This article needs to be updated. Please help update this article to reflect recent events or newly available information.(March 2024)
The Renewables Obligation (RO)[1] is a market support mechanism designed to encourage generation of electricity from eligible renewable sources in the United Kingdom. There are three related schemes for the three legal jurisdictions of the UK. In April 2002 the Renewables Obligation was introduced in England and Wales, and in Scotland as the Renewables Obligation (Scotland). The RO was later introduced in Northern Ireland in April 2005. In all cases, the RO replaced the Non-Fossil Fuel Obligation which operated from 1990.[2]
The RO placed an obligation on licensed electricity suppliers in the United Kingdom to source an increasing proportion of electricity from renewable sources, similar to a renewable portfolio standard. This figure was initially set at 3% for the period 2002/03, and in 2010/11 it was 11.1% (4.0% in Northern Ireland). By 2020 it was almost half of all electricity in England, Wales and Scotland, and nearly 20% in Northern Ireland. An extension of the scheme from 2027 to 2037 was declared on 1 April 2010 and is detailed in the National Renewable Energy Action Plan.[3]
The RO closed to new generation between March 2015 and March 2017, with some grace periods.[4] It was replaced by the Contracts for Difference scheme.[5] Accredited generating stations will continue to receive 20 years of support, until March 2037.
Implementation
Suppliers meet their obligations by presenting Renewable Obligation Certificates (ROCs) to Ofgem. Where suppliers do not have sufficient ROCs to cover their obligation, a payment is made into the buy-out fund. The buy-out price suppliers pay is a fixed price per MWh shortfall and is adjusted in line with the Retail Prices Index each year. The proceeds of the buy-out fund are paid back to suppliers in proportion to how many ROCs they have presented. For example, if they were to submit 5% of the total number of ROCs submitted they would receive 5% of the total funds that defaulting supply companies pay into the buy-out fund.
ROCs are intended to create a market, and be traded at market prices that differ from the official buy-out price. If there was an excess of renewable production beyond the supplier obligation, the price of ROCs would fall below the buy-out price. The price of ROCs could approach zero if renewable and non-renewable generation costs became similar, when there would be little or no subsidy of renewable generation. If there is less renewable production than the obligation, the price of ROCs would increase above the buy-out price, as purchasers anticipate later payments from the buy-out fund on each ROC.[6]
Obligation periods run for one year, beginning on 1 April and running to 31 March. Supply companies have until the 31 August following the period to submit sufficient ROCs to cover their obligation, or to submit sufficient payment to the buy-out fund to cover the shortfall.
The cost of ROCs is effectively paid by electricity customers of supply companies that fail to present sufficient ROCs, whilst reducing the cost to customers of supply companies who submit large numbers of ROCs, assuming that all costs and savings are passed on to customers.
Percentages and prices by year
The percentage of electricity to be supplied by renewable electricity under the scheme generally increased each year. This is set separately for Great Britain (England and Wales plus Scotland) and for Northern Ireland.
A ROC is the green certificate issued for eligible renewable electricity generated within the United Kingdom and supplied to customers in the United Kingdom by a licensed supplier. ROCs are issued by Ofgem to accredited renewable generators (or in the case of generating stations subject to a NFFO (non-fossil fuels obligation), Scottish Renewables Obligation or Northern Ireland NFFO contract, to the nominated electricity supplier). The Scottish Renewables Obligation was superseded by the Renewables Obligation (Scotland) in 2002.
The default is that one ROC is issued for each megawatt-hour (MWh) of eligible renewable output. Some technologies get more, some less. For instance, offshore wind installations receive 2 ROCs per MWh;[18]onshore wind installations receive 0.9 ROCs per MWh and sewage gas-fired plants receive half a ROC per MWh.
ROCs are issued into the ROC Register and so are electronic certificates. Normally, a renewable generator will transfer the related ROCs through Ofgem's electronic registry when it sells power to an electricity supplier.
