The Thameslink Programme was a major £5.5billion scheme to increase capacity on the central London section by accommodating more frequent and longer trains, and providing additional routes and destinations. The new services began operating in 2018. In 2016, new Class 700 trains started operating on the route and replaced the Class 319, Class 377 and Class 387 trains which were withdrawn and transferred elsewhere.
Trains operating the "main line" service (Bedford and Cambridge to Brighton, Peterborough to Horsham) include first-class accommodation; those operating from Luton, St Albans and Kentish Town to Sutton, Sevenoaks and Orpington are usually standard class only. When Govia operated the original Thameslink franchise these services were designated "Thameslink CityFlier" and "Thameslink CityMetro" respectively, but First Capital Connect dropped this branding. Govia Thameslink Railway now refers to these services as Route TL1 (formerly Route 6) and Route TL2/TL3 (formerly Route 7/8) respectively.
Services
Off-peak
The Monday–Friday off-peak service pattern, with frequencies in trains per hour (tph), includes:
Services then continue to/from St Albans City via Wimbledon (see above)
Peak hours
During peak hours, the two trains per hour London Blackfriars to Sevenoaks service (from the table above) is extended through the 'core tunnel' to/from Welwyn Garden City (though a few services originate at Finsbury Park), with extra calls at City Thameslink, Farringdon, St Pancras International, Finsbury Park, New Southgate, Oakleigh Park, New Barnet, Potters Bar and Hatfield.[7][10]
As well as these services, during peak hours, several trains in each direction (approximately two trains per hour) run to/from Orpington (originating/terminating at either London Blackfriars, Luton, West Hampstead Thameslink or Kentish Town), all calling at Petts Wood in lieu of stations from St Mary Cray to Bat & Ball.[7]
Passenger services operated across London through the Snow Hill Tunnel from mid-Victorian times until World War I, when services terminated at Moorgate from the Midland line to the north, and at Holborn Viaduct from the south, at a time when most inner cross-London traffic had been lost to buses and trams. There were low-level platforms under the main part of Holborn Viaduct station known as the Snow Hill platforms: these can still be seen when leaving City Thameslink station travelling northwards.
On 14 June 1941, railway manager George Dow proposed in an article in the London evening newspaper The Star that new routes be built in tunnels from Marylebone south to Victoria, and from King's Cross south to Charing Cross. Both were to connect with a Paddington–Liverpool Street tunnel that he proposed, anticipating Crossrail by 40years. He also proposed a north-east to south-west such link (Liverpool Street to Charing Cross), all giving seamless, key, main-line connections.[12]
The Snow Hill Tunnel route remained open for cross-London freight trains until 1970, when the short section between Farringdon and Holborn Viaduct was closed.
The Snow Hill tunnel was re-opened by British Rail to passenger trains after 72years, with Thameslink beginning in May 1988.[13] On 29 January 1990, the section between Blackfriars and Farringdon was temporarily closed to permit the construction of a new alignment. The route through the site of the long-closed Ludgate Hill station, over Ludgate Hill to Holborn Viaduct was abandoned and demolished. The replacement route under Ludgate Hill was opened on 29 May 1990 by the Network SouthEast (sector of British Rail) concurrently with City Thameslink station, which was initially called St Paul's Thameslink but was renamed in 1991 to avoid confusion with St. Paul's station on the Underground (Central line), about 500 m (550 yd) away.
In the south the services divide: many main-line trains run almost due south through London Bridge to East Croydon and many continue to Brighton, but the other route/branch has evolved, as follows:
From 1988 to 1991 such trains went variously
via Bromley: to Orpington or to Sevenoaks, (both since resumed) or;
via Herne Hill and East Croydon to Purley (off peak only).
From 1994 to 1995 such trains terminated at West Croydon (cutting franchise zone-crossing due to rail privatisation).
From the latter year such trains have run "to/from" a nominal furthest point of a true circular loop, Sutton, the Sutton loop calling at stations including Mitcham Junction, Streatham and Wimbledon.
From 2018 the service was greatly recast and expanded following the completion of the Thameslink programme:
A regular service to Rainham has been added.
A regular service to Horsham has been added.
In the north the present termini of the trains are Luton, Bedford, Cambridge, Peterborough, St Albans and in peak hours, Welwyn Garden City.
By late 1998, more than 28,000 passengers were carried at morning peak times.[14]
From 1 April 2006, the franchise was taken over by First Capital Connect along with some services that had been WAGN's.[15] The branding of most trains, stations, and signs was changed to match the name of the new company, but City Thameslink and West Hampstead Thameslink were not renamed as Thameslink referred to the route.[b] After criticism of the loss of the apt name for this group of routes,[16] First Capital Connect's publicity began calling this set of services its "Thameslink route" to distinguish it from the former WAGN services.
