The Trillium Line (French: Ligne Trillium), also called O-Train Line 2 (French: Ligne 2 de l'O-Train),[4] is a diesel light rail transit (DLRT) service, using main line trains.[5] The line is in Ottawa, Ontario, Canada, and is operated by OC Transpo.[6][7][8]
Part of the O-Train urban rail system, the line runs north–south for 19 kilometres (12 mi) between Bayview and Limebank. The line is a single track, with three passing sidings on dedicated rights-of-way shared with Ottawa Central freight trains south of Walkley Yard, which occasionally serve the National Research Council of Canada's Automotive and Surface Transportation Research Centre. Despite being a local public transit line, it is actually a federally regulated mainline railway and operated under the official name "Capital Railway", which appears on the trains in addition to the service's logo.[9] Much of the line is single-tracked, but with the completion of Stage 2 upgrades, many sections are double-tracked with dual platforms.
Between 2013 and 2015, the line was upgraded and its fleet replaced, cutting wait times during peak periods from 15 minutes to 12 minutes.[10]
On May 3, 2020, the line was shut down for an upgrade and expansion project, which added eight stations and 16 kilometres (10 mi) of track, including a spur to Macdonald–Cartier International Airport named Line 4, also known as the Airport Link. The project was originally expected to be complete by September 2022 but was delayed several times.[11][12][13][14][15] The line reopened on January 6, 2025, beginning with a 5-day service week, which will gradually transition to a 6-day and finally a full 7-day service week in future phases.[16]
History
Pilot project
The Trillium Line was introduced on October 15, 2001, as a pilot project to provide an alternative to the Transitwaybus rapid transit on which Ottawa had long depended exclusively for its high-grade transit service. The single-track line operated with five stations and a single passing loop at Carleton station.
As a pilot project, the Trillium Line system was built at the cost of CA$21million, relatively little compared with the hundreds of millions of dollars usually required to build a new transit line. It runs on an existing Canadian Pacific Railway track (Ellwood and Prescott subdivisions of Bytown and Prescott Railway[17]), so the only construction work necessary was to build the stations themselves and the passing tracks necessary to allow trains to operate in both directions.
From 2001 until 2015,[18] the system used three diesel-powered BombardierTalent BR643low-floordiesel multiple unit trains. It was, however, described as "light rail", partly because plans called for it to be extended into Ottawa's downtown as a tramway-like service, and partly because the Talent vehicles, though designed for mainline railways in Europe, are much smaller and lighter than most mainline trains in North America, and do not meet the Association of American Railroads' standards for crash strength. Ottawa is also authorized to run trains with only a single operator and no other crew, something rare on mainline railways in North America.
Until late 2014, the official name of the diesel-powered, north–south line was "O-Train". After construction started on a second, east–west urban rail line (the Confederation Line), the O-Train name was applied to the entire system, and the north–south line was renamed the "Trillium Line".[19]
Original service
Ticketing on the Trillium Line originally worked entirely on a proof-of-payment basis; there were no ticket barriers or turnstiles, and the driver did not check fares. Occasionally, OC Transpo Special Constables or other employees prompted passengers for proof-of-payment. Tickets can be purchased from a vending machine on the platform, and certain bus passes are also valid for the Trillium Line. Trillium Line tickets were exchanged for bus transfers upon boarding a bus. Although bus transfers can be used to board the O-Train, prepaid bus tickets cannot.
The European trains are narrower than the North American standard. In order to enable night-time use of the line by standard-width freight services, retractable platform extenders are mounted at each station (other than Bayview which is constructed on its own private rail spur). Passengers gain access to the Trillium Line on these extenders. If the line is used for freight, the extenders are retracted allowing a wider train to pass through the station. The extender interface with the train has been refined over time, and cyclists and wheelchair users now have no trouble accessing the train.
The service frequency of a train every fifteen minutes made it possible to run the line with a fleet of just three trains (of which only two were in service at any given time) and a single track, apart from passing sidings at Carleton station.
