Project initiation documentation

The project documentation (PID) is one of the most significant artifacts in project management, which provides the foundation for the business project.

The project initiation documentation bundles the information, which was acquired through the starting up a project (SU) and initiating a project (IP) processes in a PRINCE2 controlled project environment. PRINCE2's 2009 renaming "document" to "documentation" indicates a collection of documentation that has been collected up creating a project rather than all the information in the system.[according to whom?]

The project initiation document provides a reference point throughout the project for both the customer and the project team.

A project initiation document often contains the following:

A project charter could be created instead of a project initiation documentation; the two document types are highly similar. But a project charter is less detailed, which makes it more suitable for cases in which content producers are less available.

Project initiation documentation in terms of PRINCE2

The project initiation documentation is a PRINCE2[1] term representing the plan of approach in project management. It is assembled from a series of other documents, including the business case, the terms of reference, the communication plan, the risk register, the project tolerances, the project plan, and any specific project controls or inspections as part of a departmental quality plan or common project approach. The project initiation documentation represents a detailed version of the basic project start-up document called the project brief.

The project initiation documentation bundles together documentation to form the logical document that brings together all of the key information needed to start and run the project on a sound basis. It should be conveyed to all stakeholders and agreed and signed off by the business sponsors. In short, this is the, "who, why, and what", part of the project. It defines all major aspects of a project and forms the basis for its management and the assessment of overall success. The project initiation document builds upon the business case (if it exists) using the information and analysis data produced during initiation activities.[2]

A common part of formal project methodologies such as PRINCE2[3] the document is a major milestone in the initiating a project (IP) process. It is the document that goes before the project board for sign off to commence a project.

The project initiation document provides a reference point throughout the project for both the customer and the project team.

Writing a project initiation document

Purpose

The purpose of the project initiation document is to capture and record important information needed to correctly define and plan the project. The project initiation document should expand upon the project mandate, and state what the project is aiming and planning to achieve, and the reason for the importance of meeting these aims. It also contains the list of people who are participating in the project development from the very beginning until project closure, along with their roles and responsibilities. The project initiation document also includes the date when the project initiation documentation was approved by the project board. The project initiation document is not regularly updated during project stages. Any revisions or updates which are needed are to be done at the end of the each stage in order to incorporate detailed milestones for the next steps. The project initiation document is the basis of decisions taken for the project and it is unhelpful when the document is queried or altered at a later stage with no reference to why, by whom or when.[4]

Project scope statement

Project scope statement is one of the most important sections of the project initiation document. The project scope statement is divided into three parts: Project scope statement, proposed solution and in scope for project example. This is the part of the project initiation document explaining in depth what the project is delivering for stakeholders and customers. Proposed solution explains what innovations, changes and aspects the project will bring within the environment and the society and which changes and renewals it will cause. The project scope statement should include as much detail as possible, as it helps to avoid proliferating problems and questions in the project lifecycle (requirements are needed in order to succeed in in scope category). The in scope phase helps the project manager to make decisions of financial aspects and projects' expenses.[5]

Project background

The project background establishes why and how the project was created. Phase 1 of the project will deliver the online functionality required together with the changes to the necessary business systems impacted, whilst phase 2 will deliver the digital rights management and real-time advert insertion. The person, who has played a pivotal role in project participation should be mentioned in this section of the project initiation document. It is a rational way of make the specific project above others emphasising the attention of participation of most active candidate of a team. It is because someone important within the company wants to see it. The result should be that the resources and equipment are made available to you to ensure your project happens.[6]

Assumptions, dependencies and constraints

Assumptions, dependencies and constraints detail the project initiation document. Those details are assumed ahead of the project management requirements and business requirements specification being documented. Project constraints in the project initiation document identifies the outer impact, such as unavailability of resources or a competitor (e.g. another project).[7]

Organisation and governance

In order to complete the organisation stage, the team needs to complete the organization chart. A project may be achieved by a cross-functional team with experienced representatives from multiple departments including development, interactive, test, networking, infrastructure and business systems, security and marketing. The involvement of the different areas will vary as the project progresses of the initial project.[8] The SMG (Senior Management Group) will be notified of key findings and developments.[9]

Communication plan

During the whole process of creating the project initiation document the project manager is aware that they will be attending meetings with third party project managers, lead architects and team leaders where discussions of project management reports, weekly project team meetings, fortnightly supplier meetings and weekly programme board meetings will take place.[10]

