December 28, 1996 – Southern extension to line 1 (Xinzhuang – Jinjiang Park) enters operation (4.40 km or 2.73 mi, 3 stations).[3][4] Total length: 20.11 km or 12.50 mi, 16 stations.
September 20, 1999 – Line 2 (Zhongshan Park – Longyang Road) enters operation (15.49 km or 9.63 mi, 12 (11 new) stations).[5][6][1] Total length: 35.60 km or 22.12 mi, 28 stations (1 interchange; 27 unique).
December 27, 2000 – An extension and a new line enters operation (27.10 km or 16.84 mi, 20 (17 new) stations):[7][1]
Line 3 (Shanghai South Railway Station – Jiangwan Town) enters operation (24.43 km or 15.18 mi, 19 (16 new) stations). Total length: 62.70 km or 38.96 mi, 48 stations (4 interchange; 44 unique).
November 25, 2003 – Line 5 (Xinzhuang – Minhang Development Zone) enters operation (16.55 km or 10.28 mi, 11 (10 new) stations).[8] Total length: 79.25 km or 49.24 mi, 59 stations (5 interchange; 54 unique).
December 28, 2004 – Northern extension to line 1 (Shanghai Railway Station – Gongfu Xincun) enters operation (12.42 km or 7.72 mi, 9 stations).[9] Total length: 91.67 km or 56.96 mi, 68 stations (5 interchange; 63 unique).
December 31, 2005 – Line 4 (Damuqiao Road - Hongqiao Road and Baoshan Road - Lancun Road) enters operation (26.59 km or 16.52 mi, 13 (10 new) stations; an additional 9 stations on share track (Hongqiao Road - Baoshan Road) with line 3), except the section between Lancun Road and Damuqiao Road that was delayed due to a construction accident.[10] Lines 3 and 4 share the same track between Hongqiao Road and Baoshan Road. These nine stations are not counted twice in the total number of stations. Total length: 118.26 km or 73.48 mi, 81 stations (8 interchange; 73 unique).
December 18, 2006 – Northern extension to line 3 (Jiangwan Town – North Jiangyang Road) enters operation (15.69 km or 9.75 mi, 10 stations).[11][1] Total length: 133.95 km or 83.23 mi, 91 stations (8 interchange; 83 unique).
December 30, 2006 – Western extension to line 2 (Songhong Road – Zhongshan Park) enters operation (5.94 km or 3.69 mi, 4 stations).[1][11] Total length: 139.89 km or 86.92 mi, 95 stations (8 interchange; 87 unique).
December 29, 2007 – Two extensions and three new lines or sections (South Xizang Road opens as interchange station on lines 4 and 8) enter operation on the same day (93.49 km or 58.09 mi, 66 (61 new) stations):[12]
Second northern extension to line 1 (Gongfu Xincun – Fujin Road) enters operations (4.23 km or 2.63 mi, 3 stations);[13]
Delayed section of line 4 (Lancun Road – Damuqiao Road), completing the loop, enters operations (7.22 km or 4.49 mi, 4 stations);[13]
Line 9 (Songjiang Xincheng – Guilin Road) enters operations (28.97 km or 18.00 mi, 12 stations).[13] Total length: 233.38 km or 145.02 mi, 161 stations (11 interchange; 148 unique).
December 28, 2008 – Line 9 is extended from Guilin Road to Yishan Road, connecting with the rest of the metro network (1.68 km or 1.04 mi, 1 (0 new) station).[14] Total length: 235.06 km or 146.06 mi, 162 stations (11 interchange; 148 unique).
July 5, 2009 – Southern extension to line 8 (Yaohua Road – Shendu Highway) enters operation, except Oriental Sports Center station (14.66 km or 9.11 mi, 8 stations).[15] Total length: 249.72 km or 155.17 mi, 170 stations (11 interchange; 156 unique).
