Teesside EfW

Teesside Energy-from-Waste plant
Teesside EfW plant
Viewed from the east in June 2009
Map
CountryEngland
LocationBillingham
Coordinates54°35′45″N 1°15′30″W / 54.59583°N 1.25833°W / 54.59583; -1.25833
StatusOperational
Commission dateMay 1998
OperatorsSITA UK
(1998–present)
Thermal power station
Primary fuelMunicipal waste
Secondary fuelNon-hazardous and commercial waste
Power generation
Units operationalOne 19.2 MW Ansaldo
One 10 MW Von Roll
Nameplate capacity29.2 MW
External links
WebsiteSITA UK
CommonsRelated media on Commons

Teesside Energy from Waste plant (also known as Teesside WTE power station or Haverton Hill incinerator) is a municipal waste incinerator and waste-to-energy power station, which provides 29.2 megawatts (MW) of electricity for the National Grid by burning 390,000 tonnes of household and commercial waste a year. It is located on the River Tees at Haverton Hill, east of Billingham in North East England. Developed and built by NEM, a subsidiary of Northumbrian Water, the initial plant replaced the Portrack Incinerator and opened in 1998. Subsequently, the facility became part of SITA, now Suez.

The station is one of the most modern incinerators operating in England; it is noted for its innovative operation. In 2009, an extension was completed at the station, with the construction of an extra furnace line and a rail head. This increased the capacities of the plant from 19.2 MW and 250,000 tonnes of waste per year to its current levels. The plant initially received waste from Teesside and North Tyneside, but this was extended to include Northumberland with the 2009 extension.

A second plant, the North East Energy Recovery Centre (NEERC), has been built on land adjacent to the first plant. This extends the site's catchment to include waste from south Tyne and Wear.

History

Replacement for Portrack

Between 1975 and 1996, the Portrack Incinerator on the River Tees burned 200,000 tonnes of Teesside's waste every year. In November 1996, the plant was closed down because its design meant it could not achieve the new emission regulations that were to be introduced; it was then demolished in stages between 1998 and 2000.[1] Following the closure of the Portrack plant, a new facility to burn Teesside's refuse was constructed. Teesside Energy from Waste plant was opened in May 1998 as a collaboration with the local authorities of Stockton-on-Tees, Middlesbrough, Hartlepool and Redcar & Cleveland.[2]

Third incineration line

In December 2006, SITA UK signed a 28-year private finance initiative contract worth £70 million with Northumberland County Council, to provide it with waste management services and to reduce the county's reliance upon landfill.[3][4] This included the construction of an extra incineration line at the Teesside plant. Civil construction of the extension began in April 2007, with heavy erection beginning that November. Von Roll was the general contractor for the entire extension.[5] In May 2009, the third line, was brought into operation.[4][6] It was officially opened on 8 October 2009 by former MP Hilary Armstrong, SITA UK Chief Executive David Palmer-Jones, and Northumberland County Councillor Jeff Reid.[7] At various times, between 60 and 100 people were employed in building the third line, and an additional 20 full-time jobs were created for its operation once open. Built on time and within budget, the extension surpassed expectations in its first year of operation.[4][7] A year after the opening of the third line, only a fifth of the amount of waste that was being sent to landfill in Northumberland prior to its opening was still being sent there.[4]

Design and specification

The plant is a large metal-clad building. The metal is finished in the colour 'Goosewing Grey', accented in 'Solent Blue' and 'Poppy Red'. The plant's clean, clear lines and colours are said to "contrast favourably" with the nearby industrial buildings.[8]

Until 2009, the station had two operating furnace lines, which together were capable of burning a total of 250,000 tonnes of waste per year, and generated 20 MW of electricity. However, in May 2009 a third line was brought into operation. The plant currently burns 360,000 tonnes of waste a year and generates 29.2 MW of electricity. This is enough electricity to power 60,000 homes.[2][8]

The original plant uses Babcock & Wilcox Volund boilers to provide steam for a single Ansaldo turbo generator rated at 19.2 MW.[9] The third line uses a Von Roll Inova reciprocating grate to burn the waste, and generates electricity using a single Von Roll Inova three-pass steam generator, rated at 10 MW.[5]

Operations

The station operates constantly, burning municipal household waste from the local councils of Stockton-on-Tees, Hartlepool, Middlesbrough, Redcar & Cleveland, North Tyneside and Northumberland.[2][10] When there is a shortfall in household waste, non-hazardous industrial and commercial waste is used to make up capacity.[2][8] The station burns only residual waste, which is material left over after recycling.[8] The incinerator operates 24 hours a day, seven days a week. />