Legislation
The Utilities Act 2000 gives the Secretary of State the power to require electricity suppliers to supply a certain proportion of their total sales in the United Kingdom from electricity generated from renewable sources. A Renewables Obligation Order is issued annually detailing the precise level of the obligation for the coming year-long period of obligation and the level of the buy-out price. The Renewables Obligation (England and Wales) was introduced by the Department of Trade and Industry, the Renewables Obligation (Scotland) was introduced by the Scottish Executives and the Northern Ireland Renewables Obligation was introduced by the Department of Enterprise Trade and Investment (DETINI). The Orders were subject to review in 2005/06 and new Orders came into effect on 1 April 2006. The relevant pieces of legislation for the period April 2006 – March 2007 are:
The Renewables Obligation Order 2006 (Statutory Instrument (SI) 2006 No. 1004)
The Renewables Obligation (Scotland) Order 2006 (SI 2006 No. 173), and
The Renewables Obligation Order (Northern Ireland) 2006 (SI 2006 No. 56).
All pieces of legislation are published on the National Archives legislation site.[19]
Ofgem's role
Ofgem is the Office of Gas and Electricity Markets in Great Britain. The Orders detail Ofgem's powers and functions to administer the Renewables Obligation. These functions include:
Accrediting generating stations as being capable of generating electricity from eligible renewable sources
Issuing ROCs and revoking these as necessary
Establishing and maintaining a Register of ROCs
Monitoring compliance with the requirements of the Orders
Calculating annually the buy-out price
Receiving buy-out payments and redistributing the buy-out fund
Receiving late payments and redistributing the late payment fund, and
Publishing an annual report on the operation of and compliance with the requirements of the Orders.
Co-firing of biomass is also eligible. Not all technologies which are eligible are actually supported, due to cost. Some renewable sources of electricity are not eligible for ROCs (e.g. larger hydroelectric schemes which were in operation before April 2002).
Banding
The Renewables Obligation represents the UK Government's main policy measure for stimulating the growth of electricity generation from renewable sources.[20] The Government envisages that 30% of electricity demand will need to be generated by renewable sources[21] in order for the UK to meet a legally binding EU target of obtaining 15% of energy from renewable sources by 2020.
The Renewables Obligation is a market-based mechanism designed to incentivise the generation of electricity from renewable energy sources over more traditional alternatives at a reasonable cost.
When it was first introduced in 2002, each form of renewable energy technology received the same level of support, namely one ROC/MWh of electricity generated. This was a conscious decision as the Government was keen to promote a market-led approach, emphasising competition between technologies to minimise cost, and did not want to distort the market by appearing to place the importance of certain technologies above others.[22]
As a result, whilst being ostensibly technology-neutral, the Renewables Obligation in its original form in fact favoured the deployment of the more established, near-market technologies such as landfill gas and onshore wind, those which were most economically efficient, over less well developed technologies that were further from commercial viability.[23]
A review of the performance of the Renewables Obligation was announced in 2003. Modelling of future deployment scenarios indicated that targets would not be met with current levels of support due to constraints on the availability and deployment of the most established technologies. A significant contribution would therefore be required from less mature technologies which lacked sufficient incentive to develop into feasible alternatives under the original scheme.[24]
The Government announced its intention to reform the Renewables Obligation in 2006. Banding was introduced in 2009 to provide differing levels of support to groups of technologies depending upon their relative maturity, development cost and associated risk.[20] Whilst increasing the incentive for technologies in the early stages of development this also allowed the level of support for well established technologies to be reduced to avoid over-subsidisation.
In reforming the Renewables Obligation in this way, and scheduling regular future reviews, the Government recognised that the market would not deliver the mix of renewable energy generation required to meet the targets if the incentives remained technology-neutral. It was therefore necessary for the Government to perform a continuing strategic role and retain the capability to intervene if necessary.[25] The introduction of banding allowed the Government to steer industry towards investment in less well developed forms of renewable energy to enable them to contribute to meeting the long-term targets, rather than concentrating investment in technologies that are economically favourable in the short-term.
The Government has reviewed the banding levels for appropriate incentives for the period 2013–2017. These bands include a reduction in the tariff for onshore wind to 0.9 ROCs/MWh and an increase for small wave and tidal stream projects, under 30 MW, to 5 ROCs/MWh.[26]
The obligation was reviewed by government[27] following a consultation period that finished in September 2007. The document at the centre of the consultation set out an amended form of the RO which will see different technologies earn different numbers of ROCs. This has not yet been adopted as policy.
