tunnel, a 270-yard-long (250 m) viaduct was required. Southborough Viaduct stands 40 feet (12 m) high and has 26 arches. A temporary station was built at Tunbridge Wells as the 823 yd (753 m) Wells Tunnel was still under construction. It was 4 miles 7 chains (4.09 mi; 6.58 km) from Tunbridge. The temporary station subsequently became a goods station.[2] The first train, comprising four locomotives and 26 carriages, arrived at Tunbridge Wells on 19September.[11] Trains from Tunbridge had to reverse before starting the climb to Somerhill Tunnel, as there was no facing junction at Tunbridge. This situation was to remain until 1857,[12] when a direct link was built at a cost of £5,700.[13] The old link remained in use until c. 1913.[14]
The SER was granted permission to build a line from Ashford in Kent to St Leonards, East Sussex in 1845. The LBSC reached St Leonards from Lewes the following year. This gave the LBSC a shorter route to Hastings than the SERs route, then still under construction. The SER sought permission to extend their branch from Tunbridge Wells across the High Weald to reach Hastings.[1] Authorisation for the construction of a 25-mile-60-chain (25.75 mi; 41.44 km) line to Hastings was obtained on 18June 1846,[10]Parliament deemed the line between Ashford and St Leonards to be of military strategic importance. Therefore, they stipulated that this line was to be completed before any extension was built from Tunbridge Wells.[1] The extension into Tunbridge Wells opened on 25November 1846 without any public ceremony.[15] In 1847, the SER unsuccessfully challenged the condition that the line between Ashford and St Leonards be completed first. That line was opened in 1851, passing through Hastings and making an end-on junction with the LBSC line from Lewes.[12]
Construction
The Hastings line is built over the difficult, forested, and hilly terrain across the High Weald and sandstoneHastings Beds, necessitating the construction of eight tunnels between Tonbridge and the south coast seaside resort of Hastings. The SER was anxious to construct the line as economically as possible, since it was in competition with the LBSC to obtain entry into Hastings and was not in a strong financial position in the mid-1840s.[16]
The construction of the line between Tunbridge Wells and Robertsbridge was contracted to Messrs. Hoof & Wyths,[17] subcontracted to Messrs. H. Warden.[10] By March 1851, the trackbed had been constructed as far as Whatlington, East Sussex, a distance of 19 miles (30.58 km). All tunnels had been completed and a single line of railway had been laid for a distance of 10 miles 40 chains (10.50 mi; 16.90 km) from Tunbridge Wells.[18] When the 15-mile-40-chain (15.50 mi; 24.94 km) section from Tunbridge Wells to Robertsbridge opened on 1September, a single line of track extended a further 4 miles (6.44 km) to Whatlington. On the 6-mile (9.66 km) section between Whatlington and St Leonards, 750,000 cubic yards (570,000 m3) out of 827,000 cubic yards (632,000 m3) had been excavated.[19] Construction of the line between Tunbridge Wells and Bopeep Junction cost in excess of £500,000.[20]
Deficiencies in the construction of the tunnels
Supervision of the construction was lax,[21] which enabled the contractors to skimp on the lining of the tunnels. This manifested itself in March 1855 when part of the brickwork of Mountfield Tunnel collapsed. An inspection of Grove Hill, Strawberry Hill and Wells tunnels revealed that they too had been constructed with too few layers of bricks.[22] Grove Hill Tunnel had been built with just a single ring of bricks and no filling above the crown of the brickwork.[23] The SER took the contractors to court and were awarded £3,500 in damages. However, rectifying the situation cost the company £4,700.[10][22] Although the contractors had charged for six rings of bricks, they had only used four. Due to the cost of reboring the tunnels,[21] this had to be rectified by the addition of a further two rings of brickwork, reducing the width of the tunnels by 18 inches (460 mm). The result of this was that the loading gauge on the line was restricted, and special rolling stock had to be built,[12] later becoming known as Restriction 0 rolling stock.[22] This problem would affect the line until 1986.[21]
Wadhurst Tunnel collapsed in 1862 and it was discovered by the SER that the same situation existed there too.[21] Rectification cost £10,231.[24] By 1877, only one train was permitted in Bopeep Tunnel at a time. The tunnel was partly widened in 1934–35.[25] In November 1949, serious defects were discovered in the tunnel. Single-line working was put in place on 19November, but the tunnel had to be closed completely a week later. The tunnel was partially relined with cast iron segments. It reopened to traffic on 5June 1950.[26] Mountfield Tunnel was underpinned in 1938–39, remaining open with single-line working in operation.[23] It partially collapsed on 17November 1974, resulting in single-line working until 31January 1975. The line was then closed until 17March whilst the track was singled through the tunnel.[25]
Openings
The line was opened by the SER in three main stages: Tunbridge–Tunbridge Wells, Tunbridge Wells–Robertsbridge and Robertsbridge–Bopeep Junction. A temporary station was opened at Tunbridge Wells on 19September 1845 while Wells Tunnel was completed. The temporary station later became the goods depot. Tunbridge Wells (later Tunbridge Wells Central) station opened on 25November 1846.[2][12][27] The Tunbridge Wells–Robertsbridge section opened on 1 September 1851, with the Robertsbridge–Battle section opening on 1 January 1852. The Battle–Bopeep Junction section opened on 1 February 1852.[12]
Description of the route
The line climbs steeply out of the Medway Valley at gradients of between 1 in 47[Note 3] and 1 in 300 to a summit south of Tunbridge Wells, the line undulates as far as Wadhurst at gradients between 1 in 80 and 1 in 155 before descending into the Rother Valley, which it follows as far as Robertsbridge at gradients between 1 in 48 and 1 in 485. The line then climbs at gradients between 1 in 86 and 1 in 170 before a dip where it crosses the River Brede. This is followed by a climb to Battle with gradients between 1 in 100 and 1 in 227 before the line falls to Hastings at gradients of between 1 in 100 and 1 in 945.[12][14]
Hastings Tunnel is between St Leonards Warrior Square and Hastings stations.[12]
Stations
The original stations on the Tunbridge Wells to Hastings section of the line are mostly in the Gothic or Italianate styles. These were designed by William Tress.[32] Frant, Wadhurst, Witherenden, Etchingham and Robertsbridge stations opened on 1September 1851.[12] Other station openings are detailed below. Stations are listed under their original names.