The Trillium Line hit the 1-millionth rider mark on May 29, 2002, the 5-millionth mark on January 21, 2005, and the 10-millionth in late 2010.[20] In mid-2011, the Trillium Line carried an average of approximately 12,000 riders each day.[21]
On January 16, 2003, the Ontario chapter of the American Public Works Association (APWA) presented the City of Ottawa, Canadian Pacific Railway and Morrison Hershfield with the APWA Public Works Project of the Year award in the transportation category. This award was established to highlight excellence in the management and administration of public works projects by recognizing the alliance between the managing agency, the consultant and the contractors who, working together, complete public works projects.[23]
A third award the Trillium Line Light Rail transit project received was in May 2003, in the sustainable transportation category of the FCM-CH2M Hill Sustainable Community Awards.[22]
Criticism of pilot project
The main complaints about the Trillium Line pilot have revolved around its placement and ridership levels. The Trillium Line's route was determined by existing railway tracks, rather than the parts of the city that needed public transport, which would have required new tracks to be laid. Carleton University students, however, benefited from the Trillium Line pilot project, as it connected the university to the busy Ottawa Transitway system.
The other criticism is that there is very low ridership of the trains compared to some very crowded bus lines such as the 90–99 series routes. One fully loaded Trillium Line train carries 285 passengers compared to 131 passengers for an articulated bus.[24] The O-Train schedule is limited by track capacity.
In July 2006, Ottawa City Council approved a north–south light rail expansion project. The project would have terminated diesel light rail service on the Trillium Line so as to reuse its right-of-way for a double-track, electric light rail line that would have extended west from the University of Ottawa to Bayview then south to Leitrim and then west to Barrhaven. However, in December 2006, Ottawa City Council cancelled this project, thus leaving the diesel-powered Trillium Line unchanged.
Service improvements
On May 18, 2011, OC Transpo approved a $200,000 study to expand the Trillium Line. The $59-million proposal included the purchase of six new trainsets and track improvements that would decrease headways from 15 minutes to 8 minutes.[21] The project would finally cost $60.3million.[10]
In mid-2013, service on the Trillium Line was suspended for four months to implement service and track improvements such as new station platforms and two new passing tracks (near Brookfield and Gladstone).[10][25] Upgrades were also made to the signal system, train controls, stations, tracks and train yard. A new centralized traffic control system was installed to improve safety and efficiency.[10] Six new Alstom Coradia LINT 41 trainsets (replacing the three older Bombardier Talent units) and the two extra passing loops allowed the number of trains on the line to double to four.
Expanded service began on March 2, 2015, but suffered numerous problems during the first week.[18] Although the changes were intended to improve frequency to eight minutes, the Trillium Line would ultimately operate at twelve minute frequency.[26] After the completion of the Stage 2 project, the line was originally planned to continue operating using single-car trains; however, because of the lower-than-intended frequency, the city was forced to adjust the Stage 2 plan to include longer trains and platforms to compensate.[27]
Derailment
On August 11, 2014, train C3 derailed while traveling northbound over the switch just south of Carleton station.[28] The cause was determined to be a faulty spring switch that had not closed properly as well as the operator failing to follow regulations and physically inspect the switch after spotting a signal irregularity. No serious injuries occurred as a result of the derailment; however, train C3 received damage and was taken out of service. C3 was never repaired and never returned to service[29] and as a result the line continued to operate with only two operational trains until the following March when the new Alstom LINT trains entered service. In June 2017, the spring switches at Carleton were replaced with powered switches.[30]
Stage 2 expansion
As part of the city's Stage 2 LRT project, the Trillium Line has been extended 16 kilometres (9.9 mi) in the south, including Line 4, a 4-kilometre (2.5 mi) branch to Macdonald–Cartier International Airport and the EY Centre, with four new stations at South Keys, Leitrim, Bowesville and Limebank in Riverside South and full grade separation along the extended tracks. The project added a new pocket track, passing track and crossover tracks at South Keys station, and the tracks from the Leitrim Road overpass to Limebank station were double-tracked. In addition, two more stations were built along the existing portion of the line at Gladstone and Walkley.[31] The project also included a number of other significant upgrades including the lengthening of all existing passing tracks, the purchase of seven new trains, the doubling in length of all existing platforms, the grade separation of the Ellwood diamond to allow Via trains to cross underneath the Trillium Line, the rehabilitation of rail bridges over the Rideau River and of the Dow's Lake rail tunnel, the upgrading of the signalling system to allow the implementation of positive train control, the construction of several new pedestrian tunnels and overpasses, and numerous guideway and vehicle rehabilitation projects.[32] The contract for the project was approved on March 7, 2019, by city council,[33] with construction of the airport spur beginning in mid-2019. The project was expected to be completed by the fourth quarter of 2022 but was delayed initially to October 2023,[14] then to April 2024,[12] then to mid-2024.[11] On December 6, 2024, an opening date was announced, with revenue service beginning January 6, 2025.[16][34]
