Jakarta LRT

Jakarta LRT
Jakarta LRT at Boulevard Utara station
Jakarta LRT at Boulevard Utara station
Overview
OwnerProvincial Government of DKI Jakarta
LocaleJakarta, Indonesia
Transit typeLight rapid transit
Number of lines1 (operational)
1 (under construction)
2 (planned)
Number of stations29 (6 operational, 5 under construction, 18 planned)
Websitewww.lrtjakarta.co.id
Operation
Began operationDecember 1, 2019; 5 years ago (2019-12-01)
Operator(s)PT LRT Jakarta
(PT Jakarta Propertindo)
CharacterElevated
Number of vehiclesEight two-car trainsets by Hyundai Rotem
Headway10 minutes
Technical
System length5.8 km (3.6 mi) (operational)[1]
6.4 km (4.0 mi) (construction)
46.8 km (29.1 mi) (planned)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge[1]
Electrification750 V DC third rail[2]
Top speed80 km/h (50 mph)

The Jakarta Light Rapid Transit[3] or Jakarta LRT (Indonesian: Lintas Rel Terpadu Jakarta, lit. "Jakarta Integrated Rail Line") is one of the light rapid transit[4] systems in Jakarta, the capital city of Indonesia. It is conceived and built by the Jakarta provincial government.[5] The first phase of the LRT, from Velodrome to Pegangsaan Dua, began commercial operations on 1 December 2019.[6]

Jakarta LRT is operated by PT LRT Jakarta, a subsidiary of municipally-owned property and infrastructure company PT Jakarta Propertindo (Jakpro).

History

Background

The proposed LRT system in Jakarta was initially conceived as an alternative to the suspended Jakarta Monorail construction project. The suspension of the monorail project was due to the objection of the Governor of Jakarta, Basuki Tjahaja Purnama, to the construction of the monorail depot above the Setiabudi Reservoir. This decision was made to avoid a recurrence of the 2013 Jakarta flood incident that occurred due to the collapse of the Latuharhari Embankment. The monorail project was ultimately cancelled as the investors failed to meet the advanced requirements set by the Jakarta Provincial Government. Consequently, the LRT project became the priority, with Governor Basuki Tjahaja Purnama expressing his hope for greater consistency and fewer setbacks compared to the discontinued monorail project.[7][8][9]

The plan for the construction of the Jakarta LRT refers to Presidential Regulation Number 99 of 2015 concerning the Acceleration of the Implementation of Public Transportation on the Special Capital Region of Jakarta Province. As part of the preparation for the 2018 Asian Games, the Jakarta LRT was designated as a complementary public transportation system, and to facilitate its construction, the Governor of Jakarta directly appointed PT Jakarta Propertindo and PT Pembangunan Jaya for the project.[10][11]

Phase 1

Hyundai Rotem train leaving Velodrome station during a limited trial run on 7 September 2018

The groundbreaking of the Jakarta LRT was previously planned to be held in conjunction with the Greater Jakarta LRT groundbreaking in September 2015. The Jakarta LRT groundbreaking was held on 22 June 2016, coinciding with the 489th Anniversary of the City of Jakarta.[12][13] In December 2016, PT Wijaya Karya was appointed as the contractor for the LRT construction project worth Rp5.29 trillion (around US$347.6 million).[14] The construction itself only started in early 2017 after the land preparation process had been completed.[15]

The Jakarta LRT project seeks to address the issue of heavy traffic congestion on the city's roads.[16] The rolling stock comes from Hyundai Rotem from South Korea which was first arrived from the Tanjung Priok Port on April 13, 2018.[17] Each trainset consists of two cars and will be able to carry 270 to 278 passengers. There will be a total of 16 cars.[1] Platform screen doors by ST Engineering Electronics will be installed at all stations. To build the site, BCA had disbursed 2.78 trillion rupiahs of their syndicated loans.[18]

The completion target of the Jakarta LRT construction before the 2018 Asian Games was not met, resulting in the limited operation of the LRT during the competition as a trial run.[19] The limited trial run was carried out starting August 15, 2018.[20][21]