December 5, 2009 – Line 7 (Shanghai University – Huamu Road) enters operation, except Houtan station (31.66 km or 19.67 mi, 26 (19 new) stations).[15][16] Total length: 281.38 km or 174.84 mi, 196 stations (18 interchange; 175 unique).
December 31, 2009 – An extension and a new line enters operation (41.63 km or 25.87 mi, 25 (19 new) stations):[15]
The downtown section of line 9 (Yishan Road – Century Avenue) enters operations (11.47 km or 7.13 mi, 9 (5 new) stations);
First section of line 11 (Jiangsu Road – North Jiading) enters operations, except Chenxiang Highway station (30.16 km or 18.74 mi, 16 (14 new) stations). Total length: 323.01 km or 200.71 mi, 221 stations (23 interchange; 194 unique).
February 24, 2010 – Short section of eastern extension of line 2 (Longyang Road – Guanglan Road) enters operation (3.59 km or 2.23 mi, 2 stations). Zhangjiang Hi-Tech Park station is rebuilt underground.[17] Total length: 326.60 km or 202.94 mi, 223 stations (23 interchange; 196 unique).
March 29, 2010 – Branch line of line 11 (Jiading Xincheng – Anting) enters operation, except East Changji Road station (12.51 km or 7.77 mi, 3 stations).[18] Total length: 347.44 km or 215.89 mi, 228 stations (23 interchange; 201 unique).
April 7, 2010 - The section Century Avenue-Middle Yanggao Road opens on line 9 (2.43 km or 1.51 mi, 1 station). Total length: 349.87 km or 217.40 mi, 229 stations (23 interchange; 202 unique).
April 8, 2010 – Eastern extension to line 2 (Guanglan Road – Pudong International Airport) enters operation (23.69 km or 14.72 mi, 8 stations), connecting the two airports.[17][19] Total length: 373.56 km or 232.12 mi, 237 stations (23 interchange; 210 unique).
April 10, 2010 – Line 10 (Xinjiangwancheng – Hangzhong Road) enters operation (29.44 km or 18.29 mi, 27 (21 new) stations).[17] Shanghai Metro becomes the longest metro system in the world after 15 years of breakneck growth.[20] Total length: 403.00 km or 250.41 mi, 264 stations (29 interchange; 231 unique).
April 20, 2010 – A temporary line and an infill station enters operation (4 km or 2.5 mi, 4 (3 new) stations):[21][22]
Expo section of line 13 (Madang Road – Shibo Avenue) enters temporary operation (4 km or 2.5 mi, 3 (2 new) stations);
Houtan station on line 7 opens (1 station). Total length: 407.00 km or 252.90 mi, 268 stations (30 interchange; 234 unique).
November 2, 2010 – With the end of the Shanghai Expo, the Expo section of line 13 suspends service, to be reopened when the rest of the line is completed (−4 km or −2.5 mi, -3 stations). Total length:403.00 km or 250.41 mi, 266 stations (29 interchange; 233 unique).
November 30, 2010 – Branch section of line 10 (Longxi Road – Hongqiao Railway Station) enters operation (5.48 km or 3.41 mi, 4 (2 new) stations), connecting the two terminals of Hongqiao Airport.[17] Total length: 408.48 km or 253.82 mi, 270 stations (31 interchange; 235 unique).
April 12, 2011 – An interchange station Oriental Sports Center station opens[24][25] adding an infill station on line 8 and extending line 6 (South Lingyan Road — Oriental Sports Center) extends (1.54 km or 0.96 mi, 1 station). Allowing the Shanghai Metro to reach 421.76 km or 262.07 mi, 275 stations (32 interchange; 239 unique).
April 26, 2011 – Line 11East Changji Road station opens (1 station).[24] Total length: 421.76 km or 262.07 mi, 276 stations (32 interchange; 240 unique).
June 30, 2011 – Panguang Road station and Liuhang station on line 7 open (2 stations).[24] Total length: 421.76 km or 262.07 mi, 278 stations (32 interchange; 242 unique).