The 4-kilometre (2.5 mi) Line 4 runs from Macdonald–Cartier International Airport north to South Keys station, where riders will need to change trains to continue to Bayview station.[35] South Keys station features an island platform to facilitate cross-platform transfers for passengers arriving from the airport branch to trains bound for Bayview station. The spur's funding came from the federal and provincial governments, as well as the airport authority, instead of from the city itself.[36]
On February 22, 2019, the city announced that the selected proponent to construct the project was TransitNEXT, a wholly owned subsidiary of SNC-Lavalin.[37][38] This decision was controversial as the federal government and SNC-Lavalin were involved in a political scandal at the time, which led to extra scrutiny by city councillors, with some calling for a delay on the vote to approve the contract in order to allow more time for review. Ultimately Council voted not to delay the approval and the contract was approved on March 7, 2019.[33] It was later revealed that TransitNEXT's bid had not met the minimum technical scoring threshold in order to be considered, which continued the controversy.[39] The city eventually explained that the decision to award the contract to TransitNEXT was done at the discretion of city staff to get a better deal for the city and was within the rules of the procurement process.[40] An investigation conducted by the city's auditor general later confirmed that the authority delegated by council gave city staff sole discretion on whether to allow a bid to proceed even if it had not met the minimum scoring threshold, and that staff had otherwise correctly followed the entire procurement process that had been approved by council.[41]
Work on the Stage 2 extension began in mid-2019, starting with the clear-cutting of trees along the corridors used by the extension. Construction of the airport spur was expected to be completed in 2020 to give the airport authority time to rebuild the terminal and connect it to the future station.[42][43][needs update]
On May 26, 2023, the Light Rail Transit Sub-Committee received an update on the progress of construction for Lines 2 and 4, noting that construction was going well and that handover of the system to the city was expected in approximately the first or second week of October 2023, though that may shift earlier or later pending the results of operational testing across both lines.[44] Michael Morgan, the director of rail construction, reaffirmed that all signs were pointing to Lines 2 and 4 beginning revenue service by the end of 2023 and stated that Line 4 would likely be the first of the two branches to open to the public. It was also revealed that, due to lessons learned from the launch of the Line 1 Confederation Line in late 2019, parallel bus service would be retained across both lines through the end of the first winter they were in operation, so as to mitigate unforeseen disruptions caused by any remaining unexpected events related to the construction.[45]
Final testing of the line began in October 2024, with successful completion of trial running by October 31.[46]
Future extensions
Extending the Trillium Line across the Ottawa River into Gatineau across the Chief William Commanda Bridge had been proposed as early as the original pilot project proposal. The city's certificate of fitness for the Trillium Line, issued by the Canadian Transportation Authority in 2001, indicates that it operates between the provinces of Ontario and Quebec, despite the line never having actually operated across the river.[47] The city even considered converting the rail bridge into a pedestrian crossing at one point.[48] When the city announced the contract awards for Stage 2, it also presented a map of the O-Train network that included proposed extensions that would be a part of a Stage 3 phase, including extensions to Kanata, Barrhaven, and Gatineau.[49] On September 24, 2019, the cities of Ottawa and Gatineau jointly announced that they no longer intended to use the Chief William Commanda Bridge for any kind of rail connection, citing capacity concerns at Bayview station.[50] The bridge was later opened in September 2023 as a multi-use pedestrian pathway.[51]
As of 2019[update], ticket barriers are installed and operational in all Line 2 stations. They were initially installed in all stations except for Bayview in order to test the hardware and software of the fare gate system before it was installed in all thirteen stations on Line 1.
The Trillium Line stations have large, bus-style sheltered waiting areas for passengers. All stations have level boarding platforms to allow for wheelchairaccess and easier boarding for all passengers. Elevators are available at Greenboro (for Transitway riders), Dow's Lake (for Line 2 riders) and Bayview (for train transfers within the fare-paid zone).
The northbound terminus for the Trillium Line, this bilevel station provides an interchange with the Confederation Line (Line 1) in a fare-paid zone and direct access to rapid, frequent and local bus routes on the north side of Albert Street. Bus routes on the south side of Albert Street near Tom Brown Arena are accessed via a multi-use pathway which runs alongside and under Albert to connect with the station's first level. Two public washrooms are located next to the Trillium Line waiting area on the first level.[52] The station is located on a stub-end track branching off from the railway line, immediately under the Albert Street overpass. It is the closest Trillium Line station to downtown Ottawa.