A full public trial run began on 11 June 2019 between Boulevard Utara and Velodrome stations, with free admission to registered ticket holders.[22] Since commercial operation began in December 2019, the "flagging" system has seen falling ridership, with an average of 4,364 passengers per day.[23]

Phase 1B

The groundbreaking for phase 1B was held on 30 October 2023.[24] PT Waskita Karya was appointed as the constructor for phase 1B.[24] The project would serve as an extension to the already operational Phase 1 line from Velodrome to Pegangsaan Dua.[25] The plan is to build 6.4 km of new tracks and five new stations; Pemuda Rawamangun, Pramuka BPKP, Pasar Pramuka, Matraman, and Manggarai.[25] Phase 1B cost an estimated Rp5.5 trillion, all were to be funded via Jakarta's own provincial budget.[25] The Acting Governor of DKI Jakarta, Heru Budi Hartono, said that Phase 1B will run from 2024 to 2026, with construction from Rawamangun to Pramuka stations finishing in September 2024 and the rest following in 2026.[25]

System network

The Jakarta LRT is expected to stretch across over 59.0 kilometres (36.7 mi), including 26.9 kilometres (16.7 mi) for the South line (from Pengansaan Dua to Pesing), 22.7 kilometres (14.1 mi) for the North line (from Pesing to JIS), and 9.4 kilometres (5.8 mi) for the South East line (from Velodrome to Halim).[26]

Colour and Line Name Phase Service Commencement Terminus Stations Length Depot
Operational
South Line 1A 1 December 2019 Pegangsaan Dua
Velodrome
6 5.8 km (3.6 mi) Pegangsaan Dua
Under construction
South Line 1B 2026 Velodrome
Manggarai
5 6.4 km (4.0 mi) Pegangsaan Dua
Planned[26]
South Line 1C 2028 Manggarai
Dukuh Atas
1 2.4 km (1.5 mi) Pegangsaan Dua
South Line 1D 2028 Dukuh Atas
Pesing
13 12.3 km (7.6 mi)
North Line 1E 2030 Pesing
Rajawali
6 8.9 km (5.5 mi)
North Line 2A 2030 Kelapa Gading
JIS
6 8.2 km (5.1 mi)
South East Line 2B 2030 Velodrom
Klender
4 4.5 km (2.8 mi)
North Line 3A 2033 JIS
Rajawali
4 5.6 km (3.5 mi)
South East Line 3B 2033 Klender
Halim
4 4.9 km (3.0 mi)

Southern Line

Operational

  • Phase 1 - Pegangsaan Dua - Velodrome, along 5.8 km[27]

Under construction

  • Phase 1B - Velodrome - Manggarai, along 6.4 km[28]
Station Number Station Name Region
Phase 1
S01U01 Pegangsaan Dua North Jakarta
S02 Boulevard Utara
S03 Boulevard Selatan
S04 Pulomas East Jakarta
S05 Equestrian
S06 Velodrome
Phase 1B (under construction): Velodrome–Manggarai
S07 Rawamangun East Jakarta
S08 Pramuka BPKP
S09 Pasar Pramuka
S10 Matraman
S11 Manggarai South Jakarta
Phase 2B (under feasibility study): Velodrome–Klender
S12 Pemuda East Jakarta
S13 Pulo Gadung Barat
S14 Jayakarta
S15 Klender
Phase 3B (under feasibility study): Klender–Halim
S16 Pahlawan Revolusi East Jakarta
S17 Pondok Bambu Utara
S18 Kalimalang
S19 Halim

Construction of Route 1 started on 22 June 2016. The first six kilometers of the route connecting the Kelapa Gading Depot to Velodrome Station was 29.61% complete by 26 June 2017. It was expected to be operational before the 2018 Asian Games.[29] However, this did not happen as construction is not yet finished and the Indonesia Asian Games Organizing Committee (INASGOC) considered that buses would be more effective in transporting the athletes.[30][31]