Quality plan

Project quality plan is usually written by the IT quality assurance (ITQA) and identifies aspects which will be delivered as part of a project (baselined project plan, business requirements (BRS), use cases, high level design (HLD), software requirements spec (SRS), test scripts, test report, post development review (PDR), stage assessments in a project quality plan). The ITQA also determines when the end stage assessment (ESA) will be taking place. These are basically checkpoints during the life of the project which ensure that a quality product is being delivered. ESA's implies the meeting where considering the baselined project plan to ensure that it is up to date and on schedule, project management reports, project workstream checkpoint reports, team meeting minutes, actions and agenda, project risk and issues log, and a quality plan tip.[11]

Initial project plan

Writing the initial plan for project initiation documentation implies adequate reconsideration of proposed date and detail phases accordingly. Often business stakeholders ask projects to be delivered to impossible dates, which requires highlighting of that fact. In that case most of stakeholders are flexible and about to reconsider the launch date or reducing the scope. Relaunching date or reducing the scope need to be supported with justifications, on which stakeholders making a decision of delaying the launch date. The sooner the worker starts building that sort of relationships with stakeholders, the easier it will be later on when more pressing concerns regarding the scope are raised.[12]

Project controls

There are specific number of sections, which needed to be completed in terms of controlling the whole project: project controls, project stages and exception process. Those could include budget actuals and forecasts produced for each financial period, exceptions to be escalated to the corporate programme manager, product reviews from the quality plan, project tolerance, risk mitigation plan, identifying project risks and plans for their mitigation, an issues log, existing change control processes, weekly highlight report for corporate program board, weekly supplier meetings, weekly project teams meetings, etc.

Initial risks and issues log

The rule[clarification needed] says the more we are about to commit, the more we will need to deliver. The project stages are initiation, requirements, design, development, test, project launch and close with the exception process stage. The last stage is the most unstable, as covers how much the budget, time and project scope could increase without the project being forced to go into exception. In a situation when stakeholders decide to relocate project into exception, a detailed exception plan is needed to be introduced which will replace the versions of the project/stage plans which were in use before the exception. And on top of all this additional paperwork, the project manager will also have to keep the project moving forward and ensure their team is motivated. Once the project initiation document is formally approved, it means that there is an additional contingency to utilize before having to move into exception. This can make all the difference to the successful delivery of a project in much the same way as good cash flow is key to the success of any growing business.[13]

Boehm has identified six risk management stages: Identification, assessment, prioritisation, management planning, resolution and monitoring, which take place in project initiation document.[14]

Getting a project initiation document approved

The last stage of writing a project initiation document is the approval, which implies the distribution to all stakeholders on the distribution list within the project initiation document and other interested parties such as operations or HR for resources by e-mails with the request of comments. Then the lead of the team will amass the comments, and then it will be followed by the final meeting where stakeholders and interested parties are about to discuss the project initiation document in further detail. It is only after these stages are complete that your project initiation document will be of a sufficient standard to be approved and passed onto the programme board for funding. Depending on the complexity and the size of the project the stages are about to be completed in five informal and four formal reviews. Some problems could appear such as shortage or resources and lack of finance. It is pivotally important to identify how prioritized is your project before starting the project initiation document, which will help to avoid huge expenses if the project is about to appear in an exception stage.[15]

Characteristics of project initiation document

Specifying the importance of the project,[clarification needed] the project initiation documentation identifies that it is the contract between the project management and sponsor. The aim of the project initiation documentation is understanding the premises of the project. The correct format of project initiation documentation represents the understanding of the background, objectives and benefits. A good project manager is not only interested in delivering an output or a capability to their customer, but interested in the wider context and the benefits that this capability will ultimately bring about. The project initiation documentation identifies what is in scope within the project with the use of flow diagrams and product breakdown structures. The pivotal role plays the identification of responsibilities, which implies roles of project manager, team leader, sponsor, supplier, user representative, stakeholders and members of steering committee.[16]

There are key aspects which need consideration before starting a project and creating a project initiation document, such as: how will the project be delivered? What type of approach: variegates techniques (e.g. waterfall, agile methodology)? What ways of communication with stakeholders, keeping on top of risks, issues and changes.