Located in Little Italy, near Gladstone Avenue. The station features two platforms on a double track extending from approximately the Beech Street pedestrian bridge all the way to the terminus at Bayview station.[31] The station building is being structurally engineered to support upward, mixed-use expansion in the future. A passing loop was added in 2013 to increase train frequency and line capacity.[25] Originally planned to be part of the pilot project but was cut for budgetary reasons before being added in the Stage 2 South extension.[53]
Located at Carling Avenue and Preston Street, just north of Dow's Lake. The station is currently single-tracked despite the Stage 2 South expansion; however, the City of Ottawa has maintained that double-tracking this station is still a long-term option, as well as connecting the station directly to either or both the new Civic Hospital Campus of the Ottawa Hospital or a potential future station servicing the new hospital campus specifically. South of this station, the train enters a tunnel to pass under Dow's Lake.
Serves Carleton University and has separate tracks and platforms for each direction. Until the upgrade of the line in 2013, this station had the only passing loop along the line.
Originally known as "Confederation" after the Confederation Heights area (Heron and Bronson intersection), the station was renamed on December 24, 2017, to avoid confusion with the Confederation Line.[54] It serves Government of Canada offices in the surrounding area, including Canada Post. Following the Stage 2 South expansion, the station platform was doubled in length in order to accommodate the longer Stadler FLIRT train sets. The Government of Canada is currently in the process of planning a major redevelopment of nearby buildings into a modern, mixed-use community.
Originally planned to be part of the pilot project but was cut for budgetary reasons before being added in the Stage 2 South expansion.[53] A passing loop was added in 2013 just north of Walkley to increase train frequency and line capacity.[25] It is the site of a future Stage 2 South station immediately south of Walkley Road and just east of the existing Transitway station.[31] Despite being single-tracked, the City of Ottawa has maintained that double-tracking the station is in its long-term plans.
Provides an interchange with a large Transitway station, which has a large park-and-ride lot and is located next to the South Keys Shopping Centre. The Trillium Line platform is level with the pedestrian overpass crossing the Transitway. This is also the only Trillium Line station, prior to the completion of the Line 2 South expansion, to include a fare-paid transfer zone.
An interchange station, with a cross-transfer between Line 2 and Line 4 (Airport Link) and a path connecting to the existing Transitway station. This is an island-platform station in the middle of a double-tracked segment and includes a pocket track just north of the station for storing a train set on layup. The Line 4 trains are projected to arrive and depart in sync with the Line 2 trains.
Adjacent to the existing bus station and park-and-ride lot. The station features two platforms, an expanded park-and-ride lot, and a reconstructed bus operators' building and bus loop intended to facilitate increased service and easier transfer connections between urban rail and bus.
Located just east of Bowesville Road. This station features two platforms and a new park-and-ride lot, which will have the ability to be expanded in the future.
The Trillium Line initially used three Bombardier Talent diesel multiple unit (DMU) trains for service. Each train (numbered C1–C3)[29] consisted of three cars, with the front and rear powered and the centre towed. The trains were originally ordered by Deutsche Bahn and later delivered to OC Transpo. After being retired in 2015, the units were put up for auction multiple times[55][29] but a deal to sell the vehicles was never successfully established. They are now slated to be scrapped.[56]
In September 2011, Alstom announced that it would deliver six new two-car Coradia LINT train sets in 2013;[57] the trains were handed over to OC Transpo in June 2013.[58] These trains were put into service on March 2, 2015, and the Bombardier Talent units were subsequently retired.[59]
On May 3, 2018, it was announced that the city would be purchasing seven new Stadler FLIRT trains to use on the extended Trillium Line after the completion of Stage 2.[60] These trains are approximately 80 metres (262 ft) long, which is double the 41-metre (135 ft) length of the current Coradia LINT trains. The new trains operate alongside coupled pairs of the existing LINT trains on the main line as part of a mixed fleet. These vehicles were manufactured in Switzerland before being transported to Canada for final assembly.[61] The trains have a diesel-electric drive with the possibility of future electrification. The first FLIRT vehicle was delivered on October 7, 2021,[62] and began testing on the weekend of January 15, 2022.[63]
7 four-car sets (28 cars total, not including power packs)
2021
Trillium Line (from 2025)
Facilities
Train sets are stored at the Walkley Yard located northeast of the Greenboro station. Before their retirement, the Bombardier Talent trainsets were maintained by Bombardier Transportation at the Walkley facilities. Bombardier continues to perform maintenance of the Trillium Line fleet, which included standstill maintenance of the retired Bombardier Talent trains until March 8, 2018.[64] The Walkley Yard was built in 1955 by the National Capital Commission for the Canadian National Railways and later sold to the Canadian Pacific Railway. The yard has enclosed buildings for repairs and outdoor storage tracks.