The test run for the LRT was initially scheduled for 10 August, however was delayed to 15 August 2018. Phase 1 was planned to begin operation in February, 2019.[32] After several delays, the line opened for free public trial run from July to late November 2019. Commercial operations began on 1 December 2019.[33][34]

Northern Line (Planned)

Station numbers Stations Location
Phase 2A (under feasibility study): Pegangsaan Dua–Jakarta International Stadium (JIS)
U01S01 Pegangsaan Dua North Jakarta
U02 Kelapa Nias
U03 Boulevard Gading
U04 Sunter Timur
U05 Gelanggang Remaja
U06 Sunter Barat
U07 JIS
Phase 3A (under feasibility study): Jakarta International Stadium (JIS)–Rajawali
U08 Martadinata North Jakarta
U09 Benyamin Sueb
U10 Kemayoran
U11 Rajawali Central Jakarta

Future development

Pembangunan Jaya LRT (LRT KPDBU)

Apart from the North and South Line plans, the Jakarta Provincial Government is also planning the construction of the Pulogebang-Joglo LRT route for 32.15 km (19.98 mi). This line procurement is carried out under the Regional Government and Business Entity Cooperation scheme between the Jakarta Provincial Government and PT Pembangunan Jaya.

Ticket and fare

LRT Jakarta begun collecting fares from 1 December 2019. On the entire system, passengers pay a flat fare of Rp 5.000.[35][36]

LRT Jakarta accept both cash and cashless payment. Cash payment are accepted to pay single trip tickets. Passengers must deposit of Rp 15.000 in addition to journey fare, which could be refunded within 7 days after last tapping out at exit gate.[37][38]

Cashless payment methods accepted are prepaid cards and electronic wallet. Prepaid cards accepted include e-money (Bank Mandiri), Flazz (Bank BCA), TapCash (Bank BNI), Brizzi (Bank BRI) Jakcard (Bank DKI), and Multi Trip Card (KAI Commuter). LRT Jakarta also accepts Jak Lingko-branded payment cards provided by Bank DKI, Bank Mandiri, Bank BRI, and Bank BNI. Fares are deducted from these prepaid cards upon exiting.[37][38] From 3 August 2020, LRT Jakarta accepts payment from electronic wallet. To date it only accepts wallets provided by LinkAja. Passengers only need to scan QR code at the entry gate to pay directly from their LinkAja e-wallet.[39]

