The total length of the overhead, underground and ramp roads of the interchange is approximately 14 km and it features eight flyovers.[1]
The construction of interchange started in May 2014 along with the construction of Rawalpindi-Islamabad Metrobus, but took longer to complete than anticipated. It costed almost Rs. 6 billion (60 million USD) to get completed by March 2016.
Etymology
Peshawar Morr used to be at the helm of a road leading to Peshawar since not much existed after it during the early times of Islamabad. Back then, it was a well-known stop for wagons and buses travelling to Peshawar from Islamabad and vice versa.[3]