M8 (Istanbul Metro)
Line M8 , officially referred to as the M8 Bostancı-Parseller line, is a rapid transit line of the Istanbul Metro . The line connects Bostancı railway station , on the southern coast of the Anatolian side, to Parseller , in the district of Ümraniye . At Bostancı, connections are available with intercity trains to destinations in Anatolia, as well as the Marmaray service across the Bosphorus.
The line is 14.27-kilometre (8.87 mi) long with 13 stations. It opened for service on 6 January 2023.[ 1]
It is a fully automatic driverless metro line; all stations have platform screen doors and are completely underground.[ 2]
Stations
No
Station
District
Transfer
Type
Notes
1
Bostancı
Maltepe
・ (Bostancı station ) ・ (Bostancı Pier ) İETT Bus : 2, 4, 10B, 16, 16D, 17, 17L, 19FB, 222, 252, E-9,
Underground
Bostancı Ferry Terminal ・Bostancı Lunapark
2
Emin Ali Paşa
Kadıköy
İETT Bus : 2, 17, 17L, 252
Şemsettin Günaltay Avenue
3
Ayşekadın
İETT Bus : 2, 17, 17L, 252
4
Kozyatağı
Ataşehir
İETT Bus : 14KS, 14T, 15KB, 16A, 16B, 16C, 16F, 16FK, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 19, 19B, 19FK, 19H, 19Z, 21B, 21C, 21G, 21K, 21U, 129L, 129T, 130, 130A, 130Ş, 251, 252, 319, 500T, E-10
Kozyatağı Shopping Mall
5
Küçükbakkalköy
İETT Bus : 10, 10A, 11T, 13AB, 14A, 14AK, 14CE, 14ÇK, 14S, 19ES, 19FS, 19SB, 19K, 19S, 19T, 19V, 19Y, 319, 320A, 320Y, KM46
Acıbadem University Kerem Aydınlar Campus
6
İçerenköy
İETT Bus : 10A, 11T, 13AB, 14A, 14AK, 14CE, 14S, 14T, 14ÇK, 14KS, 18UK, 19, 19D, 19ES, 19FS, 19K, 19S, 19SB, 19T, 19V, 19Y, 319, 320A, 320Y, 133F, KM46
Ataşehir Sebze ve Meyve Hali・İETT Anatolian Garage
7
Kayışdağı
İETT Bus : 14A, 14AK, 14S, 14T, 19EK, 19ES, 19SB, 19T, 19Y, 320A, 320Y
Brandium AVM・Erenköy Gümrük Müdürlüğü
8
Mevlana
(Project)İETT Bus : 14A, 14AK, 14CE, 14S, 14T, 14TM, 14ÇK, 14ŞB, 19D, 19E, 19EK, 19ES, 19S, 19SB, 19V, 320, E-3
İskan Konutları・Yeniçamlıca Mahallesi
9
İMES
Ümraniye
(Under Construction)İETT Bus : 14A, 14AK, 14CE, 14S, 14T, 14TM, 14ÇK, 14ŞB, 19D, 19E, 19EK, 19ES, 19S, 19SB, 19V, 320
İMES・Dudullu Organize Sanayi Sitesi・Tavukçuyolu Avenue
10
MODOKO–KEYAP
İETT Bus : 11P, 14A, 14AK, 14CE, 14ES, 14S, 14T, 14TM, 14YE, 14ÇK, 14ŞB, 15SD, 19D, 19E, 19EK, 19ES, 19S, 19SB, 19V, 20D, 131T, 131YS, 320, UM74
Modoko・KEYAP・Osmangazi Korusu・NATO Yolu Avenue
11
Dudullu
İETT Bus : 11V, 11ÇB, 11ÜS, 14, 14TM, 15SD, 19D, 131, 131A, 131B, 131C, 131H, 131TD, 131Ü, 522, 522B
MetroCorner AVM・Alemdağ Avenue
12
Huzur
İETT Bus : 9, 14B, 14BK
Doğa Park・Ümit Park・Adem Yavuz Sağlık Ocağı・Karadeniz Avenue
13
Parseller
İETT Bus : 14BK
Depot ・Kesikkaya Avenue・Karadeniz Avenue
References
Metro
Tram
Commuter rail
Funicular
BRT Bus Ferry Aerial lift PaymentOperators Lines in italic are under construction with planned opening year in parentheses.