See also

References

  1. ^ a b c Ramadhan, Ardito (14 April 2018). "Ini Spesifikasi Kereta LRT yang Tiba di Jakarta". KOMPAS.com (in Indonesian). Retrieved 2 November 2018.
  2. ^ Fahd, Zacky (3 December 2017). "Eksklusif: Ini Dia Foto Sarana Kereta LRT Jakarta Kelapa Gading – Velodrome!". KAORI Nusantara (in Indonesian). Retrieved 2 November 2018.
  3. ^ "An easier commute for north Jakartans". www.mottmac.com. Mott MacDonald. Retrieved 20 February 2024.
  4. ^ Jakarta, added 2024-02-12.
  5. ^ "Rencana LRT di Jakarta". Kompas (in Indonesian). Jakarta. 11 September 2015. Archived from the original on 11 October 2015. Retrieved 21 September 2015.
  6. ^ Muthiariny, Dewi Elvia (21 November 2019). Afifa, Laila (ed.). "LRT Jakarta Fare to be Valid per December 1". Tempo. Retrieved 22 November 2019.
  7. ^ Aziza, Kurnia Sari (10 September 2015). Syatiri, Ana Shofiana (ed.). "Ahok: "Bye-bye" Monorel..." KOMPAS.com (in Indonesian). Retrieved 17 March 2023.
  8. ^ Aziza, Kurnia Sari (29 May 2015). Afrianti, Desy (ed.). "Ahok: Kami Tidak Mau Lagi Kembangkan Monorel". KOMPAS.com (in Indonesian). Retrieved 17 March 2023.
  9. ^ Sutianto, Feby Dwi. "Ngotot Soal LRT, Ahok: Monorel Jadi Pengalaman". detikfinance (in Indonesian). Retrieved 17 March 2023.
  10. ^ Wuragil, Zacharias (12 August 2018). "Gagal Buat Asian Games, Ini Perjalanan Proyek LRT Sejak Era Ahok". Tempo. Retrieved 1 November 2022.
  11. ^ Aziza, Kurnia Sari (26 June 2015). Syatiri, Ana Shofiana (ed.). "Ahok Tunjuk Langsung Jakpro dan Pembangunan Jaya Bangun LRT". KOMPAS.com (in Indonesian). Retrieved 17 March 2023.
  12. ^ Purnamasari, Deti Mega (22 June 2016). "HUT ke-489, Pemprov DKI Groundbreaking LRT di Rawamangun". beritasatu.com (in Indonesian). Retrieved 1 November 2022.
  13. ^ Bintang, Amri (22 June 2016). "Groundbreaking LRT Jakarta Menjadi Kado HUT Kota Jakarta Yang ke-489". KAORI Nusantara (in Indonesian). Retrieved 1 November 2022.
  14. ^ Sukarno, Puput Ady (21 December 2016). "Jakpro Resmi Tunjuk WIKA Garap LRT DKI Jakarta". Bisnis.com (in Indonesian). Retrieved 1 November 2022.
  15. ^ Simorangkir, Eduardo. "LRT Jakarta Rute Kelapa Gading-Velodrome Mulai Konstruksi Maret 2017". detikfinance (in Indonesian). Retrieved 1 November 2022.
  16. ^ Eka, Aditya (13 September 2018). "Laporan Perjalanan: Inilah Kesan Pertama Kereta LRT Jakarta - KAORI Nusantara". KAORI Nusantara (in Indonesian). Retrieved 2 November 2018.
  17. ^ Ramadhan, Ardito (13 April 2018). Jatmiko, Bambang Priyo (ed.). "Ini Spesifikasi Kereta LRT yang Tiba di Jakarta". KOMPAS.com (in Indonesian). Retrieved 17 March 2023.
  18. ^ "Untuk Pembangunan Light Rail Transit (LRT) Jabodebek, BCA Kucurkan Kredit Sindikasi Rp2,78 Triliun". Okezone. 6 January 2018. Retrieved 10 January 2022.
  19. ^ Simorangkir, Eduardo. "LRT Jakarta Hanya Beroperasi Terbatas saat Asian Games 2018". detikfinance (in Indonesian). Retrieved 1 November 2022.
  20. ^ Ramadhan, Ardito (15 August 2018). Belarminus, Robertus (ed.). "Uji Coba LRT Jakarta Hanya untuk Kalangan Terbatas". KOMPAS.com (in Indonesian). Retrieved 17 March 2023.
  21. ^ "Gagalnya LRT Jakarta Melayani Publik di Asian Games 2018". CNBC Indonesia (in Indonesian). Retrieved 1 November 2022.
  22. ^ "LRT Jakarta starts free public trial on Tuesday". 10 June 2019.
  23. ^ Aqil, Andi Muhammad Ibnu (20 January 2020). "Flagging LRT Jakarta to court passengers with expansion, promotions". The Jakarta Post.
  24. ^ a b antaranews.com (30 October 2023). "Waskita Lanjutkan Pembangunan LRT Jakarta Fase 1B, Menhub Lakukan Groundbreaking". Antara News. Retrieved 1 November 2023.
  25. ^ a b c d detikcom, Tim. "Serba-serbi Proyek LRT Jakarta Fase 1B Rute Velodrome-Manggarai". detiknews (in Indonesian). Retrieved 1 November 2023.
  26. ^ a b "Potential Projects". invest.jakarta.go.id. Retrieved 17 July 2024.
  27. ^ Pitoko, Ridwan Aji (24 August 2018). Jatmiko, Bambang Priyo (ed.). "Kemenhub Lakukan Operasional Terbatas untuk LRT Kelapa Gading - Kompas.com". KOMPAS.com (in Indonesian). Retrieved 7 September 2018.
  28. ^ "Cek! Ini Rencana Proyek LRT Velodrome-Manggarai Rp 5,5 Triliun". Detik Finance (in Indonesian). Retrieved 6 June 2023.
  29. ^ "In August 2018, Kelapa Gading-Rawamangun LRT to Commence Operation".
  30. ^ Wuragil, Zacharias (12 August 2018). "Duh, LRT Jakarta Akhirnya Gagal Ikut Asian Games". Tempo (in Indonesian). Retrieved 26 August 2018.
  31. ^ Ninditya, Fransiska (11 April 2018). Ratomo, Unggul Tri (ed.). "LRT gagal beroperasi saat Asian Games Jakarta" (in Indonesian). Antara. Retrieved 26 August 2018.
  32. ^ Manurung, Muhammad Yusuf (15 August 2018). "Kantongi Izin dari Kemenhub, Hari Ini LRT Uji Operasi". Tempo (in Indonesian). Retrieved 26 August 2018.
  33. ^ Kartika, Mimi (3 June 2019). "Peresmian LRT Jakarta Diundur, Ini Penjelasan Anies". Republika Online. Republika Online. Retrieved 3 June 2019.
  34. ^ Aranditio, Stephanus; Lesmana, Agung Sandy (21 June 2019). "Skybridge Rampung, Stasiun LRT Velodrome Resmi Terintegrasi Halte Busway". Suara.
  35. ^ Pahrevi, Dean (21 November 2019). "LRT Jakarta Dikomersilkan 1 Desember, Tarifnya Rp 5.000 Sekali Perjalanan". KOMPAS.com. Retrieved 16 August 2020.
  36. ^ Amali, Zakki (1 December 2019). "LRT Jakarta Resmi Berbayar 1 Desember, Tarif Rp5 Ribu Jauh-Dekat". tirto.id. Retrieved 16 August 2020.
  37. ^ a b Rahma, Athika (1 December 2019). "Resmi Berbayar, Ini Beragam Cara Beli Tiket LRT Jakarta". LIPUTAN 6. Retrieved 25 March 2020.
  38. ^ a b Setiyadi, Bima (2 December 2019). "Tiket LRT Jakarta Bisa Gunakan Seluruh Uang Elektronik". SINDONEWS.com. Retrieved 17 January 2021.
  39. ^ Catriana, Elsa (3 August 2020). "Bayar LRT Jakarta Bisa pakai LinkAja, Ini Promonya". KOMPAS.com. Retrieved 17 January 2021.