For a project initiation document it is sufficient to include the place, which emphasize on main phases and activities of the project.

The success of the project initiation document and the whole project can build up on visual aspects such as graphics, as a way of galvanising better visual memorising of the project.

Risks are needed to be identified before they appear as a problem within the whole project. The problem could be resolved by creating the list of top projects' risks and what precautionary measures have to be taken.

The financial side of the project is needed to be considered. The project initiation documentation scheme needs to be included along any budgetary constrains and provided the assumptions the team used when they estimate as well as details about how often the review will be estimates. The important aspect should avoid isolations, as it might cause mistakes such as spelling or jargon.

In order to improve the project initiation documentation, a presentation could be created, identifying and emphasising on main points.[16]

See also

References

  1. ^ Schwartz, Brenna (2023-07-26). "How to Create a Project Initiation Document (Template Included)". ProjectManager. Retrieved 2024-11-23.
  2. ^ Project Initiation and the Project Initiation Document - Retrieved on June 3, 2010
  3. ^ Prince 2: A Practical Handbook By Colin Bentley, ISBN 978-0-7506-5330-5
  4. ^ Purpose of PID and Related documents, .http://www.my-project-management-expert.com/writing-a-project-initiation-document-intro.html
  5. ^ Project Scope Statement in PID, http://www.my-project-management-expert.com/writing-a-project-scope-statement-in-a-project-initiation-document.html
  6. ^ Project Backgrounds in Terms of PID, http://www.my-project-management-expert.com/writing-a-project-initiation-document-background.html
  7. ^ Assumptions, Dependencies and Constraints of PID, http://www.my-project-management-expert.com/writing-a-project-initiation-document-assumptions.html
  8. ^ Project Organization and Governance, http://www.my-project-management-expert.com/writing-a-project-initiation-document-governance.html
  9. ^ Draft Project initiation Document, https://www.rbkc.gov.uk/pdf/jsna_pid.pdf
  10. ^ Communication Plan, http://www.my-project-management-expert.com/writing-a-project-initiation-document-communications-plan.html
  11. ^ Project Quality Plan, http://www.my-project-management-expert.com/writing-a-project-initiation-document-quality-plan.html
  12. ^ Project Initial Plan, http://www.my-project-management-expert.com/writing-a-project-initiation-document-initial-plan.html
  13. ^ Project Controls in PID, http://www.my-project-management-expert.com/writing-a-project-initiation-document-project-controls.html
  14. ^ Boehm, B.W. (1989). Software Risk Management. Washington D.C.: IEEE Computer Society Press.
  15. ^ Getting a Project Initiation Document Approved, http://www.my-project-management-expert.com/project-lifecycle-project-initiation-document-approval.html
  16. ^ a b What makes a perfect Project Initiation Document (PID)?, http://www.susannemadsen.co.uk/blog/what-makes-a-perfect-project-initiation-document-pid

Read other articles:

Frigate of the Royal Navy Loch Killisport in July 1945 History United Kingdom NameHMS Loch Killisport NamesakeLoch Killisport Ordered2 February 1943 BuilderHarland and Wolff, Belfast Yard number1248 Laid down28 December 1943 Launched6 July 1944 Completed9 July 1945 CommissionedJuly 1945 DecommissionedApril 1946 RecommissionedNovember 1950 DecommissionedApril 1952 RecommissionedFebruary 1955 DecommissionedAugust 1965 FateSold for scrapping, 20 February 1970 General characteristics Class and ty...

 

Film Titel Faustrecht der Prärie Originaltitel My Darling Clementine Produktionsland USA Originalsprache Englisch Erscheinungsjahr 1946 Länge 92 Minuten Altersfreigabe FSK 12 Stab Regie John Ford Drehbuch Samuel G. Engel,Winston Miller,Sam Hellman (Screen Story) Produktion Samuel G. Engel Musik Cyril J. Mockridge Kamera Joseph MacDonald Schnitt Dorothy Spencer Besetzung Henry Fonda: Wyatt Earp Linda Darnell: Chihuahua Victor Mature: Doc Holliday Cathy Downs: Clementine Carter Walter Br...