As part of the Stage 2 project, a new maintenance facility was built adjacent and to the west of the old facilities.[65] The construction of the new yard facilities began in 2019.[66]
^Manconi, John (General Manager, Transportation Services) (January 23, 2020). Special Transit Commission meeting - January 23, 2020 (Audio Recording). 14 minutes in. Retrieved May 6, 2020. Ridership on the Trillium Line set new all-time records in September, October, November, and December, and on an average weekday we carry approximately 20,000 passenger trips on that line.
^Report to: Council(PDF) (Technical report). February 22, 2019. p. 52. Archived(PDF) from the original on February 26, 2019. Retrieved February 26, 2019.
Бестселлер Дж. Р. Р. Толкина в жанре фэнтези «Властелин колец» поначалу вызвал неоднозначную литературную критику. Несмотря на некоторые первые восторженные отзывы таких сторонников, как У. Х. Оден, Айрис Мердок и К. С. Льюис, литературная враждебность к Толкину быстро обос
Esta biografia de uma pessoa viva cita fontes, mas que não cobrem todo o conteúdo. Ajude a inserir fontes confiáveis e independentes. Material controverso que esteja sem fontes deve ser imediatamente removido, especialmente se for de natureza difamatória.—Encontre fontes: ABW • CAPES • Google (N • L • A) (Novembro de 2017) Dan Kreider é um jogador profissional de futebol americano estadunidense que foi campeão da temporad...
Thunder Bay ChillDatos generalesNombre Thunder Bay ChillApodo(s) The ChillFundación 2000Propietario(s) John MarrelloEntrenador Tony ColistroInstalacionesEstadio Chapples Park StadiumCapacidad 1,600Ubicación Thunder Bay, OntarioUniforme Titular Alternativo Última temporadaLiga USL League Two(2014) 52ºTítulos 1 (por última vez en 2008) Página web oficial[editar datos en Wikidata] El Thunder Bay Chill es un equipo de fútbol de Canadá que juega en la USL League Two, la cua...
هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (سبتمبر 2022) كارين كنور سيتينا معلومات شخصية اسم الولادة (بالألمانية: Karin Dagmar Zetina)[1] الميلاد 19 يوليو 1944 (79 سنة)[1] غراتس[1] مواطنة النمسا عضوة في ال
جوسيبي روسي (بالإنجليزية: Giuseppe Rossi) معلومات شخصية الميلاد 1 فبراير 1987 (العمر 36 سنة)[1]تينيك الطول 1.73 م (5 قدم 8 بوصة)[2][2] مركز اللعب مهاجم الجنسية الولايات المتحدة معلومات النادي النادي الحالي سبال الرقم 49 مسيرة الشباب سنوات فريق 1996–1999 New Jersey S...
أتول كولكارني معلومات شخصية الميلاد 10 سبتمبر 1965 (58 سنة) بيلغام مواطنة الهند الحياة العملية المدرسة الأم الكلية الوطنية للدراما [لغات أخرى] المهنة ممثل اللغات الهندية، والماليالامية الجوائز جائزة فيلم فير جنوبجائزة الفيلم الوطني لأفضل ...
Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat dipertanyakan dan dihapus sewaktu-waktu.Cari sumber: GF Culinary – berita · surat kabar · buku · cendekiawan · JSTOR Boga GroupPT Gading Food CulinaryJenisPerseroan terbatasIndustriRitelDidirikan2003PendiriHenky RusliKantorpusatJakarta, IndonesiaProdukMaka...
Fifth planet from the Sun This article is about the planet. For the Roman god, see Jupiter (god). For other uses, see Jupiter (disambiguation). JupiterFull disk view of Jupiter in natural color, with the shadow of its largest moon Ganymede cast onto it and the Great Red Spot at the left horizon.DesignationsPronunciation/ˈdʒuːpɪtər/ ⓘ[1]Named afterJupiterAdjectivesJovian /ˈdʒoʊviən/SymbolOrbital characteristics[2]Epoch J2000Aphelion816.363 Gm (5.4570 AU...
National law of the city-state The Old Supreme Court Building, which was in use between 1939 and 2005, as it appeared in September 2009 The legal system of Singapore is based on the English common law system. Major areas of law – particularly administrative law, contract law, equity and trust law, property law and tort law – are largely judge-made, though certain aspects have now been modified to some extent by statutes. However, other areas of law, such as criminal law, company law and f...