Read other articles:

葵若菜於2018年日本中央競馬會第35屆Hopeful Stakes表彰式女艺人原文名葵 わかな罗马拼音Aoi Wakana国籍 日本出生 (1998-06-30) 1998年6月30日(25歲) 日本神奈川縣职业演員活跃年代2009年-至今经纪公司星塵傳播网站官方網站互联网电影数据库(IMDb)信息 葵若菜(日语:葵 わかな,1998年6月30日—),日本女演員,出生於神奈川縣,隸屬於星塵傳播事務所。她是偶像團體乙女...

 

 

2016 filmSouthwest of Salem: The Story of the San Antonio Four [1]PosterDirected byDeborah Esquenazi [1]Produced by Deborah Esquenazi Sam Tabet[1] Edited by Leah Marino Liz Perlman[1] Music bySam Lipman[1]Productioncompanies Sam Tabet Pictures Motto Pictures Naked Edge Films[2] Distributed by Investigation Discovery FilmRise[1] Release dates April 20, 2016 (2016-04-20) (Tribeca Film Festival) September 12, 20...

 

 

Готфрід СтрасбурзькийGottfried von Straßburg Зображення з Манесського Кодексу. Перша чверть XIV століття.Народився 1165 або 1180Страсбург, Лотарингія,Священна Римська імперіяПомер 1215(1215)Країна НімеччинаДіяльність поетМова творів німецькаРоки активності 12 століття[1] — 13 столітт...

Бурбон Дата створення / заснування 18 століття Країна походження  США  Бурбон у Вікісховищі У Вікіпедії є статті про інші значення цього терміна: Бурбон (значення). Пляшка з-під бурбону 19 століття Бурбо́н (англ. bourbon) — вид віскі, що виготовляється в США. Зміст 1 О...