September 28, 2012 – China Art Museum station on line 8 opens (1 station). Total length: 421.76 km or 262.07 mi, 279 stations (32 interchange; 243 unique).
December 30, 2012 – An extension and a new line enters operation (14.26 km or 8.86 mi, 8 (7 new) stations):
June 15, 2013 – South Qilianshan Road station on line 13 opens (1 station). Total length: 436.02 km or 270.93 mi, 288 stations (33 interchange; 251 unique).
August 31, 2013 – The second phase of line 11 (Jiangsu Road – Luoshan Road) enters operation, except Yanyu Road (21.73 km or 13.50 mi, 12 (9 new) stations).[27] Total length: 463.43 km or 287.96 mi, 300 stations (34 interchange; 260 unique).
October 16, 2013 – The branch extension of line 11 (Anting – Huaqiao) enters operation (5.68 km or 3.53 mi, 3 stations). Shanghai Metro is extended into Jiangsu province,[28] and becomes the first inter-provincial Chinese rapid transit system and second intercity system after the Guangfo Metro. Total length: 469.11 km or 291.49 mi, 303 stations (34 interchange; 263 unique).
December 29, 2013 – Two new lines enter operation (68.47 km or 42.55 mi, 26 (22 new) stations):[29]
The eastern section of line 12 (Tiantong Road – Jinhai Road) enters operation (17.71 km or 11.00 mi, 15 (12 new) stations);
Line 16 (Luoshan Road – Dishui Lake) enters operation (50.76 km or 31.54 mi, 11 (10 new) stations). Shanghai’s subway network retook the title of longest in the world.[30] Total length: 537.58 km or 334.04 mi, 329 stations (38 interchange; 285 unique).
May 10, 2014 – Line 12 extension (Jinhai Road - Qufu Road) (1.04 km or 0.65 mi, 1 (0 new) station).[31] Total length: 538.62 km or 334.68 mi, 330 stations (39 interchange; 285 unique).
July 22, 2014 – Qihua Road station on line 7 opens (1 station). Total length: 538.62 km or 334.68 mi, 331 stations (39 interchange; 286 unique).
November 1, 2014 – Daduhe Road station on line 13 opens (1 station). Total length: 538.62 km or 334.68 mi, 332 stations (39 interchange; 287 unique).
December 28, 2014 – Two extensions enter operation (10.18 km or 6.33 mi, 5 (2 new) stations):[32]
Extension to line 16 (Luoshan Road – Longyang Road) enters operation (7.04 km or 4.37 mi, 2 (1 new) stations). Total length: 548.80 km or 341.01 mi, 337 stations (41 interchange; 289 unique).
December 19, 2015 – Three extensions enter operation (34.62 km or 21.51 mi, 27 (14 new) stations):[33]
Extension to line 12 (Qufu Road – Qixin Road) enters operation (20.74 km or 12.89 mi, 16 (7 new) stations);
Extension to line 13 (Changshou Road – Shibo Avenue) enters operation (9.78 km or 6.08 mi, 9 (5 new) stations). Total length: 583.42 km or 362.52 mi, 364 stations (51 interchange; 303 unique).
April 26, 2016 – Extension to line 11 (Kangxin Highway - Disney Resort) enters operation (5.08 km or 3.16 mi, 1 station).[34] Total length: 588.50 km or 365.68 mi, 365 stations (51 interchange; 304 unique).
December 30, 2017 – An extension and a new line enters operation (48.82 km or 30.34 mi, 22 (20 new) stations):[35]
The eastern extension of line 9 from Middle Yanggao Road to Caolu enters operations (14.10 km or 8.76 mi, 9 (8 new) stations);
Line 17 opens from Hongqiao Railway Station to Oriental Land (34.72 km or 21.57 mi, 13 (12 new) stations). Total length: 637.32 km or 396.01 mi, 387 stations (52 interchange; 324 unique).