Waste is delivered to the station by road, using up to 100 waste collection vehicles. More than 1,000 tonnes of waste a day is delivered to the plant.[2][8][10] A rail head was also built on the railway sidings adjacent to the site in 2009. This allows for waste to be delivered to the plant by rail, rather than just by road. This is more sustainable as it reduces the amount of traffic on local roads. Which has to this day not happened, waste is still delivered by road and has damaged local roads. [8][11] In December 2011, it was announced that the rail head would be used to receive up 500,000 tonnes of residual waste per year from Merseyside via a rail waste transfer facility at Knowsley Industrial Park, Kirkby, in a contract worth £400 million, but it still arrives by road and not by rail, as the train tracks have never been fully operational.[12]

Waste arriving at the plant is checked in and weighed, before being delivered to the plant's reception hall. The large reception hall allows the vehicles to dump their waste safely. Air for the combustion of the waste later in the plant is drawn from the reception hall so that odour and dust doesn't escape the building. From the hall, waste is tipped into a large concrete bunker. Here the feedstock is homogenised by a crane operator, who mixes the waste and removes unsuitable items. A grab crane then manoeuvres waste from the bunker to the hoppers that feed the furnace. This crane is operated from a control room. This room also monitors the equipment in the plant, the combustion gases and maximises the efficiency of the plant.[10]

From the hoppers, the waste falls onto the furnace-charging chute and from there onto the incinerating grate.[10] Here it is burned at a temperature in excess of 1,200 °C.[13] This heat is then converted into super heated steam through the plant's boilers. This in turn powers steam turbines, much in the same way as a conventional thermal power station. Electricity is generated at 11 kilovolts. After exiting the turbines, the steam is condensed back to water. The original two incineration lines use river water from the Tees as a cooling medium, whereas in the third line, water is condensed through air cooled condensers. The cooled water is treated and reused in the boilers.[10]

Gases from the furnace are cleaned using selective non-catalytic reduction (SNCR), spray absorbers and active carbon injection. These processes remove nitrogen oxides, acidic gasses, dioxins and heavy metals from the plants emissions. The remaining gases are passed through fine-fabric bag filters to remove any particles, before it is released from the chimney. Each incineration line has its own independent stack in the chimney, and the flue gases are continuously monitored before being released. This information is relayed to the control room. The remaining fly ash from the filters contains particles from the incineration, lime from the spray absorbers, salt and carbon dust, and so is stored in a sealed silo until it is taken from the site for disposal. Incinerator bottom ash left on the incineration grate after the burning is moved by conveyor to a bunker. Whilst on the conveyor, a magnet removes ferrous metal from the ash for recycling.[10] The remaining ash is then used as an aggregate in the construction industry.[2]

A recycling centre operates next to the plant, which opened in December 2001. In 2006 a composting facility was opened.[2]

Environmental impact

Waste to energy plants are strictly monitored, and the plant has achieved various ISO external certificates. The plant is seen to be at the forefront of sustainable energy production and waste disposal. The plant not only reduces the amount of waste sent to landfill, but displaces the burning of depleting fossil fuels, and makes significant contributions to meeting the North East region's waste recovery and recycling targets.[14]

North East Energy Recovery Centre

A rendition of the planned second plant

In 2008, it was announced SITA had plans to build another EfW plant adjacent to the current one, named the North East Energy Recovery Centre (NEERC). SITA UK began consulting key partners, stakeholders and local residents on these plans in April 2008, before submitting a formal planning application that summer.[15] Permission for the plant's construction was granted on 15 October 2008.[16] On 17 September 2010, it was announced that SITA had signed a contract with the South Tyne and Wear Waste Management Partnership for their waste to be burned at NEERC once the plant was completed. Construction is expected to begin in early 2011, in time for a 2013 completion date.[17]

NEERC is expected to be capable of handling up to 190,000 tonnes of waste per year. This waste will be burned to generate electricity for the National Grid and cogenerate to provide heat for local industries in the form of steam.[17] NEERC will have two processing lines, capable of generating 21 MW of electricity, enough to provide for 37,500 homes.[15][17] This means that over the two facilities, 640,000 tonnes of waste will be burned annually, and over 50 MW of electricity generated.[16] This would make Teesside the largest operational EfW centre in the UK outside London.[17] The plant will be a mirror image of the current one, and will create 160 jobs; 25 in South Tyne and Wear, 100 in the construction of the plant, and the rest once the plant is operational.[17]