 

 

Artikel ini membutuhkan rujukan tambahan agar kualitasnya dapat dipastikan. Mohon bantu kami mengembangkan artikel ini dengan cara menambahkan rujukan ke sumber tepercaya. Pernyataan tak bersumber bisa saja dipertentangkan dan dihapus.Cari sumber: Maroo Entertainment – berita · surat kabar · buku · cendekiawan · JSTOR (August 2016) Maroo Entertainment Co., LtdNama asli마루기획 주식회사JenisPublikGenreK-popR&BDidirikan2007PendiriMnet MediaKa...

 

 

هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (سبتمبر 2022) روبي كور   معلومات شخصية الميلاد 4 أكتوبر 1992 (31 سنة)  بنجاب[1]  مواطنة كندا  الديانة سيخية[2][3][4][5]  الحياة العملية المدرسة الأم

American basketball player (born 1989) Colton IversonFree agentPositionCenterPersonal informationBorn (1989-06-29) June 29, 1989 (age 34)Aberdeen, South Dakota, U.S.Listed height7 ft 0 in (2.13 m)Listed weight255 lb (116 kg)Career informationHigh schoolYankton (Yankton, South Dakota)College Minnesota (2008–2011) Colorado State (2012–2013) NBA draft2013: 2nd round, 53rd overall pickSelected by the Indiana PacersPlaying career2013–presentCareer history2013–...

 

 

Struktur kimiawi asam ursodeoksikolat. Asam ursodeoksikolat (bahasa Inggris: ursodeoxycholic acid, ursodiol, UDCA) adalah salah satu jenis asam empedu yang diproduksi oleh bakteri di dalam saluran pencernaan. UDCA menurunkan laju penyerapan kolesterol oleh usus dengan memecahkan misel yang mengandung kolesterol. Oleh karena itu UDCA sering digunakan dalam perawatan penderita batu empedu. Meskipun demikian, paparan kronis UDCA bersifat toksik. Artikel bertopik biokimia ini adalah sebuah ri...

 

 

إذاعة الأغاني منطقة البث مصر، الشرق الأوسط التردد أف أم:القاهرة 105.8 - الإسكندرية 97.6 –الدلتا 89.2-مرسى مطروح 92.6 – الغردقة 98.2 – سفاجا 89.8 – المنيا 104.6 – أسيوط 102 - سوهاج 92.8 – قنا 96.8-نجع حمادي 94.1 تاريخ أول بث 2000 صنف الإذاعة غنائية متخصصة المالك الإذاعة المصرية تعديل مصدري - تعديل ...

  لمعانٍ أخرى، طالع المسيرة الخضراء (توضيح). المسيرة الخضراء المكان أقاليم جنوبية  التاريخ 5 نوفمبر 1975  تاريخ البدء 6 نوفمبر 1975  تاريخ الانتهاء 9 نوفمبر 1975  الإحداثيات 27°39′39″N 11°03′10″W / 27.66089°N 11.052878055556°W / 27.66089; -11.052878055556  تعديل مصدري - تعديل   «...

 

 

Discodorididae Rostanga elandsiaTaksonomiKerajaanAnimaliaFilumMolluscaKelasGastropodaOrdoNudibranchiaUpaordoDoridinaInfraordoDoridoideiSuperfamiliDoridoideaFamiliDiscodorididae Bergh, 1891 Tata namaSinonim takson Diaululinae Bergh, 1891 Geitodorididae Odhner, 1968 Gruveliinae Thiele, 1931 Halgerdinae Odhner, 1926 Kentrodoridinae Bergh, 1891 Platydoridinae Bergh, 1891 Rostangidae Pruvot-Fol, 1951[1] GeneraSee textlbs Discodorididae adalah keluarga taksonomi siput laut, khususnya nudibr...