 

Singleton junior (2010) Isaac Charles Singleton junior (* 13. August 1967[1] in Melbourne, Florida) ist ein US-amerikanischer Schauspieler und Synchronsprecher. Inhaltsverzeichnis 1 Leben und Karriere 2 Filmografie 3 Synchronsprecher 4 Weblinks 5 Einzelnachweise Leben und Karriere Singleton junior wurde in Melbourne im Brevard County im US-Bundesstaat Florida als Sohn eines US-Soldaten geboren. Ab seinem 13 Lebensjahr verbrachte Singleton junior seine Jugendzeit in der Kreisstadt Bitb...

In 2015 werd het 37ste Campeonato Sul-Mato-Grossense gespeeld voor voetbalclubs uit de Braziliaanse staat Mato Grosso do Sul. De competitie werd georganiseerd door de Federação de Futebol de Mato Grosso do Sul en werd gespeeld van 1 februari tot 3 mei. Comercial werd kampioen. Eerste fase Groep A Plaats Club Wed. W G V Saldo Ptn. 1. Chapadão 10 5 3 2 22:13 18 2. Costa Rica 10 5 3 2 20:14 18 3. Novoperário 10 4 3 3 18:9 15 4. Comercial 10 4 1 5 9:15 13 5. Misto 10 3 2 5 6:17 11 6. CENE 10 ...

 

British fashion designer Christopher BaileyCBEBorn (1971-05-11) 11 May 1971 (age 52)Halifax, West Yorkshire, EnglandAlma materRoyal College of Art University of WestminsterOccupationFashion designerTitleFormer chief creative officer and president, Burberry GroupSpouse Simon Woods ​(m. 2012)​Children2AwardsDesigner of the Year, British Fashion Awards 2005 Christopher Paul Bailey CBE (born 11 May 1971) is a British fashion designer who was president and ch...

 

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Energy level splitting – news · newspapers · books · scholar · JSTOR (December 2009) (Learn how and when to remove this template message) Splitting of atomic energy levels in rubidium In quantum physics, energy level splitting or a split in an energy level of a...

UANL Tigres Basisdaten Name Club de Fútbol Tigres de la UniversidadAutónoma de Nuevo León Sitz San Nicolás de los Garza, Mexiko Gründung 1967 Präsident Mauricio Culebro Website tigres.com.mx Erste Fußballmannschaft Cheftrainer Robert Siboldi Spielstätte Estadio Universitario Plätze 41.615 Liga Liga MX Clausura 2023 Liga: 7. PlatzFinalrunde: Meister Heim Auswärts Die Tigres de la Universidad Autónoma de Nuevo León, besser bekannt als UANL Tigres oder kurz Tigres, sind ein mexikanis...

 

Người giúp việc đang là quần áo Người giúp việc là những người được các gia đình hay cá nhân thuê làm các công việc nhà như nấu ăn, lau dọn, làm vườn hay thậm chí là chăm sóc trẻ em và người già, tùy theo yêu cầu của gia chủ. Một số người giúp việc gia đình sống trong hộ gia đình của người chủ sử dụng lao động. Trong một số trường hợp, sự đóng góp và kỹ năng của người g...

 

American film producer (1902–1979) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Darryl F. Zanuck – news · newspapers · books · scholar · JSTOR (November 2022) (Learn how and when to remove this template message) Darryl F. ZanuckZanuck in 1964BornDarryl Francis Zanuck(1902-09-05)September 5, 1902Wahoo, N...

The ferry Oski at Pier 39 in October 2009. Blue & Gold Ferry Legend Sausalito Golden Gate San FranciscoPier 41 This diagram: viewtalkedit Blue & Gold Fleet is a privately owned company in the United States providing ferry services in the San Francisco Bay Area of California. It operates the San Francisco Bay Ferry commuter ferry system under contract with WETA.[1] Blue & Gold also operates tourist and excursion services under its own brand from Pier 41 in San Fra...

 

Former hospital in Hong Kong Old Tsan Yuk Maternity HospitalOld Tsan Yuk Hospital, now Western District Community CentreFormer namesTsan Yuk Maternity HospitalGeneral informationArchitectural styleGeorgianAddress36A Western Street, Sai Ying Pun, Hong Kong Island, Hong KongCurrent tenantsWestern District Community CentreCompleted17 October 1922; 101 years ago (1922-10-17)CostHK$ 94,000 Hong Kong Graded Building – Grade IIIDesignated18 December 2009; 13 yea...