On 22 January 2007, Ofgem called for the Renewables Obligation to be replaced, claiming that the scheme is a 'very costly way' of supporting renewable electricity generation.[28] In particular they are concerned that electricity customers pay for renewables projects even if they are not built due to problems obtaining planning permission, and the failure of the Renewables Obligation to link financial support for renewables to either the electricity price or the price of renewables in the European Union Emissions Trading Scheme.
The British Wind Energy Association, whose members are major beneficiaries of the existing scheme, claims that Ofgem is partly responsible for the costs because it has failed to prioritise work on the National Grid which would allow more renewable capacity to be connected. They also stressed the need to maintain stability in the marketplace to maintain the confidence of investors.[29]
The Scottish Wind Assessment Project has criticised the scheme for rewarding reductions in renewable electricity output: two electricity suppliers, Scottish and Southern Energy and Npower, down-rated several large hydro-power stations in order to qualify for Renewables Obligation Certificates.[31]
The UK Government proposed wide-ranging reforms to the UK electricity market which saw feed-in tariffs with contracts for difference (CfD) replace the Renewables Obligation as the main renewable generation support mechanism.[32] Unlike ROCs, CfDs will also be available to generators of nuclear electricity.
Other than with respect to large scale (>5MW) solar photovoltaic power projects and onshore wind power projects, the Renewables Obligation remained open to new generation until 31 March 2017, allowing new renewable generation that comes online between 2014 (when it was anticipated the CfDs would start) and 2017 to choose between CfDs and ROCs. After that date, the government intended to close the Renewables Obligation to new generation while continuing existing ROCs, meaning that levels and length of support for existing participants in the Renewables Obligation would be maintained.
However, the UK government subsequently announced that it would bring forward the deadline for Renewables Obligation accreditation for large scale (>5MW) solar photovoltaic power projects, to 1 April 2015.[33] The government further announced on 18 June 2015 that it intended to close the Renewables Obligation to new onshore wind power projects on 1 April 2016, bringing the deadline forward by one year.[34]
Renewables Obligation closure dates and grace periods
The RO schemes closed to new generation as follows.[4]
England and Wales and Scotland:
All, except solar PV and onshore wind: 31 March 2017
Onshore wind: 12 May 2016
Solar PV ≤ 5 MW: 31 March 2016
Solar PV > 5 MW: 31 March 2015
Northern Ireland:
All, except onshore wind: 31 March 2017
Onshore wind ≤ 5 MW: 30 June 2016
Onshore wind > 5 MW: 31 March 2016
A series of grace periods were set out, where generating stations could be accredited after the closure date, subject to meeting the following criteria. The first three applied until 31 March 2018, with the latter three until 30 September 2018.[35]
Connection delays caused by grid and/or radar.
Where signed investment contracts were terminated under specific circumstances.
Where offshore wind or ACT projects could demonstrate evidence of substantial financial decisions and investments made before 9 November 2014.
Projects allocated a place within the 400 MW dedicated biomass cap.
Scottish offshore wind using test and demonstration or floating wind turbines.
Where biomass with CHP projects could demonstrate evidence of substantial financial decisions and investments made before 9 November 2014.
^ abDTI. (2007). ‘Reform of the Renewables Obligation’, May 2007
^DECC. (2010). ‘National Renewable Energy Action Plan for the United Kingdom’
^Wood, G. and Dow, S. (2011). ‘What lessons have been learned in reforming the Renewables Obligation? An analysis of internal and external failures in UK renewable energy policy’, Energy Policy, 39(5), 2228–2244.
^Foxon, T.J. and Pearson, P.J.G. (2007). ‘Towards improved policy processes for promoting innovation in renewable electricity technologies in the UK’, Energy Policy, 35(3), 1539–1550.
^Wood, G. and Dow, S. (2010). ‘The likely impact of reforming the Renewables Obligation on renewables targets’, International Journal of Energy Sector Management, 4(2), 273–301.
^Woodman, B. and Mitchell, C. (2011). ‘Learning from experience? The development of the Renewables Obligation in England and Wales 2002–2010’, Energy Policy, 39(7), 3914–3921.