Tunbridge
Tunbridge station opened in May 1842. Following the opening of the branch to Tunbridge Wells in 1845, it was renamed to Tunbridge Junction in January 1852, then Tonbridge Junction in 1893, and to its current name in July 1929.[33][34] The original station stood to the east of the road bridge, whereas the current station, opened in 1864, stands to the west.[35] Trains leaving Tonbridge had to reverse to reach Tunbridge Wells. This arrangement lasted until 1857, when a new section of line was constructed enabling trains to reach the Hastings line without reversal.[1] The station is 29 miles 42 chains (29.53 mi; 47.52 km) from Charing Cross via Orpington.[36]
Southborough
Southborough station opened on 1March 1893. It was renamed High Brooms on 21September 1925 to avoid confusion with Southborough station on the Chatham Main Line, which had already been renamed Bickley.[37] The station is 32 miles 70 chains (32.88 mi; 52.91 km) from Charing Cross.[36]
Tunbridge Wells
The first station at Tunbridge Wells was temporary and was situated north of Wells Tunnel. It opened on 19 September 1845 and was replaced by the present Tunbridge Wells Station on 25 November 1846. It subsequently became Tunbridge Wells Goods station, later renamed Tunbridge Wells Central Goods station.[2][37] The goods station closed in 1980, with a siding retained for engineers use.[38] The original station was 44 miles 23 chains (44.29 mi; 71.27 km) from London Bridge via Redhill.[2][36][Note 4]
The building on the up side of the station was built in the Italianate style.[39] A new building by A. H. Blomfield was constructed on the down side in 1911. The station was renamed Tunbridge Wells Central on 9 July 1923 with the ex-LBSC station being renamed Tunbridge Wells West.[40][41] Following the closure of the Tunbridge Wells–Eridge railway on 6 July 1985,[42] the name reverted to Tunbridge Wells. The station is 34 miles 32 chains (34.40 mi; 55.36 km) from Charing Cross.[36]
Frant
Frant station is 36 miles 53 chains (36.66 mi; 59.00 km) from Charing Cross.[36] The station building is on the down side.[43]
Wadhurst
Wadhurst station is 39 miles 23 chains (39.29 mi; 63.23 km) from Charing Cross.[36] The station building is in the Italianate style, with a later one-bay extension. The 1893-built signal box,[43] decommissioned on 20 April 1986,[44] was purchased by the Kent and East Sussex Railway.[45]
Witherenden
Witherenden station is 43 miles 66 chains (43.83 mi; 70.53 km) from Charing Cross.[36] It was renamed Ticehurst Road in December 1851, and Stonegate on 16June 1947.[46]
Etchingham
Etchingham station is 47 miles 34 chains (47.43 mi; 76.32 km) from Charing Cross.[36] The building is on the up side.[47]
Robertsbridge
Robertsbridge station is 49 miles 37 chains (49.46 mi; 79.60 km) from Charing Cross.[36] On 26March 1900, it became a junction with the opening of the Rother Valley Railway to freight. The line opened to passengers on 2April 1900,[48] and was renamed the Kent and East Sussex Railway in 1904. [49] The Kent and East Sussex Railway closed to passengers on 2January 1954 and to freight on 12June 1962,[50] except for a short section serving a mill at Robertsbridge which closed on 1January 1970.[51]
Mountfield Halt
Mountfield Halt opened in 1923. It closed on 6October 1969.[52] The platforms were built of sleepers and were demolished in the early 1970s.[53] The station was 53 miles 37 chains (53.46 mi; 86.04 km) from Charing Cross.[36]
Battle
Battle station opened on 1September 1851.[12] The buildings are in the Gothic style and stand on the up side.[53] The station is 55 miles 46 chains (55.58 mi; 89.44 km) from Charing Cross.[36]
Crowhurst
A siding had existed at Crowhurst from 1877.[54] The station opened on 1June 1902 and was located at the junction for the Bexhill West branch line, which also opened the same day.[55] Despite the line's closure on 14June 1964, Crowhurst station remains open.[56] The station is 57 miles 45 chains (57.56 mi; 92.64 km) from Charing Cross.[36]
West St Leonards
West St Leonards station opened on 1October 1887.[57] The buildings are wood framed and covered with weatherboards.[58] The station is 60 miles 59 chains (60.74 mi; 97.75 km) from Charing Cross.[36]
St Leonards Warrior Square
St Leonards Warrior Square station opened on 13 February 1851[59] along with a new section of line between Hastings and the LBSCs Hastings & St Leonards station. This gave the LBSC better access to Hastings.[10][60] It lies between Bopeep Tunnel and Hastings Tunnel.[61] The station is 61 miles 55 chains (61.69 mi; 99.28 km) from Charing Cross.[36]