March 31, 2018 – Pujiang line (Shendu Highway – Huizhen Road) enters operation (6.60 km or 4.10 mi, 6 (5 new) stations).[36] Total length: 643.92 km or 400.11 mi, 393 stations (53 interchange; 329 unique).
December 30, 2018 – Two extensions enters operation (32.42 km or 20.14 mi, 20 (16 new) stations):[37]
Extension to line 13 (Shibo Avenue – Zhangjiang Road) enters operation (16.24 km or 10.09 mi, 12 (8 new) stations). Total length: 676.34 km or 420.26 mi, 413 stations (57 interchange; 345 unique).
August 25, 2020 – Chenxiang Highway station on line 11 opens (1 station).[38] Total length: 676.34 km or 420.26 mi, 414 stations (57 interchange; 346 unique).
December 26, 2020 – An extension and a new line enters operation (25.07 km or 15.58 mi, 14 (12 new) stations):[39]
Line 18 (Yuqiao – Hangtou) opens (15.05 km or 9.35 mi, 8 (7 new) stations). Total length: 701.41 km or 435.84 mi, 428 stations (59 interchange; 358 unique).
January 23, 2021 – Line 15 (Gucun Park - Zizhu Hi-tech Park) enters operation, except Guilin Road station (41.22 km or 25.61 mi, 29 (23 new) stations).[40] Shanghai retook the title of longest metro system in the world. Total length: 742.63 km or 461.45 mi, 457 stations (64 interchange; 381 unique).
June 27, 2021 – Guilin Road station on line 15 opens (1 (0 new) station), making the station an interchange station with line 9.[41] Total length: 742.63 km or 461.45 mi, 458 stations (65 interchange; 381 unique).
December 30, 2021 – An extension and a new line (Changyi Road opens as interchange station on lines 14 and 18) enters operation (59.63 km or 37.05 mi, 48 (27 new) stations):[42]
Extension to line 18 (Yuqiao – South Changjiang Road) (21.45 km or 13.33 mi, 18 (10 new) stations). Total length: 802.26 km or 498.50 mi, 506 stations (83 interchange; 408 unique).
^Shanghai Metro is extended into Jiangsu province,[28] and becomes the first inter-provincial Chinese rapid transit system and second intercity system after the Guangfo Metro.
^Shanghai’s subway network retook the title of longest in the world.[44]
Formerly part of south extension of line 11. Between 29 January and 1 March 2010 designated as line 21. Also referred to as Lingang line (临港线). Nickname: Excursion line (as it connects several scenic spots).
Up to 8 Aug 2002 named Pearl (or Mingzhu) line (明珠线). Due to the publicity of some media in the early years and some existing misidentifications (such as "Light Rail Line 3" in Shanghai South Railway Station), Shanghai citizens are used to calling it the light rail as it is an elevated line.
At the official opening in April 1995, the approved fare scheme was 2, 4, and 6 yuan, but a discounted fare scheme of 1, 2, and 3 yuan was implemented. The plan was to return to the approved fare scheme at end of the year.
December 1995: Instead of returning to the approved fare scheme, due to extensive public pressure, a single fare of 2 yuan was implemented (length of line 1 was 15.71 kilometers/13 stations at the time).
At the opening of the southern extension in December 1996, this section (Xinzhuang – Jinjiang Paradise) operated independently with a fare of 1 yuan.
On July 1, 1997 (as through operations at Jinjiang Paradise were established) the line introduced a two-level segment fares of 2 yuan (13 stops or less) and 3 yuan (14 stops or more).
On March 1, 1999, the fare increased with 1 yuan (i.e. 3 yuan (13 stops or less) and 4 yuan (14 stops or more)). Shanghai Metro line 1 opened an automatic ticket collection system (using an American system), using one-way tickets (magnetic cards) and stored-value tickets (IC cards), and the original paper tickets were discontinued.
In August 2000 the fare scheme of line 1 was changed to the unified fare scheme.