Companies with headquarters and/or registered office in the UK but no applicable energy operations within the country shown in italics1Ultimate parent company is not UK-based 2Integrated in the United States, no generation or supply activities in the UK
هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (يونيو 2019) ماري بيث ليونارد معلومات شخصية الميلاد سنة 1962 (العمر 60–61 سنة) مواطنة الولايات المتحدة مناصب سفير الولايات المتحدة لدى مالي[1][2] في الم
2019 statement by Ali KhameneiThe supreme leader of Iran, Ali Khamenei, who issued the 8-Article command to the chiefs of branches Khamenei's 8-Article command to the chiefs of branches (Persian: فرمان هشتمادهای خامنهای به سران قوا)[1][2][3] is considered as a historical headline in Iran in regards to fighting economic corruption in the country; which was issued on 30 April 2001[4] by the command of Iran's supreme leader, ...
ДостопримечательностьЦерковь Святой Феодосии 41°01′37″ с. ш. 28°57′22″ в. д.HGЯO Страна Турция Местоположение Стамбул Конфессия ислам Тип здания православная церковь (до 29 мая 1453 года), мечеть (с 1490 года) Архитектурный стиль архитектура Византии Материал кирпич &...
1st episode of the 1st season of The Avengers Hot SnowThe Avengers episodeScreen titleEpisode no.Season 1Episode 1Directed byDon LeaverWritten byRay Rigby based on a story by Patrick BrawnProduced byLeonard WhiteFeatured musicJohn Dankworth (theme)Production code3365[1]Original air date7 January 1961 (1961-01-07)Guest appearances Catherine Woodville Philip Stone Robert James Godfrey Quigley Moira Redmond Murray Melvin Charles Wade Episode chronology ← Previo...
FORUM Schwanthalerhöhe Haupteingang des Einkaufszentrums Basisdaten Standort: München-Schwanthalerhöhe Eröffnung: 6. Juni 2019 Gesamtfläche: ca. 40.000 m² Geschäfte: 90 Website: www.forum-schwanthalerhöhe.de Technische Daten Baukosten: 240 Mio. € Lage des Einkaufszentrums Koordinaten: 48° 8′ 12″ N, 11° 32′ 51,5″ O48.1366711.54764Koordinaten: 48° 8′ 12″ N, 11° 32′ 51,5″ O Forum Schwanthalerhöhe (Bayern) ...
American politician For other people with the same name, see Thomas Flaherty (disambiguation). This article was imported from the Biographical Directory of the United States Congress. Please help improve this article. Thomas Aloysius FlahertyMember of the U.S. House of Representativesfrom Massachusetts's 11th districtIn officeDecember 14, 1937 – January 3, 1943Preceded byJohn Patrick HigginsSucceeded byJames Michael CurleyMember of theMassachusetts House of RepresentativesSecond...
1956 American historical drama film directed by Anatole Litvak This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Anastasia 1956 film – news · newspapers · books · scholar · JSTOR (January 2013) (Learn how and when to remove this template message) AnastasiaTheatrical release posterDirected byAnatole Litvak...
Trois Muses (MNA 215) De gauche à droite : Apollon, un serviteur et Marsyas (MNA 216) Trois Muses (MNA 217) La base de Mantinée est un ensemble de trois plaques sculptées en bas-relief représentant pour l'une, Apollon, Marsyas et un silène, et pour chacune des deux autres, un groupe de trois Muses. Elles ont été découvertes en 1887 à l'emplacement de l'ancienne cité grecque de Mantinée, en Arcadie, et constituent probablement la décoration d'une base de statue&...
التهاب السحايا والدماغ السحاياالسحايا معلومات عامة الاختصاص طب الجهاز العصبي من أنواع أمراض الجهاز العصبي المركزي، والتهاب السحايا، والتهاب الدماغ، ومرض تعديل مصدري - تعديل التهاب السحايا والدماغ[1][2][3] (بالإنجليزية: Meningoencephalitis) هوَ مرض ...