Hastings
Hastings station opened on 13 February 1851 along with the SER branch from Ashford.[60] Through platforms were provided for SER services and a separate terminal platform for LBSC services.[62] The station was rebuilt and enlarged by the SER in 1880 as it was then inadequate for the increasing seasonal traffic. In 1930 the station was rebuilt by the Southern Railway. This entailed closure of the engine sheds at Hastings, with locomotives being transferred to St Leonards. The original station building, by Tress, was demolished and a new Neo-Georgian station building by J. R. Scott was erected. The rebuilt station was completed on 5 July 1931.[63] The new layout provided two island platforms.[64] The station was rebuilt in 2003 by Railtrack. The 1931-built building was demolished and a new structure erected in its place.[65] The station is 62 miles 33 chains (62.41 mi; 100.44 km) from Charing Cross via Orpington.[36]
Links to other lines
Built
In the late 1860s, a single track link was built between the SERs Tunbridge Wells station and the LBSCs Tunbridge Wells station, which had opened in 1866. It was 1875 before powers were granted to run a passenger service over this section of line.[66] The junction with the main line was Grove Junction. It was removed on 7July 1985, following closure of the Tunbridge Wells Central–Eridge line the previous day.[42]
In 1903, a railway was authorised to be built from Robertsbridge to Pevensey, East Sussex. The line was authorised under the Light Railways Act 1896,[69] but was not constructed.[70]
Electrification of the Hastings line was first considered by the SER as early as 1903. Lack of finance meant that no decision had been made by the time World War I broke out in 1914.[73] It was stated in 1921 that electrification was a long-term aim. In the mid-1930s, the Southern Railway, which had been formed from the SER, LBSC, London and South Western Railway (LSWR) and London, Chatham and Dover Railway (LCDR) in 1923 under the Railways Act 1921, electrified a number of lines. The East Coastway line was electrified in 1935, with a depot being built at Ore, East Sussex. In 1937, it was proposed to electrify the line between Sevenoaks and St Leonards Warrior Square at a cost of £1,500,000. The scheme was deferred, with another proposal in 1937 costing £1,300,000 also failing to gain favour before World War II broke out. One of the main reasons that electrification was not given the go-ahead was the fact that non-standard rolling stock would be required. The Southern Railway had provided the line with 104 new carriages and six Pullman Cars between 1929 and 1934.[22]Two electric locomotives were ordered in 1937. They were built to the Hastings line loading gauge.[74]
In October 1946, the Southern Railway announced a programme to electrify all lines in Kent and East Sussex in three stages. The Hastings line between Tonbridge and Bopeep Junction was to be part of the third stage.[74] Track would have been slewed within the affected tunnels with only one train normally allowed in the tunnel. In an emergency, two trains would be allowed in the tunnel at the same time, but restricted to 25 miles per hour (40 km/h). Standard 9 feet 0 inches (2.74 m) wide stock would be used.[75] Following the nationalisation of railways in the United Kingdom under the Transport Act 1947, the Southern Region of British Railways shelved new electrification schemes, concentrating on the construction of new steam locomotives.[74] In 1952, the possibility of operating standard rolling stock on the line had been examined. The Operating Department objected to the use of single line sections through the various tunnels. The 1930s stock was refurbished with the aim of extending its service by a further ten years. The first two phases of the Southern Railway's electrification scheme were revived in 1955. This did not include the Hastings line and it was announced in 1956 that a fleet of diesel-electric trains would be constructed to operate the service until the line was electrified. At that time, the rolling stock built in the 1930s was overdue for replacement.[76] The modernisation to the Hastings line and the introduction of the diesel-electric trains cost £797,000, [75] of which £595,000 was the cost of the first seven trains.[77] A further thirteen trains cost £1,178,840.[78]
Electrification was finally carried out in the 1980s, as detailed below.