At the official opening in May 2000 the fare of line 2 is 2 yuan for 0 to 6 kilometers; 3 yuan for 6 to 16 kilometers; more than 16 kilometers, the fare increases by 1 yuan for every additional 6 kilometers. From opening line 2 used magnetic card one-way ticket, and the magnetic card stored-value ticket and the contactless smart card stored-value ticket which can be used on metro lines 1 and 2.[46]
In August 2000 the fare scheme of line 2 was changed to the unified fare scheme.
To ease the traffic pressure in the tunnel, line 2 launched a special price of 1 yuan for crossing the river (within 3 stops) between August 10, 2000, and November 1, 2001, and then the number of passengers increased exponentially.[47][48]
From opening in December 2000 preferential fares were implemented, with 2 yuan for the ride below 9 stops, and 3 yuan for the ride with more than 10 stops.[49]
From November 1, 2003, the unified fare scheme was implemented. Paper tickets on line 3 were discontinued. The ticket collection system used the Indra system from Spain, which was incompatible with the ticket system of lines 1 and 2. Therefore, passengers still had to exit the station at Zhongshan Park to transfer between lines 2 and 3.
From opening in 2003 a reduced fare is 2 yuan for journeys under 6 km and all other journeys on the line were 3 yuan (though the total length of this section is a bit longer than 16 km), originally implemented to cultivate passenger flow.
In December 2005 paper tickets were discontinued. The unified fare scheme was implemented for rides not exclusively on line 5 (rides exclusively on line 5 kept their reduced fare).
Until December 26, 2020, there remained for journeys exclusively on the 1st phase of line 5 (Xinzhuang – Minhang Development Zone) a reduced fare is 2 yuan for journeys under 6 km and all other journeys on the line were 3 yuan. This was not applied once passengers interchange to other lines, e.g. fare for passengers from Xinzhuang to Chunshen Road was 2 Yuan, while fare for passengers from Waihuanlu to Chunshen Road was 3 Yuan.
During the Expo 2010 in Shanghai riding on the expo line (currently line 13) was free. A valid Expo ticket was needed to ride the line.
From August 2000 passengers can change between lines 1 and 2 at People's Square without exiting the station. A unified fare scheme was introduced for lines 1 and 2 with a fare of 2 yuan within 6 kilometers, 3 yuan for 6-16 kilometers, and 1 yuan for every additional 6 kilometers (e.g. 4 yuan for more than 16 kilometers). For journeys exclusively from Xinzhuang Station to People's Square Station, the fare is calculated as if it is less than 16 kilometers, though the distance between People's Square Station and Xinzhuang Station is about 17.8 km (11.1 mi).
In 2003 line 3 implemented the unified fare scheme (though in station interchange to other lines was not yet established).
On September 15, 2005, the shortest rides increased their fare by 1 yuan from 2 yuan to 3 yuan. This was to relieve the overcrowded metro network (with a daily ridership of 1.3 million people in 2004). After 16 kilometers the fare increases with 1 yuan for every 10 kilometers instead of every 6 kilometers. Therefore, rides longer than 28 kilometers had their prices either remained the same or dropped by 1 or 2 yuan. These price changes were meant to encourage more people to take the bus, particularly during rush hour as about 30% of rush-hour passengers and 38% of the total passengers use the subways for short trips. However, the metro fare increase seems to have had little effect.
On October 21, 2005, Shanghai Metro lines 1 and 2 fully launched the new "One-Ticket Pass" ticket card.
In November 2005 the cumulative discount scheme was introduced: a discount scheme of 10% after 70 yuan was introduced to benefit long-distance passengers.[50]
On December 25, 2005, Shanghai Metro realized a "one-ticket transfer" across the entire Shanghai Metro between lines 1, 2, 3, and 5 and avoids the problem of inability to continuously count the journeys due to the second ticket purchase. Shanghai Metro has become the first enterprise in China to realize the network operation of the automatic fare collection system. Passengers do not have to exit the station at Zhongshan Park to transfer between lines 2 and 3 and do not have to exit Xinzhuang to transfer between lines 1 and 5. Note: virtual interchange between lines 1 and 3 at Shanghai Railway Station was only implemented on June 1, 2008. New line openings from 2005 adopted the unified fare scheme.