In August 2010, SITA teamed up with Sembcorp UK to build another waste-to-energy facility in the Teesside region. Wilton 11 on the Wilton International complex is to burn a further 400,000 tonnes of waste in the region whilst generating 35 MW of electricity. The plant is expected to be operational by 2015.[6]

References

  1. ^ "Portrack Meadows". teeswildlife. Tees Valley Wildlife Trust. Archived from the original on 20 November 2008. Retrieved 20 April 2009.
  2. ^ a b c d e f g "Teesside". sita. Société Industrielle des Transports Automobiles (SITA). Retrieved 18 December 2008.
  3. ^ "Northumberland". Société Industrielle des Transports Automobiles (SITA). 2008. Retrieved 15 December 2010.
  4. ^ a b c d "SITA UK marks first anniversary of extension at Tees Valley energy-from-waste centre". Société Industrielle des Transports Automobiles (SITA). 9 June 2010. Retrieved 5 August 2010.
  5. ^ a b "SITA Northumberland Energy-from-Waste plant at Teesside – a successful cooperation between local authority and industry" (PDF). Van Roll. pp. 2–3. Retrieved 17 January 2011.
  6. ^ a b "SITA and Sembcorp plan £200m Teesside EfW". letsrecycle.com. 10 August 2010. Retrieved 17 January 2011.
  7. ^ a b "SITA UK set to officially open new £70 million extension at Tees Valley energy-from-waste site". Société Industrielle des Transports Automobiles (SITA). 5 October 2009. Retrieved 5 August 2010.
  8. ^ a b c d e f "North East Energy Recovery Centre" (PDF). Société Industrielle des Transports Automobiles (SITA). Archived from the original (PDF) on 7 January 2009. Retrieved 22 September 2009.
  9. ^ "Waste-to-Energy Plants in the UK". Industcards. 30 October 2004. Retrieved 22 July 2009.
  10. ^ a b c d e f Paula Sinton; Rita Greenwood (2009). "Tees Valley LTD Energy from Waste Facility: 2009 Annual Performance Report" (PDF). Suez Environnement. Retrieved 17 January 2011.
  11. ^ Henderson, Tony (26 December 2008). "Rubbish could soon power our homes". The Journal. Retrieved 7 August 2009.
  12. ^ Roberts, Neil (20 December 2011). "Rail waste transfer plans approved". mrw.co.uk. Retrieved 27 August 2012.
  13. ^ "Teesside's Green Economy". British Broadcasting Corporation (BBC). 26 October 2010. Retrieved 15 December 2010.
  14. ^ "Energy from Waste". iema. 17 April 2009. Retrieved 12 June 2010.
  15. ^ a b "SITA UK consults on plans to construct a North East Energy Recovery Centre at Haverton Hill in the Tees Valley". Société Industrielle des Transports Automobiles (SITA). 17 April 2008. Retrieved 5 August 2010.
  16. ^ a b "SITA UK welcomes planning approval for the North East Energy Recovery Centre at Billingham in the Tees Valley". Société Industrielle des Transports Automobiles (SITA). 15 October 2008. Retrieved 5 August 2010.
  17. ^ a b c d e "At The Double!". nebusiness. 17 September 2010. Retrieved 15 December 2010.

Read other articles:

يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (ديسمبر 2018) 14° خط طول 14 غرب خريطة لجميع الإحداثيات من جوجل خريطة لجميع الإحداثيات من بينغ تصدير جميع الإحداثيات من كي...

 

30 April adalah hari ke-120 (hari ke-121 dalam tahun kabisat) dalam kalender Gregorian. << April >> Mi Sn Sl Ra Ka Ju Sa 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30   2023 Peristiwa 1492 – Spanyol memberi izin berlayar pada Christopher Columbus. 1786 – William Herschel menemukan galaksi NGC 5566. 1789 – George Washington mulai menjabat sebagai presiden pertama Amerika Serikat. 1803 – Amerika Serikat membeli Louisiana sehar...

 

Biblioteca Pública de Brooklyn UbicaciónPaís  Estados UnidosLocalidad BrooklynDirección 10 Grand Army Plaza, Brooklyn, NY 11238Coordenadas 40°40′21″N 73°58′05″O / 40.6724, -73.9681Datos generalesTipo sistema de bibliotecas y biblioteca públicaFundación 1896[editar datos en Wikidata] La Biblioteca Pública de Brooklyn (idioma inglés: Brooklyn Public Library. BPL) es el sistema de bibliotecas de Brooklyn, Nueva York, Estados Unidos. La biblioteca ...

