You can help expand this article with text translated from the corresponding article in Korean. (September 2022) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Korean Wikipedia article at [[:ko:장항선]]; see its history for attribution.
You may also add the template {{Translated|ko|장항선}} to the talk page.
The original Janghang Line was opened along its full length running between Cheonan and Janghang by the Chosen Gyeongnam Railway on June 1, 1922.[1]
Upgrade
The entire Janghang Line is being electrified, double-tracked, and upgraded for higher speeds with a straighter alignment. Work started in 1997 from Cheonan.[2] By the end of 2008, the new alignment was in service from Cheonan via Asan and Hongseong to Sinseong, from Jupo to Nampo, and from Ganchi to Janghang,[3] and electrification was put in service on the first 19.4 km (12.1 mi) between Cheonan and Sinchang, after Asan, on December 15, 2008.[4] The 17.1 km (10.6 mi) section near Janghang, opened in December 2007, also linked up the Janghang Line with the previously isolated Iksan-Gunsan line via a new bridge over the Geum River, with alignment built for two tracks but initially only one track was laid.[2] In 2010, the remaining sections were slated to be completed by 2018, but complete double-tracking and electrification was no longer planned on the short term due to expected low demand.[3] The realigned 14.2 km (8.8 mi) Nampo-Ganchi section, including the relocated Ungcheon station, was opened on January 5, 2021.[5] As of April 2023, the double-tracking of the Sinchang-Hongseong section was 85% completed and expected to be opened in the second half of 2024.[6] Also as of April 2023, the double-tracking of the Hongseong-Daeya section, including the 18.8 km (11.7 mi) Sinseong-Jupo realignment that was scheduled to begin construction in 2023, was in advanced planning, with a 2027 completion targeted.[6]
The Janghang Line will link up with the Seohae Line at Hongseong station. The Seohae Line will connect Hongseong to Hwaseong in Gyeonggi-do when it opens in the second half of 2024.[6] It will be connected to southern extension of the Sosa–Wonsi Line and Sinansan Line. Seohae Line will serve 250 km/h (155 mph) speed, which will dramatically reduce travel time between Seoul and Hongseong.
Sinchang-Hongseong section will be double track electrifed when Seohae Line open.[7]
Services
Seoul Metropolitan Subway
Seoul Subway's Line 1 services run on the line between Cheonan–Sinchang stations.