The Allington Quarry Waste Management Facility is an integrated waste management centre in Allington, Kent. It is the site of the Allington Energy from Waste (EfW) Incinerator. The incinerator is owned by FCC Environment as Kent Enviropower. The facility, which has involved an investment of over £150 Million, is able to process 500,000 tonnes per annum of waste and has the ability to produce 40MW of power. The facility takes non-hazardous waste from households and businesses in Kent and the surrounding area for recycling and energy recovery. Materials separated by householders are sorted and sent for recycling, with the remainder being used to generate electricity to power the facility and for the local supply network.
Built in a former ragstone quarry, the site includes one 80 metres (260 ft) high chimney, and covers an area of 84 acres (34 ha), of which 67 acres (27 ha) will eventually become parkland, and permanently employs around 100 people.[1]
Allington Richard Allington Allington, Lincolnshire Bill Allington Allington, Salisbury Allington, North Wiltshire East Allington Martin Conway, 1st Baron Conway of Allington St John the Baptist's Church, Allington Allington Quarry Waste Management Facility Allington, Kent Edward Allington Allington, Hampshire Allington Pippin Allington, Dorset HMS Allington Castle Allington Quarry Allington Castle Appleby at Allington The Small House at Allington William Alington All Cannings Mabel Allington Royds Poacher Line