Maurice-Jean-Magdalène de Broglie Maurice-Jean-Magdalène de Broglie [moˈʀis ˌʒɑ̃ magdaˈlɛn də ˈbrɔj] (* 5. September 1766; † 20. Juli 1821 in Paris) war ein französischer Geistlicher. Er amtierte als Bischof von Acqui (1805–1807) und Gent (1807–1821). Inhaltsverzeichnis 1 Leben 2 Literatur 3 Weblinks 4 Einzelnachweise Leben Wappen Maurice de Broglie war ein jüngerer Sohn des Marschalls Victor-François de Broglie aus der Familie der Herzöge de Broglie. Er trat in den gei...

 

في زمن الفراشاتIn the Time of the Butterfliesمعلومات عامةالتصنيف فيلم تلفزيوني الصنف الفني فيلم دراما تاريخ الصدور21 أكتوبر 2001 (2001-10-21)مدة العرض 95 دقيقةاللغة الأصلية اللغة الإنجليزيةاللغة الإسبانيةالبلد الولايات المتحدةالمكسيكالطاقمالمخرج ماريانو باروسوالكاتب جوليا ألفاري...

 

Амеріго Веспуччіітал. Amerigo Vespucci Ім'я при народженні Альберіґо ВеспуччіНародився 9 березня 1454[1]Флоренція, Флорентійська республіка[1]Помер 22 лютого 1512[1] (57 років)Севілья, Королівство Севільяd, Кастильська Корона[1]·малярія[1]Країна  Флорентійська респ

Affiliation politique des gouverneurs des États du Mexique en 2023 : Mouvement de régénération nationale (MORENA) : 21 Parti action nationale (PAN) : 5 Parti révolutionnaire institutionnel (PRI) : 2 Mouvement citoyen (MC) : 2 Parti de la Réunion sociale (PES) : 1 Parti vert écologiste (PVE) : 1 Cette page dresse la liste des gouverneurs actuels des États du Mexique (les gouverneurs des 31 États au sens strict ainsi que le chef du gouvernement d...

 

الجمعية الرياضية بأريانة الاسم الكامل الجمعية الرياضية بأريانة تأسس عام 1938  البلد تونس  الدوري الرابطة التونسية المحترفة الثانية لكرة القدم  الإدارة الرئيس الأسعد الشابي المدير علي الكعبي الطقم الرسمي الطقم الأساسي الطقم الاحتياطي الطقم الثالث تعديل مصدري - تعدي...

 

UFC mixed martial arts event in 2014 UFC Fight Night: Henderson vs. dos AnjosThe poster for UFC Fight Night: Henderson vs. dos AnjosInformationPromotionUltimate Fighting ChampionshipDateAugust 23, 2014 (2014-08-23)VenueBOK CenterCityTulsa, OklahomaAttendance7,119[1]Total gate$452,075[1]Event chronology UFC Fight Night: Bisping vs. Le UFC Fight Night: Henderson vs. dos Anjos UFC 177: Dillashaw vs. Soto UFC Fight Night: Henderson vs. dos Anjos (also known as UFC F...

XI Copa de Andalucía de Fútbol Sala 2017 Sede Martos Fecha 2 de septiembre de 20173 de septiembre de 2017 Cantidad de equipos 4 Podio • Campeón• Subcampeón• Semifinalistas   Jaén Paraíso Interior (2) Real Betis U. M. A. Antequera Atlético Mengíbar Goles anotados 16 (5.33 por partido) La Copa de Andalucía de Fútbol Sala 2017 fue la 11.ª edición de dicha competición andaluza. En esta edición compitieron 4 equipos, todos ellos pertenecientes a la Liga Nacional de F...

 

Halaman ini berisi artikel tentang film Italia 1990. Untuk film Inggris 2005, lihat The Open Doors. Porte aperteSutradara Gianni Amelio ProduserDitulis oleh Gianni Amelio Vincenzo Cerami Alessandro Sermoneta PemeranGian Maria VolontéEnnio FantastichiniRenato CarpentieriPenata musikFranco PiersantiSinematograferTonino NardiPenyuntingSimona PaggiDistributorOrion Pictures di AS, 1991Tanggal rilis 29 Maret 1990 (1990-03-29) Durasi108 menitNegara Italia Bahasa Italia Open Doors (bahasa...