Given the network's success, realised plans arose to upgrade the network to cope with persistent peak-time overcrowding.[18] Network Rail obtained planning permission and legal powers in 2006,[19] funding was secured in July 2007[20] and construction began in October 2007.[21] Plans included rebuilding the station buildings at Farringdon (in conjunction with the Crossrail project) and West Hampstead Thameslink, total rebuild of London Bridge and Blackfriars stations, two new underground platforms at St Pancras International, a new tunnel north of St Pancras International to the East Coast Main Line to allow through services to Peterborough and Cambridge, and platform lengthening. A new 8- and 12-carriage fleet of Class 700 trains began in 2016. The new services on to the Great Northern route began initially on 8 March 2018,[22] with the full timetable being introduced in May 2018.
The London and South East Route Utilisation Strategy published in July 2011 laid out a provisional 24tph timetable. South of London it would provide four trains to Brighton (one semi-fast, one stopping) and two each to Three Bridges, Horsham, East Grinstead, Caterham, Tattenham Corner, Tunbridge Wells, Ashford International, Maidstone East, Sevenoaks and Bellingham. North of London there would be eight semi-fast trains to Bedford, four stopping trains to St Albans, two stopping and two semi-fast trains to Luton, two semi-fast trains to Peterborough, two semi-fast trains to Cambridge and four stopping trains to Welwyn Garden City.[23]
Below is a provisional timetable solely for services running through the 'Thameslink core' tunnel. This 'provisional timetable' was proposed before the upgrade and has not yet been achieved. See Services section above for the current service pattern.
All rolling stock used on Thameslink is electrically powered dual-voltage units using 25 kV AC overhead power north of Farringdon and 750VDC third rail to the south.[1]
Current fleet
Class 700
Class 700 trains were delivered between 2015 and 2018, providing an additional 14,500 seats.[clarification needed][24]Siemens Mobility was named preferred bidder on 16 June 2011, with the Desiro City train family.[25] The contract was signed in June 2013[26] for 1,140 carriages, with 55 twelve-car and 60 eight-car trains. The depots are at Hornsey and Three Bridges.[25] The Three Bridges depot opened in October 2015 and the first trains entered service in spring 2016. All units are now in service, having replaced the Class 319 and Class 387 fleets.
Rolling stock used on Thameslink included the 86 Class 319 trains built between 1987–1988 and 1990. These are electrically powered dual-voltage four-car units rated to carry 289, 308 or 319 passengers. Four Class 319 trains had been transferred from Southern in December 2008 and the last four followed in March 2009, from which point they were all on Thameslink. The last was withdrawn in August 2017.[27]
Class 377
First Capital Connect acquired 23 four-coach Class 377 sets during 2009 on sublease from Southern, for the Thameslink route for additional capacity and to allow some of the Class 319 trains to be released for the Catford Loop service to Sevenoaks, now jointly operated with Southeastern under Key Output 0 of the Thameslink Programme.[28]
Class 317
Class 317 units built in the early 1980s were still in use when services into Moorgate ceased in March 2009: the last timetabled service ran from Farringdon to Bedford on 9 October 2009.
Class 387
Due to delays in the new Class 700 fleet, the DfT and Southern ordered 116 electric dual-voltage 110-mile-per-hour (180 km/h) carriages (29 trains) with the option for another 140 carriages (35 trains).[29][30] The tender for the new Class 387 trains was won by Bombardier and the first set entered service in December 2014, with all in service by May 2015. By 2018, all units were replaced by the new Class 700 fleet with the Class 387 fleet moving over to the Great Northern brand.[31][full citation needed]
Due to problems with the InterCity West Coast tendering process, the process was delayed, with the new franchise delayed until September 2014. The new franchise includes the South Central franchise currently operated by Southern and certain routes from the Integrated Kent Franchise currently operated by Southeastern.[33]
On 23 May 2014, it was announced that the franchise has been awarded to Govia Thameslink Railway.[34] The new Thameslink Southern & Great Northern franchise[17] will include both the Thameslink Great Northern and South Central franchises.
^This service was colloquially known as the Bedpan Line from the contracted names of the terminal stations, as had happened with the Bakerloo line. In general limited-stop trains served St Pancras, and all-stations trains Moorgate.
^"Thameslink gets 14,500 more seats". BBC News. 9 April 2008. Retrieved 1 June 2008. The deal, announced by Transport Secretary Ruth Kelly, will mean the current 720-carriage Thameslink fleet increasing by 380 carriages. A contract for the new carriages is expected to be awarded in summer 2009, with the first train in service by 2012.