This article is within the scope of WikiProject Trains, an attempt to build a comprehensive and detailed guide to rail transport on Wikipedia. If you would like to participate, you can visit the project page, where you can join the project and/or contribute to the discussion. See also: WikiProject Trains to do list and the Trains Portal.TrainsWikipedia:WikiProject TrainsTemplate:WikiProject Trainsrail transport
By "because of its evenly spaced stations" means you don't have the situation such as Leicester Square and Covent Garden being right next door to each other. The HMSO source also adds, "Finally, by having fewer stations than the Piccadilly Line between King's Cross and Finsbury Park, the Victoria Line would be faster over that stretch". I think "fewer stops" describes it best. Specifically, I was thinking about the "hack" from Morden to Kings Cross by getting on the Victoria at Stockwell instead of staying on the Northern, which is reportedly faster (though I didn't have a stopwatch). Ritchie333(talk)(cont)09:46, 14 September 2018 (UTC)Reply
Perhaps "long-stretches between stations outside of Zone 1 / centre of London"; North of King's Cross there generally 2 kilometres / 1.5 miles between stops (Tottenhale Hale excepted). —Sladen (talk) 10:19, 14 September 2018 (UTC)Reply
Wrong dates
Latest comment: 7 years ago2 comments2 people in discussion
Because this line was built to connect already-existing stations on other lines, and consequently every station on this line (with the exception of Pimlico) already existed before the Victoria Line was built. ‑ Iridescent09:04, 2 December 2018 (UTC)Reply
Jean Charles de Menezes
Latest comment: 5 years ago4 comments3 people in discussion
Latest comment: 1 year ago8 comments5 people in discussion
There is a cited comment in the 'service and rolling stock' section that the replacement of the signalling system was the "world's first ATO-on-ATO upgrade", but I think it is important to point out that this is not true. The Tsuen Wan Line of the MTR in Hong Kong had its Westinghouse Block Work ATO system upgraded to SACEM in 1996, with the Kwun Tong Line and Island Line following suit by 1998. I know for a fact this is true, but the only source I can find right now that mentions MTR using Westinghouse and then switching to SACEM is this forum thread.
I know the source isn't perfect but I still think the claim that the Victoria line is the world's first ATO-on-ATO upgrade should either be corrected or removed as it is simply not true. KeepElephant (talk) 16:06, 11 April 2024 (UTC)Reply
To be strictly accurate the comment is that the replacement signalling system was claimed by LUL to be the world's first. As such the statement is true. They did make that claim. Murgatroyd49 (talk) 16:21, 11 April 2024 (UTC)Reply
There's also an argument that SACEM isn't always ATO - the use of it on the Paris RER was not an ATO system originally, it was upgraded in the 2010s. Turini2 (talk) 16:40, 11 April 2024 (UTC)Reply
I have found this site which does mention ATO on the ATP of the Block Work. And it is true that SACEM isn't always ATO but MTR had ATO since day 1. I don't edit often (and please don't use this to disregard my comments) but from what I can tell, most Hong Kong-based sites that get technical about trains lead to the linked site (HK Rail Engineering Centre).
And as for @Murgatroyd49 LUL did make the claim, but my point is that I think it's misleading to readers to leave it there without mentioning the Tsuen Wan Line, which is in fact the world's first ATO on ATO upgrade to the best of my knowledge. Not about whether LUL made the claim but the correctness of the claim. KeepElephant (talk) 17:02, 11 April 2024 (UTC)Reply
First let me assure KeepElephant that no Wikipedia editor whom I respect considers the frequency of other people's editing. (But whether they have a named account or just use an anonymous URL - that is another matter.) I take his point that the truth of LUL's claim is significant. Unfortunately, I don't read Chinese so I cannot verify the cited sources. A statement that LUL are making bogus claims requires proper citation. OrewaTel (talk) 08:26, 15 April 2024 (UTC)Reply
Sorry for the late reply but you can try putting the link in my previous reply through Google Translate for a reasonably approximate translation of the content in Chinese. I don't know Chinese myself either but if you click the ATP button it will show you the basics of the MTR's first and second signalling systems (Westinghouse and SACEM). If you are still not convinced, Wikipedia's own article on the MTR rolling stock shows that it had ATO on both the first and second signalling systems, with the Phase III order being explicitly procured for the signalling upgrade, and definitely predates the Victoria line upgrade by more than a decade. KeepElephant (talk) 00:32, 18 August 2025 (UTC)Reply
The first ATO system was invented in Paris metro in 1951. It was tested between 1952 - 1956; it was introduced on line 11 in juin 1969.
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.