 

 

American hotel owner, businesswomen, and socialite Anderson about 1890 Margaret Jane Anderson (née, Margaret Jane Boag; May 15, 1859 – September 24, 1930) was an American hotel owner, businesswomen, and socialite,[1] from the U.S. state of Iowa. The widow of Lewis Anderson, she was the owner and developer of two properties in Los Angeles County, California: The Beverly Hills Hotel and the Hollywood Hotel. Biography Margaret Jane Boag was born May 15, 1859 in Cedar, Mahaska Coun...

باب الجبلي الجديدمعلومات عامةنوع المبنى بوابة مدينة المنطقة الإدارية صفاقس البلد  تونس معلومات أخرىالإحداثيات 34°44′14″N 10°45′33″E / 34.737175°N 10.759037°E / 34.737175; 10.759037 تعديل - تعديل مصدري - تعديل ويكي بيانات صورة للباب من الخارج باب الجبلي الجديد، يدعى كذلك باب الجلول...

 

 

Ballot measure in Los Angeles County, California for transportation projects Measure R November 4, 2008 (2008-11-04) County of Los Angeles Sales TaxResults Choice Votes % Yes 2,039,214 67.93% No 962,569 32.07% Los Angeles County Official Results[1] Measure R was a ballot measure during the November 2008 elections in Los Angeles County, California, that proposed a half-cent sales taxes increase on each dollar of taxable sales (originating in or made from Los Angeles Coun...

 

 

Canadian volleyball player Joshua HowatsonPersonal informationNationalityCanadianBorn (1984-10-07) 7 October 1984 (age 39)Height1.99 m (6 ft 6 in)Weight95 kg (209 lb)Spike346 cm (136 in)Block325 cm (128 in)Volleyball informationNumber4Career YearsTeams 2010Team CanadaNational team 2010 Canada Joshua Josh Howatson (born (1984-10-07)7 October 1984) is a Canadian male volleyball player. He was part of the Canada men's national volleyball team at ...

Indra LohaniBorn(1968-04-17)17 April 1968Lakhanpur-8, Jhapa, NepalDied16 January 2009(2009-01-16) (aged 40)Kathmandu, NepalNationalityNepaleseAlma mater Nepal Law Campus (2047) National College of Bangalore Occupations Law Television News Media Employers Nepal Television Kantipur Television OrganizationLegal Research AssociatesKnown forBahas Indra Lohani (Nepali: इन्द्र लोहनी; 17 April 1968 – 16 January 2009) was a prominent Nepalese lawyer, political ta...

 

 

Integrated development environment IntelliJ redirects here. For the company formerly named IntelliJ Software, see JetBrains. This article relies excessively on references to primary sources. Please improve this article by adding secondary or tertiary sources. Find sources: IntelliJ IDEA – news · newspapers · books · scholar · JSTOR (November 2022) (Learn how and when to remove this template message) IntelliJ IDEAIntelliJ IDEA 2021.1 Community EditionDe...

 

 

2021 soundtrack of the film The Suicide Squad This article is about the 2021 standalone sequel soundtrack. For the previous film soundtrack from 2016, see Suicide Squad (soundtrack). The Suicide Squad (Score from the Original Motion Picture Soundtrack)Film score by John MurphyReleasedAugust 6, 2021 (2021-08-06)Recorded2021GenreFilm scoreLength50:58Label Troll Court WaterTower ProducerJohn MurphyJohn Murphy chronology Kick-Ass: Music from the Motion Picture(2010) The Suicide...

Overview of the role and impact of Islam in the Ottoman Empire This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Islam in the Ottoman Empire – news · newspapers · books · scholar · JSTOR (September 2016) (Learn how and when to remove this template message) Part of a series onSunni Islam Beliefs God Prophets an...

 

 

United States Navy submarine base Naval Base Coco SoloCativá, Panama Aerial view of the U.S. Naval Station Coco Solo in 1941TypeNaval baseSite informationControlled by United States NavySite historyIn use1918–1999 O-class submarines at Coco Solo in 1923. Coco Solo was a United States Navy submarine base and naval air station near the Panama Canal, active from 1918 to the 1960s. History The submarine base at Coco Solo was established May 6, 1918.[1] The site correspon...

 

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!