2012 video by One DirectionUp All Night: The Live TourVideo by One DirectionReleased28 May 2012Recorded3 January 2012 at International Centre in Bournemouth, EnglandGenrePopLength73 minutesLabel Syco Columbia DirectorAndy SaundersProducer Andy Saunders Tom Bairstaw Up All Night: The Live Tour is a video album documenting the 3 January 2012 show of English-Irish boy band One Direction's Up All Night Tour. It was released on 28 May 2012 by Syco Music. Filmed at the International Centre ...
Asu AsuniAsu AsuniBoliviaOruro Department, Sajama Province, Turco Municipality Highest pointElevation5,088 m (16,693 ft)[1]Coordinates18°13′13″S 68°31′20″W / 18.22028°S 68.52222°W / -18.22028; -68.52222GeographyLocationBoliviaOruro Department, Sajama Province, Turco MunicipalityParent rangeAndes, Cordillera Occidental Asu Asuni (Aymara asu newborn creature,[2] the reduplication signifies there is a group or a complex of someth...
2008 single by Counting CrowsYou Can't Count On MeSingle by Counting Crowsfrom the album Saturday Nights & Sunday Mornings ReleasedMarch 25, 2008GenreRockLabelGeffenSongwriter(s)Jim Bogios, David Bryson, Adam Duritz, Charlie Gillingham, Millard Powers, Dan VickreyProducer(s)Brian DeckCounting Crows singles chronology 1492 (2008) You Can't Count On Me (2008) Come Around (2008) You Can't Count On Me is the second single and lead commercial single released by Counting Crows[1] from t...
American politician For other people with the same name, see John Parker (disambiguation). This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: John Francis Parker – news · newspapers · books · scholar · JSTOR (March 2007) (Learn how and when to remove this template message) John Francis ParkerMinority Leader of ...
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Yelvertoft – news · newspapers · books · scholar · JSTOR (December 2009) (Learn how and when to remove this template message) Human settlement in EnglandYelvertoftAll Saints' Church, YelvertoftYelvertoftLocation within NorthamptonshirePopulation804 (2021)O...
Victory Bowl NCCAA Victory Bowl LocationvariousOperated1997–presentChampionship affiliationNCCAAConference tie-insNone2022 matchupSouthwestern Assemblies of God vs. Olivet Nazarene (Olivet Nazarene 21–16) The Victory Bowl is the championship football game between schools that sponsor football and are members of the National Christian College Athletic Association and did not qualify for either the NCAA or NAIA playoffs. It is one of the few post-season bowl games for smaller schools. Becau...
Indian television actor (born 1987) Namik PaulPaul in 2019Born (1987-09-19) 19 September 1987 (age 36)[1]Dehradun, Uttrakhand, IndiaAlma materLewis & Clark College, OregonOccupationsActorjournalistYears active2015–presentKnown forEk Duje Ke Vaaste Ek Deewana Tha Namik Paul (born 19 September 1987) is an Indian actor who primarily works in Hindi television. He made his acting debut in 2015 with Qubool Hai portraying Ahsaan. He earned recognition with his portr...
Artificially constructed location RKO Studios Encino, Bedford Falls used in Frank Capra's It's a Wonderful Life, 1946, small town layout. A set is artificially constructed scenery used in film and TV. In the latter two cases there are many reasons to build or use a set instead of travelling to a real location, such as budget, time, the need to control the environment, or the fact that the place does not exist. Sets are normally constructed on a film studio backlot or sound stage, but any plac...
For the planning area located in the Central Region of Singapore, see Bukit Merah. One of two towns in Kinta District, Perak, Malaysia. District of Kerian, Northern Perak Bukit Merah (Jawi: بوكيت ميره; Chinese: 武吉美拉; Tamil: புக்கிட் மேரா) is a town and a popular tourist destination. It is famous for the Bukit Merah Laketown Resort. 5°02′N 100°39′E / 5.033°N 100.650°E / 5.033; 100.650 District of Kinta, Central Perak ...
This article contains content that is written like an advertisement. Please help improve it by removing promotional content and inappropriate external links, and by adding encyclopedic content written from a neutral point of view. (May 2023) (Learn how and when to remove this template message) Tourism in Rwanda is the largest source of foreign exchange earnings in Rwanda and was projected to grow at a rate of 25% every year from 2013-2018. The sector is the biggest contributor to the national...