From the opening of the line, passenger stock consisted of 4-wheel carriages.[90] In 1845, there were eight passenger trains a day from Tunbridge Wells to London, with half that number on Sundays.[91] On 23June 1849, the Royal Train took Queen Victoria and Prince Albert to Tunbridge Wells to visit Queen Adelaide, the Queen Dowager. The train, consisting of the Royal Saloon, two first class carriages and a brake van made the journey from Bricklayers Arms to Tunbridge Wells in 75 minutes. It was driven by James Cudworth, the Locomotive Superintendent of the SER. The return journey took 70 minutes.[92] The Royal Train visited the line again on 18December 1849 conveying Queen Victoria and Princess Alice from Windsor, Berkshire to Tunbridge Wells on a visit to Princess Louise. The journey via Waterloo took 100 minutes. The train was driven by William Jacomb, Resident Engineer of the LSWR, and Edgar Verringer, Superintendent of the LSWR. At Waterloo, driving of the train was taken over by John Shaw, General Manager of the SER and Mr. Cockburn, Superintendent of the SER. The return journey took 105 minutes.[93]
With the opening of the extension to Robertsbridge, there were three trains a day, with two on Sundays. These were augmented by an additional train daily when the extension to Bopeep Junction opened. In 1860, there were seven up trains and six down trains daily; Hastings to London via Redhill taking two hours.[91] From 1861, Cudworth 2-2-2 "Little Mail" class locomotives were introduced.[94] In 1876, the Sub-Wealden Gypsum Co built a 1 mile (1.61 km) long line from a junction south of Mountfield Tunnel to a gypsum mine located in Great Wood, Mountfield.[95] This line was still in operation as of 2007.[96] Bogie carriages entered service on the line in 1880.[90] In 1890, the winter service was eleven trains each way, of which five were fast.[Note 6] An additional two trains daily operated between Tunbridge Wells and Wadhurst. By 1910, this had increased to twenty trains each way, of which twelve were fast, plus the extra two Wadhurst services. Four trains ran on Sundays. The service was reduced during World War I, but Sunday services had increased to seven by 1922.[91]
By the 1930s the line was worked by L and L1 class4-4-0 locomotives. The Schools class 4-4-0s were introduced in 1930;[97] the width of these was 8 feet 4 inches (2.54 m) measured across the cab, and 8 feet 6+1⁄2 inches (2.604 m) measured across the cylinders.[98] The service was again reduced during World War II, with fourteen trains daily in 1942, of which four were fast; there were seven trains on Sundays.[91] As built, it was envisaged that the West Country and Battle of Britain class locomotives would be able to work the line. Forty-eight locomotives of the West Country and 22 of the Battle of Britain class were built with cabs that were 8 feet 6 inches (2.59 m) wide and paired with tenders of the same width. It was subsequently decided not to work these locomotives over the line.[99][100] Locomotives from these two classes that were rebuilt gained a 9-foot-0-inch-wide (2.74 m) cab. Unrebuilt locomotives retained their narrow cab.[101]
By 1948, the service was sixteen trains, of which seven were fast. An additional three trains ran as far as Wadhurst. In 1957, the service was eighteen trains daily, of which nine were fast. There were nine trains on Sundays. The Schools Class locomotives worked the line until 1957 when steam was withdrawn on the Hastings line. Diesel-electric multiple units of what became British Rail Class 201, 202 and 203 (the "Hastings Diesels") took over working the route.[91]
Under British Railways, classes D1, E1, H, N1, M7, Q, Q1, Std 32-6-2T, Std 42-6-0Std 42-6-4T and U1 were permitted to work between Tonbridge and Grove junction. Freight trains from Tonbridge West Yard were not permitted to depart until the line was clear as far as Southborough Viaduct.[102] Other classes of locomotive known to have worked over this section of line include C,[103] and E4.[104]
Diesel-electric era (1957–86)
Special narrow bodied diesel electric multiple units were introduced in 1957–58 to replace steam traction. British Rail Class 201 (6S), 202 (6L) and 203 (6B) (the "Hastings Diesels") took over working the route. These units were constructed of narrow rolling stock. They were delivered in six-car formations (the 6Bs including a buffet car) and two units were often operated in multiple to form twelve-car trains.[91] In latter years some of the units were reduced to five,[105] and later still, to four cars.[106]
The 6S units were intended to be introduced into service in June 1957. On 5April a fire at Cannon Street signal box disabled all signalling equipment there. As a result, locomotive-hauled trains were banned from the station. A temporary signal box was commissioned on 5May and the 6S units were introduced on peak services the next day. Two units coupled together formed the 06:58 and 07:26 Hastings–Cannon Street services in the morning, and the 17:18 and 18:03 Cannon Street–Hastings services in the evening. From 17June the 6S and 6L units were working services throughout the day. The 6B units entered service between May and August 1958.[107]