Birangona: Women of WarPromotional posterWritten byLeesa GaziSamina LutfaDate premiered1 March 2014 (2014-03-01) Birangona: Women of War is a British one-act play by Leesa Gazi about the untold true stories of female survivors and sufferers, Birangona, of the Bangladesh Liberation War, during which over 200,000 women were raped and tortured. The theatrical production is dedicated to narrating the stories of war heroines from their perspective. Cast Leesa Gazi as Moroyom Amith R...
Jean Zay Información personalNacimiento 6 de agosto de 1904 Orleans (Francia) Fallecimiento 20 de junio de 1944 (39 años)Molles (Francia) Causa de muerte Herida por arma de fuego Sepultura Panteón de París y Gran cementerio de Orleans Nacionalidad FrancesaLengua materna Francés EducaciónEducado en Lycée Pothier Información profesionalOcupación Político, abogado y miembro de la Resistencia francesa Cargos ocupados Consejero general por canton d'Orléans-Nord-Est (fr)Diputado francés...
French footballer (born 2000) Yacine Adli Adli with Bordeaux in 2020Personal informationFull name Yacine Adli[1]Date of birth (2000-07-29) 29 July 2000 (age 23)Place of birth Vitry-sur-Seine, FranceHeight 1.86 m (6 ft 1 in)[2]Position(s) Attacking midfielder[3]Team informationCurrent team AC MilanNumber 7Youth career2006–2013 US Villejuif2013–2018 Paris Saint-GermainSenior career*Years Team Apps (Gls)2017–2019 Paris Saint-Germain B 20 (4)2018...
English swimmer Not to be confused with Anna Hopkins. Anna HopkinMBEAnna Hopkin, in an interview in 2017Personal informationBorn (1996-04-24) 24 April 1996 (age 27)Chorley, Lancashire, EnglandHeight1.65 m (5 ft 5 in)SportSportSwimmingStrokesFreestyleCollege teamUniversity of Arkansas (U.S.) Medal record Women's swimming Representing Great Britain Olympic Games 2020 Tokyo 4×100 m mixed medley World Championships (LC) 2023 Fukuoka 4×100 m mixed freestyle World Champi...
This article uses bare URLs, which are uninformative and vulnerable to link rot. Please consider converting them to full citations to ensure the article remains verifiable and maintains a consistent citation style. Several templates and tools are available to assist in formatting, such as reFill (documentation) and Citation bot (documentation). (August 2022) (Learn how and when to remove this template message) This biography of a living person needs additional citations for verification. Plea...
Historic Hotel Hotel Del PortalHotel Del Portal, El Portal California, by George Fiske.General informationLocationEl Portal, California, United StatesCoordinates37°40′29″N 119°47′03″W / 37.67472°N 119.78417°W / 37.67472; -119.78417Opening1908ManagementYosemite Valley RailroadTechnical detailsFloor count4Other informationNumber of rooms130 Hotel Del Portal was one of the early first-class hotels established by the Yosemite Valley Railroad to take passengers ...
American football player (1924–2011) Not to be confused with Jim Keane (politician). American football player Jim KeaneNo. 20, 81Position:E / DEPersonal informationBorn:(1924-01-11)January 11, 1924Bellaire, Ohio, U.S.Died:March 8, 2011(2011-03-08) (aged 87)Lake Forest, Illinois, U.S.Career informationHigh school:Linsly Military Institute(Wheeling, West Virginia)College:NorthwesternIowaNFL Draft:1945 / Round: 18 / Pick: 182Career history Chicago Bears (1946–1951) G...
1947 French film This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Monsieur Vincent – news · newspapers · books · scholar · JSTOR (June 2019) (Learn how and when to remove this template message) Monsieur VincentCover of the Timeless Multimedia VHS editionDirected byMaurice ClocheWritten byJean AnouilhJean Bern...
Comedy Central-branded channel Television channel Comedy Central FamilyCountryHungaryBroadcast areaHungaryNetworkComedy CentralProgrammingPicture format576i 16:9 (SDTV)OwnershipOwnerParamount International NetworksSister channelsMTV, VH1, Nickelodeon, Nick Jr., Comedy Central, NickToons, Paramount Network, TeenNickHistoryLaunched3 October 2017; 6 years ago (2017-10-03)ReplacedVIVAComedy Central Extra Comedy Central Family is a Hungarian television channel launched on October...