In October 2007 the combined ride discount was introduced: when transferring between air-conditioned bus and Shanghai metro travelers can enjoy 1 yuan discount.
In April 2009 the combined ride discount was extended to include all bus rides (also non air-conditioned bus rides). The transfer time is extended to 2 hours.
On 24 April 2010 a one-day pass priced at 18 yuan was introduced for the Expo 2010 held in Shanghai (continued to be offered after Expo 2010).
On 8 March 2012 a three-day pass priced at 45 yuan was introduced.
On 26 June 2016 after the implementation of the comprehensive pension system for the elderly, the free transportation for seniors over 70 were abolished. On 1 July 2016 an insurance transportation card, referred to as "Baotong Card" (保通卡) was launched by commercial insurer Pacific Insurance Company for senior Shanghainese with household registration to take free all-day free rides.
^2号线明起通至浦东国际机场 [From tomorrow, line 2 will reach Pudong International Airport]. 163.com news. 7 April 2010. Archived from the original on 15 July 2012. Retrieved 7 April 2010.
^ ab上海地铁总长 全球第一 (in Chinese). Zaobao.com. 2010-03-23. Archived from the original on 2012-01-08. Retrieved 2011-12-05.
^轨道交通世博会试运营首日经受考验 (in Chinese). Shanghai Metro. 2010-04-21. Archived from the original on 2010-04-24. Retrieved 2010-04-21.
^ abc(四)城市交通. shtong.gov.cn (in Chinese). Archived from the original on 2014-08-18. Retrieved 2018-07-31.
^济阳路地铁站改东方体育中心站_新闻_新民网. news.xinmin.cn (in Chinese). Archived from the original on 27 August 2016. Retrieved 13 September 2017.
^ ab13号线一期西段12月30日起载客试运营. www.shmetro.com (in Chinese). 2012-12-28. Archived from the original on 2012-12-31. Shanghai Metro. Retrieved on December 30, 2012.
^11号线二期8月31日起通车试运营 (in Chinese). Shanghai Metro. 2013-08-29. Archived from the original on 2013-09-01. Retrieved 2013-09-01.
^上海地铁·新闻中心·12号线、16号线12月29日起载客试运营 [Lines 12 and 16 begin trial passenger operations on 29 December] (in Chinese). Shanghai Metro. Archived from the original on 2014-11-25. Retrieved 2015-01-11.
^Shanghai Metro (2018-03-27). 浦江线 3月31日起通车试运营. Shanghai Shentong Metro Group Co., Ltd. (in Chinese (China)). Archived from the original on 2018-03-31. Retrieved 2018-04-02.
^1月23日起上海地铁15号线开通初期运营 [Shanghai Metro Line 15 to open on 23 January]. www.shmetro.com (in Chinese). 21 January 2021. Retrieved 21 January 2021.
^6月27日起15号线桂林路站开通初期运营、17号线末班车常态化延时运营30分钟 [Guilin Road Station of Line 15 initial opens on June 27th, with service end of line 17 normalized delays for 30 minutes.]. www.shmetro.com (in Chinese). 25 June 2021. Retrieved 26 June 2021.
^"14号线、18号线一期北段12月30日起开通初期运营 申城轨道交通网831公里、5条全自动线 规模世界第一" [Shanghai Metro Line 14 & Line 18 Phrase I north part to enter service on 30 December with the network extends to 831 kilometers and five GoA4 lines as the world's largest metro system]. shmetro.com (in Chinese). 28 December 2021. Retrieved 28 December 2021.
^2号线明起通至浦东国际机场 [From tomorrow, line 2 will reach Pudong International Airport]. 163.com news. 7 April 2010. Archived from the original on 15 July 2012. Retrieved 7 April 2010.