The Hastings Diesels had almost completely replaced steam by June 1958.[108] With the introduction of the Hastings Diesels, an hourly service was provided. This split at Tunbridge Wells, with the front portion running fast to Crowhurst and the rear portion stopping at all stations. The service ran every two hours on Sundays.[91] The Hastings Diesels also worked services on the Bexhill West branch line until closure on 14June 1964.[56] On 22December 1958, 6L unit 1017 collided with 6B unit 1035 at Tunbridge Wells Central.[109][110]
In 1962, twelve Class 33/2diesel locomotives, were also built with narrow bodies for the Hastings line. These enabled the last steam workings, overnight newspaper trains, to be withdrawn from the Hastings line.[111] Nineteen British Rail Class 207 (3D) diesel electric multiple units were built in 1962.[111] They operated over the Tonbridge–Grove Junction section of the line as part of a Tonbridge–Eastbourne (later Tonbridge–Eridge) service.[112][113] In 1963, Frant, Stonegate, Wadhurst and Mountfield Halt were proposed to be closed under the Beeching Axe.[114] One special working took place on 3April 1966 when one of the ex-Great Western Railwaydiesel railcars, W20W, was worked between Tonbridge and Robertsbridge as an out of gauge load. The railcar had been purchased by the Kent and East Sussex Railway for £415 including delivery to Robertsbridge. After trying to "wriggle out" of the deal, British Rail eventually found a solution. The vehicle was ballasted so that it leant away from the tunnel walls by some 3 inches (80 mm) and was worked to Robertsbridge at a maximum of 20 miles per hour (32 km/h).[115] From 1977, there were two trains an hour, one fast and one slow. In May 1980,[91] the buffet cars were withdrawn from the 6B units, which were recoded as 5L, but retaining the Class 203 designation.[105] The fast trains were withdrawn in January 1981, with trains now stopping at all stations.[91]
Electric era (since 1986)
On 28October 1983, it was announced that the Hastings line was to be electrified. Reasons that decided the issue included a commitment by British Rail to eliminate asbestos from all stock in service by 1988 and the increasing cost of maintaining the then ageing Hastings Diesels. The scheme was to cost £23,925,000. Electrification was finally completed in 1986, the line was electrified using 750 V DC third rail using standard rolling stock, and the expedient of singling the track through the narrow tunnels. The tunnels either side of Tunbridge Wells Central station were not singled because the fact that the south portal of Wells Tunnel and north portal of Grove Hill Tunnel were at the ends of the platforms meant it was impossible to install pointwork without reducing the length of platform available. A speed restriction was imposed through Wells Tunnel. Parliamentary powers were sought in 1979 to bore a second Grove Hill Tunnel, but there was much opposition from local residents. This, and the high cost, caused the proposal to be abandoned. The track in Grove Hill Tunnel was relaid on a concrete base, allowing alignment to be precisely controlled.[116]
The line was declared to conform to the standard C1 loading gauge on 14 March. The first passenger carrying train comprising C1 stock to use the line was a railtour on 15 March hauled by 50 025 Invincible. It was organised by the Southern Electric Group and ran from Paddington to Folkestone Harbour. A preview service of electric trains ran on 27 April 1986 and the full timetabled service commenced on 12 May 1986.[44] The next day, a wrong-side failure occurred involving three signals between Tonbridge and Hastings. Contractors had made errors in the wiring of the signal heads.[117] With the inauguration of electric services, a half-hourly service was operated, with trains departing from Charing Cross at 15 and 45 minutes past the hour. Those departing at xx:15 called at Waterloo East, Sevenoaks, Tonbridge, High Brooms, Tunbridge Wells, Wadhurst, Battle, St Leonards Warrior Square and Hastings, taking 84 minutes. Those departing at xx:45 called at Waterloo East, London Bridge, Orpington, Sevenoaks, Hildenborough, Tonbridge and then all stations to Hastings, taking 99 minutes.[118] The Royal Train visited the line on 6 May, conveying Queen Elizabeth the Queen Mother. It was stabled at Wadhurst whilst she ate lunch. The train was hauled by a Class 73diesel-electric locomotive.[119] Upon electrification, services were operated by 4CEP,[31]4CIG and 4VEPelectric multiple units.[120]
Train services on the line are provided by SE Trains, and are mostly operated by Class 375 Electrostar,[122] or occasionally Class 465/466 Networker units.[123] The line still sees a freight service to and from British Gypsum's sidings at Mountfield.[96] The line retains all its original intermediate station buildings, and is considered a well-preserved example of a Victorian secondary rail route.[124]
Accidents and incidents
A number of accidents have occurred on the Hastings line, none of which have involved the death of a passenger.