 

1978 American drama film This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Mean Dog Blues – news · newspapers · books · scholar · JSTOR (March 2016) (Learn how and when to remove this template message) Mean Dog BluesDirected byMel StuartWritten byGeorge LeffertsProduced byGeorge LeffertsCharles A. PrattStarrin...

2009 film directed by David Soren Merry MadagascarBased onCharacters byTom McGrathEric DarnellWritten byDavid SorenEric DarnellTom McGrathDirected byDavid SorenStarringBen StillerChris RockDavid SchwimmerJada Pinkett SmithDanny JacobsCedric the EntertainerAndy RichterCarl ReinerMusic byHeitor PereiraCountry of originUnited StatesOriginal languageEnglishProductionExecutive producerMireille SoriaProducerJoe M. AguilarEditorJames RyanRunning time30 minutesProduction companiesDreamWorks Animation...

 

Italian film magazine CiakCategoriesFilm magazineFrequencyMonthlyCirculation100,000Founded1985; 38 years ago (1985)CompanyArnoldo Mondadori EditoreCountryItalyBased inMilanLanguageItalian Ciak magazine's official logo Ciak is a popular Italian film magazine published in Milan, Italy. It is the most popular film magazine in Italy. The title is the Italian word (also spelled ciac, for a film clapperboard. History and profile Ciak was established in 1985 by Arnoldo Mondadori Ed...

 

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: ¿Quién quiere ser millonario? Salvadoran game show – news · newspapers · books · scholar · JSTOR (July 2011) (Learn how and when to remove this template message) Salvadoran TV series or program ¿Quién quiere ser millonario?Created byDavid Briggs M...

Neighbourhood in Mumbai City, Maharashtra, IndiaMatungaNeighbourhoodMatungaCoordinates: 19°01′05″N 72°50′41″E / 19.01798°N 72.844763°E / 19.01798; 72.844763Country IndiaStateMaharashtraDistrictMumbai CityCityMumbaiGovernment • TypeMunicipal Corporation • BodyBrihanmumbai Municipal Corporation (MCGM)Languages • MarathiMarathiTime zoneUTC+5:30 (IST)Pincode400019[1]Area code022Vehicle registrationMH-01 Matunga (...

 

В Википедии есть статьи о других людях с фамилией Петипа. Мариус Петипафр. Marius Petipa Мариус Иванович Петипа, 1898 год Псевдонимы Мариус Иванович Петипа Дата рождения 11 марта 1818(1818-03-11)[1][2][…] Место рождения Марсель, Франция Дата смерти 1 (14) июля 1910[2][3] (92 года) ...

 

VII Brygada Kawalerii Historia Państwo  Polska Sformowanie 1919 Tradycje Rodowód I Brygada Jazdy Wielkopolskiej Kontynuacja Brygada Kawalerii Poznań Dowódcy Pierwszy płk Stanisław Sochaczewski Organizacja Dyslokacja Poznań Rodzaj sił zbrojnych Wojska lądowe Rodzaj wojsk Jazda VII Brygada Kawalerii (VII BK) – wielka jednostka kawalerii Wojska Polskiego II RP. Formowanie i zmiany organizacyjne Brygada sformowana została w marcu - kwietniu 1919 r. jako I Brygada Jazdy Wielkopols...

Protected area in Maryland, United States Savage River State ForestView of Savage RiverLocationGarrett County, Maryland, United StatesNearest cityGrantsville, MDCoordinates39°35′59.4″N 79°3′17″W / 39.599833°N 79.05472°W / 39.599833; -79.05472Area54,000 acres (220 km2)[1]EstablishedJanuary 8, 1929[2]Governing bodyDepartment of Natural Resourceswww.dnr.state.md.us Savage River State Forest is located in the north and northeaster...

 

American cable television network CN8 redirects here. Not to be confused with Cranial nerve 8. Television channel The Comcast NetworkCountryUnited StatesBroadcast areaConnecticutDelawareMaineMarylandMassachusettsNew HampshireNew JerseyPennsylvaniaRhode IslandVermontVirginiaWashington, D.C.HistoryLaunchedDecember 1, 1996; 27 years ago (1996-12-01)ClosedOctober 2, 2017; 6 years ago (2017-10-02)Replaced byNBC Sports Philadelphia PlusNBC Sports Washington PlusF...

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!