 

Campeonatos Regionalesde España Regional de clubesDatos generalesSede  EspañaNombre completo Campeonatos Regionalesde Foot-Ball de EspañaClasificatorios al Campeonato de EspañaInauguración Mes de noviembre de 1903[n. 1]​N.º de ediciones Dependiente de cada regiónOrganizador Fed. Española de Fútbol (RFEF)Datos estadísticosParticipantes Adscritos a las Federaciones correspondientes (Primera categoría)[n. 2]​Acceso a Campeonato de España Cronología — Regionales / ...

Former Fundamentalist Church of Jesus Christ of Latter-Day Saints community in Texas The FLDS temple in the YFZ Ranch The Yearning for Zion Ranch, or the YFZ Ranch,[1] was a 1,700-acre (690-hectare) Fundamentalist Church of Jesus Christ of Latter-Day Saints (FLDS) community of as many as 700 people, located near Eldorado in Schleicher County, Texas, United States. In April 2014, the State of Texas took physical and legal possession of the property.[2][3] Background The...

 

Pedestrian mall in Boulder, Colorado Pearl Street Mall in Boulder, Colorado.The Pearl Street Mall (also referred to as Pearl Street, or Downtown Boulder) is a four-block pedestrian mall in Boulder, Colorado. The pedestrian area stretches from 11th Street to 15th Street along Pearl Street and is home to a number of businesses and restaurants as well as the Boulder County Courthouse. About The Pearl Street Mall is a popular destination for tourists visiting Boulder and for students attending th...

 

Dungeons & Dragons fictional campaign setting DragonlanceThe original Dragonlance logo.DesignersMargaret Weis and Laura and Tracy HickmanPublishersTSR, Inc.Wizards of the CoastSovereign PressPublicationMarch 1984; 39 years ago (1984-03)Years active1984–2011, 2022GenresFantasyLanguagesEnglishSystemsAD&D 1st/2nd EditionSAGA SystemD&D 3.5 EditionD&D 5th EditionChanceDice rollingMedia typeNovels, game accessories, film, audiobooks Dragonlance is a shared u...

Batalyon Artileri Medan 9/PasopatiLambang Yon Armed 9/155 GS/PasopatiDibentuk7 Juli 1962CabangArmedTipe unitSatuan Bantuan TempurPeranPasukan Artileri DaratBagian dariResimen Armed 1/Stira YudhaMarkasPurwakarta, Jawa BaratJulukanYonarmed 9/155 GS/PasopatiMotoPasopatiBaretCoklatMaskotPanah PasopatiUlang tahun7 JuliAlutsistaMeriam GS CAESAR 155mm Batalyon Artileri Medan 9/Pasopati atau Yon Armed 9/155/Gerak Sendiri adalah Batalyon Artileri Medan yang merupakan satuan bantuan tempur (satbanpur) ...

 

Christof Heyns, ex Relator Especial sobre ejecuciones extrajudiciales, sumarias o arbitrarias y Maina Kiai, ex Relator Especial sobre los derechos a la libertad de reunión pacífica y de asociación (2015). Las reuniones del Consejo de Derechos Humanos de las Naciones Unidas tienen lugar en la Sala de Derechos Humanos y Alianza de Civilizaciones del Palacio de las Naciones . Los títulos de relator especial, el de experto independiente y de miembro del grupo de trabajo son otorgados a person...

 

Educational initiative in England, Wales and Northern Ireland Blakelaw Comprehensive was the first school in the programme, reopening with a new headteacher as Firfield Community School in 1998[1] The Fresh Start programme, also known as the Fresh Start scheme, is an educational initiative in England, Wales[2] and Northern Ireland[3] introduced by the first Blair government in 1998.[4] The programme aims to improve underperforming schools in inner cities by reo...

هناك أقلية كبيرة من البشر في شمال آسيا، ولا سيما في سيبيريا، يتبعون الممارسات الدينية والثقافية للشامانية. بعض الباحثين يعتبرون سيبيريا معقل الشامانية.[1][2] يتكون شعب سيبيريا من مجموعة متنوعة من المجموعات العرقية، ولا يزال العديد منهم يتابعون الممارسات الشامانية ...

 

This article is about the episodes in the Naruto: Shippuden series. For the list of episodes from the original Naruto series, see List of Naruto episodes. Key visual of the series. Naruto: Shippuden is an anime television series mainly adapted from Part II of Masashi Kishimoto's original Naruto manga series, with exactly 500 episodes. It is set two and a half years after the original series in the Naruto universe, following the ninja teenager Naruto Uzumaki and his allies. The series is direc...

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!