On 4October 1852, a passenger train was derailed between Ticehurst Road and Etchingham when the formation was flooded and washed away. Both engine crew members were injured.[125]
On 21June 1856, a passenger train derailed between Tunbridge Wells and Tunbridge Junction, killing the driver and injuring the fireman and a passenger.[126]
On 25October 1859, almost 250 yards (230 m) of track was washed away between St Leonards and Bexhill, affecting the Hastings line.[127]
On 23 June 1861, a collision between SER and LBSC passenger trains occurred at Bo Peep Junction, injuring around ten people. The SER train overran signals due to excessive speed, insufficient brakes, low rail adhesion or a combination of these factors.[128]
On 30 September 1866, the slip portion of a train, which was to be worked forwards to Hastings, failed to stop at Tunbridge due to an error by the slip guard. It crashed into a rake of empty carriages 262 yards (240 m) east of the station. Eleven of the 40 passengers were injured.[129]
On 22February 1892, a SER locomotive was run into by a LBSC passenger train at Hastings. The passenger train had overrun a danger signal. Both locomotives were damaged.[130]
On 29 April 1912, SECR F1 class locomotive No. 216 was working an empty stock train when it suffered the failure of the firebox crown near Tunbridge Wells due to a lack of water in the boiler. Both engine crew were severely injured by escaping steam and jumping from the moving locomotive.[132]
On 6January 1930, the rear carriages of a passenger train from Hastings to London were partially buried by a landslip near Wadhurst tunnel. The train was divided and the front part continued on to Tunbridge Wells, where it arrived 100 minutes late.[133]
On 23December 1958, 6L unit 1017 collided with 6B unit 1035 at Tunbridge Wells Central. Eighteen people were injured, with three of them admitted to hospital.[109][110]
On 8 November 2010, a passenger train operated by Class 375 unit 375 711 failed to stop at Stonegate station due to maintenance errors in respect of the train's sanding apparatus. The train overran the station by 2 miles 36 chains (2.45 mi; 3.94 km). Following the incident, Southeastern reduced the interval that the sand hoppers were to be refilled from seven days to five days.[134] The company was fined £65,000 and ordered to pay £22,589 in costs.[135]
On 23 December 2013, a landslip at Wadhurst was the first in a series of landslips up to February 2014 which led the line between Wadhurst and St. Leonards Warrior Square being closed and reopened three times, with speed restrictions in place following repairs. The train service was replaced by buses during closures.[136][137][138][139][140]Southeastern was criticised by Hastings and Rye MPAmber Rudd over poor customer service during this period.[141] By 12 March, the section between Wadhurst and Robertsbridge had reopened,[142] with full service being restored on 31 March.[143]
Notes
^ Information for this route-map of the Hastings line was compiled from various sources.[144][145][146]
^ The modern spelling of "Tonbridge" was not adopted as the official spelling until 1870.[147]
^ A gradient of 1 in 47 means that the line climbs (or descends) by 1 foot in 47 feet, or 1 metre in 47 metres horizontal distance.
^ This was the route of the line during the time that Tunbridge Wells Central Goods served as a passenger station. The line between Tunbridge and Orpington did not open until 1May 1868.[148]
^Courtney, Geoff. "RVR goes main line in 4½ million rebuilding project". Heritage Railway (201). Horncastle: Mortons Media Ltd: 20. ISSN1466-3562.
^"Light Railways Act, 1896". The Times. No. 37287. London. 11 January 1904. col F, p. 14.
^Rose, Neil (Winter 1974). "The Robertsbridge & Pevensey Light Railway". The Tenterden Terrier (5). Tenterden: The Tenterden Railway Company Limited: 14–15.
^"Railway Intelligence". The Times. No. 22517. London. 5 November 1856. col E, p. 5.
^"Railway Extension in Sussex". The Times. No. 30641. London. 18 October 1882. col D, p. 4.
^"Visit of Her Majesty and His Royal Highness Prince Albert to the Queen Dowager, at Tunbridge Wells". The Morning Chronicle. No. 24859. London. 25 June 1849.
^"Visit of the Queen to Dorden near Tunbridge Wells". The Morning Post. No. 32597. London. 19 December 1876.
^Glasspool, David. "Wadhurst". Kent Rail. Retrieved 26 June 2022.
^"Accident on the South-Eastern Railway". The Times. No. 21240. London. 7 October 1852. col C, p. 9.
^"Fatal Railway Accident". The Times. No. 22401. London. 23 June 1856. col B, p. 7.
^"Destructive Storm. Loss of the Royal Charter with 459 lives". The Bury and Norwich Post, and Suffolk Herald. No. 4036. Bury St. Edmunds. 1 November 1859.
Jowett, Alan (March 1989). Jowett's Railway Atlas of Great Britain and Ireland: From Pre-Grouping to the Present Day (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN978-1-85260-086-0. OCLC22311137.
Judge, C. W. (1986). The History of the Great Western A.E.C. Diesel Railcars. Poole: The Oxford Publishing Co. ISBN0-86093-139-0. OCLC16684245.
Kidner, R. W. (1977) [1963]. The South Eastern and Chatham Railway. Tarrant Hinton: The Oakwood Press. OCLC58849403.
Kidner, R. W. (1985). Southern Railway Halts. Survey and Gazetteer. Headington, Oxford: The Oakwood Press. ISBN0-85361-321-4. OCLC15514757.
Mitchell, Vic; Smith, Keith (1986a). South Coast Railways - Eastbourne to Hastings. Midhurst, West Sussex: Middleton Press. ISBN0-906520-27-4. OCLC4458766130.
Mitchell, Vic; Smith, Keith (1987). Tonbridge to Hastings. Easebourne: Middleton Press. ISBN0-906520-44-4.
Moody, G. T. (1979) [1957]. Southern Electric 1909–1979 (Fifth ed.). Shepperton: Ian Allan Ltd. ISBN0-7110-0924-4.
الصفحه دى يتيمه, حاول تضيفلها مقالات متعلقه لينكات فى صفحات تانيه متعلقه بيها. جورج بوون معلومات شخصيه الميلاد 1 مارس 1871 لويفيل تاريخ الوفاة 24 سبتمبر 1910 (39 سنة) مركز اللعب رامى الكوره الجنسيه الحياة العمليه المهنه لاعب بيسبول[1] الرياضه بيسبول تعديل...
Frau Warrens Beruf (Original Mrs. Warren's Profession) ist ein Drama von George Bernard Shaw von 1893. Es wurde 1905 uraufgeführt. Inhaltsverzeichnis 1 Inhalt 2 Werkgeschichte 3 Theateraufführungen 4 Bearbeitungen 4.1 Filme 4.2 Hörspiele 5 Textfassungen 6 Literatur 7 Weblinks 8 Einzelnachweise Inhalt Die ausgebildete junge Mathematikerin Vivie Warren kommt nach längerer Zeit wieder einmal zu ihrer Mutter zu Besuch. Es erscheinen mehrere Herren, darunter Geschäftsfreunde der Mutter, die s...
André Santos Cabral Henriques (Lisboa, 08 de Setembro de 1979) é um DJ, radialista e empresário português. Nasceu em Lisboa mas aos cinco anos mudou-se para o Cartaxo, onde tem raízes e viveu dois anos. Voltou para a capital, embora muitos fins-de-semana corresse para o Ribatejo. Aos onze anos passa para a linha e é entre Caxias e Paço D’Arcos que faz o liceu e anda de bicicleta entre as praias e piscinas municipais. O pai, disc jockey de profissão, oferece-lhe a primeira mesa de mi...
غراتشيوفكا تقسيم إداري البلد روسيا تعديل مصدري - تعديل يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (مارس 2016) غراتشيوفكا (بالروسية: Грачёвка) هي مدينة ف...
1950s Marathi radio programme Geet RamayanGeet Ramayan Book Cover. The book compiles narration and lyrics of all the songs from the radio program.GenreIndian musicRunning time15 minutesCountry of originIndiaLanguage(s)MarathiHome stationAll India Radio, PuneCreated byG. D. Madgulkar (Author) , Sudhir Phadke (Music) Written byG. D. MadgulkarExecutive producer(s)Sitakant LadNarrated bySudhir PhadkeRecording studioPuneOriginal release1 April 1955 (1955-04-01) –19 April 1956 (195...
Bioegion in Australia Channel CountryAustraliaThe interim Australian bioregions,with Channel Country in redArea304,094.37 km2 (117,411.5 sq mi) Localities around Channel Country: Tanami Mitchell Grass Downs Mitchell Grass Downs Simpson Strzelecki Dunefields Channel Country Mulga Lands Simpson Strzelecki Dunefields Broken Hill Complex Mulga Lands Overhead Channel Country / Cooper Creek Bulloo River crossing, 1955 The Channel Country is a region of outback Australia mostly in the...
Scientific director of the Eindhoven Institute for the Protection of Systems and Information Tanja Lange at 30C3, 2013 Tanja Lange is a German cryptographer and number theorist at the Eindhoven University of Technology. She is known for her research on post-quantum cryptography.[1][2] Education and career Lange earned a diploma in mathematics in 1998 from the Technical University of Braunschweig.[3] She completed her Ph.D. in 2001 at the Universität Duisburg-Essen. He...
KC Antilopen Algemeen Sport Korfbal Geschiedenis Opgericht 20 september 1965 Structuur Voorzitter Michel Lerou Trainer Irene Veenendaal Competities Zaalcompetitie Overgangsklasse Infrastructuur Clubhuis Buiningpark Sporthal Sportcentrum Buiningpark Tenue Portaal Sport KC Antilopen is een korfbalvereniging uit de Nederlandse gemeente Leusden, spelend in de 1ste Klasse landelijk in de zaalcompetitie. Op het veld spelen de Leusdenaren een klasse hoger in de overgangsklasse. KC Antil...
2018 television series Season of television series Inazuma Eleven: AresKey visualCountry of originJapanNo. of episodes26ReleaseOriginal networkTXN (TV Tokyo, TV Osaka)Original releaseApril 6 (2018-04-06) –September 28, 2018 (2018-09-28)Season chronology← PreviousGO: Galaxy Next →Orion no Kokuin Inazuma Eleven: Ares[1] (イナズマイレブン アレスの天秤, Inazuma Irebun Aresu no Tenbin, lit. Inazuma Eleven: Scale of Ares) is a 2018 Japanese telev...
Pesta Olahraga Asia Tenggara ke-18Tuan rumahChiangmai ThailandJumlah negara10Jumlah disiplin--- 28 cabang olahragaUpacara pembukaan9 Desember 1995Upacara penutupan17 Desember 1995Dibuka olehVajiralongkornPutra Mahkota ThailandLokasi seremonial700th Anniversary Stadium← Singapura 1993 Jakarta 1997 → Pesta Olahraga Asia Tenggara ke-18 (dalam bahasa Inggris: 18th SEA Games) diadakan di Chiang Mai, Thailand pada tahun 1995. Ini adalah pertama kalinya bahwa sebuah kota non-ibu kot...
R&B recording artist discography Giveon discographyStudio albums1EPs2Singles9 The discography of American singer-songwriter Giveon consists of one studio album, one compilation album, two extended plays, and nine singles (including one as a featured artist). On March 27, 2020, Giveon released his debut extended play, Take Time. The EP reached number 35 on the Billboard 200. It produced the top-20 single, Heartbreak Anniversary, which reached number 16 on the Billboard Hot 100. That same y...
Sulawesi Tenggara pada Pekan Olahraga Nasional 2021 Jumlah atlet 87 di 16 cabang olahraga Pembawa bendera TBD Total medali Emas2 Perak1 Perunggu0 (Urutan ke- ) Sulawesi Tenggara akan berkompetisi pada Pekan Olahraga Nasional 2021 di Jayapura, Papua. Sebenarnya kontingen ini dijadwalkan untuk bertanding pada 20 Oktober sampai 2 November 2020 namun ditunda ke tanggal 2 sampai 15 Oktober 2021 karena Pandemi COVID-19.[1] Jumlah atlet Cabang olahraga Putra Putri Total Atletik 0...
Municipality in Flemish Community, BelgiumHerenthoutMunicipality FlagCoat of armsLocation of Herenthout HerenthoutLocation in Belgium Location of Herenthout in the province of Antwerp Coordinates: 51°09′N 04°46′E / 51.150°N 4.767°E / 51.150; 4.767Country BelgiumCommunityFlemish CommunityRegionFlemish RegionProvinceAntwerpArrondissementTurnhoutGovernment • MayorStijn Raeymaekers (Eenheid-N-VA) • Governing party/iesEenheid-N-VA, ...
Greyhound de MexicoParentGreyhound LinesFounded1958HeadquartersMexico CityService areaMexicoUnited StatesWebsiteOfficial Website Greyhound de México, S.A. de C.V. is a Mexican non-carrier subsidiary of Dallas, Texas, based Greyhound Lines, providing marketing services in Spanish for other subsidiary companies with cross-border bus routes. Greyhound Lines has two subsidiaries operating in Mexico, each of which provide service to destinations in northern Mexico: Greyhound Lines México, S. de ...
Miquel de Renzi Miguel de Renzi en octubre de 2014Información personalNacimiento 1941 Barcelona (España) Nacionalidad EspañolaEducaciónEducado en Universidad de Barcelona (Doc.; hasta 1971) Supervisor doctoral Miguel Crusafont Pairó Información profesionalOcupación Paleontólogo, escritor, poeta, pintor y geólogo Área Biología evolutiva del desarrollo, morfología y paleobiología Empleador Universidad de Valencia (1977-2011) Estudiantes doctorales Enrique Peñalver Mollá...
1995 American filmFist of the North StarDirected byTony RandelScreenplay byPeter AtkinsTony RandelBased onFist of the North Starby BuronsonTetsuo HaraProduced byMark YellenAkihiro KomineStarringGary DanielsCostas MandylorChris PennIsako WashioMelvin Van PeeblesDowntown Julie BrownLeon Vader WhiteMalcolm McDowellCinematographyJacques HaitkinEdited bySonny BaskinMusic byChristopher L. StoneDistributed byOverseas FilmgroupRelease datesApril 21, 1995 (Japan)February 2, 1996 (US)Running time103 mi...
Pour les articles homonymes, voir Campagne de Pologne. Ce qui suit est l'ordre de bataille des armées polonaise et allemande la veille de l'invasion de la campagne de Pologne. Situation des troupes terrestres Polonaises et Allemandes au 31 août 1939. Rouge = Allemagne. Bleu = Pologne. Les flèches représentent le plan d'invasion allemand et non pas les opérations durant la guerre. Armée polonaise Au 1er septembre 1939, l'ordre de bataille de l'armée polonaise était le suivant : 26...
Ethnic group native to southeastern China and Taiwan Hakka redirects here. For other uses, see Hakka (disambiguation). Not to be confused with Hakha. Hakka客家 · Hak-kâ客家漢族[1]Hakka dancers performing traditional Qilin dance in MalaysiaTotal populationc. 80 million[2]Regions with significant populationsPrimarily China (Guangdong, Fujian, Jiangxi, Guangxi, Sichuan, Hunan, Zhejiang, Hainan, Guizhou, Hong Kong S.A.R., Macau S.A.R.), Taiwan, Southeast Asia,...
Provincial park in Ontario Queen Elizabeth II Wildlands Provincial ParkIUCN category II (national park)Bottom of Victoria FallsLocationOntario, CanadaNearest cityMinden, OntarioCoordinates44°50′0″N 78°56′0″W / 44.83333°N 78.93333°W / 44.83333; -78.93333Area335 km2 (129 sq mi)EstablishedMay 2002Governing bodyOntario Parks The Queen Elizabeth II Wildlands Provincial Park is a provincial park in south-central Ontario, Canada, between G...