Ascot–Ash Vale line

Ascot–Ash Vale line
A Class 450 calls at Frimley station
Overview
StatusOperational
OwnerNetwork Rail
LocaleSouth East England
Termini
Service
TypeHeavy rail, Commuter Rail
SystemNational Rail
Operator(s)South Western Railway
Technical
Number of tracks1–2
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Electrification750 V DC 3rd rail

The Ascot–Ash Vale line is an 11-mile-58-chain (18.9 km) railway line in Berkshire and Surrey, England. It runs from Ascot station, on the Waterloo–Reading line, to Ash Vale, on the Alton line. There are intermediate stations at Bagshot, Camberley and Frimley, all three of which are in the Borough of Surrey Heath.

All stations are managed by South Western Railway, which operates all services. Most trains on the line run between Aldershot and Ascot; for much of the day, passengers for London must change trains to continue their journeys. Many residents of Surrey Heath prefer to drive to stations outside of the borough for faster, direct rail services to the capital, in preference to using their local line.

Construction of the Ascot–Ash Vale line began in 1864 and was completed by the London and South Western Railway in 1878. The line was electrified using the 750 V DC third-rail system by the Southern Railway in 1939.

Infrastructure and services

Guildford Road Viaduct, Bagshot[1]

The Ascot–Ash Vale line is a railway line in Berkshire and Surrey, England. It runs for 11 mi 58 ch (18.9 km) from Ascot station, on the Waterloo–Reading line, to Ash Vale Junction, on the Alton line and immediately to the east of Ash Vale station.[2] The northern part of the line is double tracked, but a 1 mi 66 ch (2.9 km) section between Frimley station and Ash Vale Junction is single track.[2][a] The line is electrified using the 750 V DC third-rail system and the maximum permitted speed is 60 mph (97 km/h).[2][3] Signalling is controlled by Basingstoke rail operating centre and Woking area signalling centre. Track Circuit Block is in operation. There is one tunnel, the 121 yd (111 m) Bagshot Tunnel, and there are three level crossings.[2] The line crosses the Basingstoke Canal at Mytchett Lake Railway Bridge[4][5] and the Windle Brook on the Guildford Road Viaduct.[1]

All stations on the line are managed by South Western Railway, which operates all services.[6] Ascot has three operational platforms, but the other stations all have two each.[2][b] The off-peak service pattern is two trains per hour from Aldershot to Ascot, calling at all stations on the line. In the morning peak, two trains continue beyond Ascot to London Waterloo with two similar workings in the opposite direction in the evening peak period.[6] Typical journey times between Ash Vale and Ascot are around 26 minutes.[3][6] A 2017 infrastructure assessment commissioned by Surrey Heath Borough Council noted that rail journey times to London from Camberley are slow (c. 72 – c. 80 minutes) and that many local residents choose to drive to Brookwood, Farnborough (Main) and Sunningdale for faster, direct trains to the capital.[8]

History

Proposals and authorisations

The Sunningdale and York Town Railway Company was formed in November 1863 to promote a new line from Sunningdale station on the Waterloo–Reading line and the new town of Aldershot. The line was to include a station at York Town for the Royal Military College, which had moved to Sandhurst in 1812, as well as a junction with the South West Main Line at Farnborough.[13][14] At around the same time, a second similar scheme was proposed by the Sunningdale and Cambridge Town Railway (S&CT), which promoted a more southerly route, serving the new settlement of Camberley and terminating at a junction with the South West Main Line at Farnborough.[15][d] Local opinion favoured the second scheme. The Sunningdale and Cambridge Town Railway Act 1864 (27 & 28 Vict. c. ccvii), passed by Parliament on 14 July 1864, authorised the eastern part of the S&CT line from Sunningdale to Camberley and £70,000 was raised to fund its construction.[17][18] A second act of Parliament, to continue the line to Blackwater station on the Reading–Guildford line, was passed on 29 June the following year as the Sunningdale and Cambridge Town Railway (Extensions) Act 1865 (28 & 29 Vict. c. cxcvii).[17] Construction began with a formal ceremony in November 1864, but after experiencing financial difficulties linked to the bank failure of Overend and Gurney, the company declared bankruptcy in 1866 and the work was abandoned.[17][18]

In 1872, the London and South Western Railway (LSWR) proposed a new line through the area, which would use much of the track bed prepared for the S&CT railway.[19][20] The junction with the Waterloo–Reading line was to be at Ascot, rather than Sunningdale, and the connection to the South West Main Line would be at Frimley, from where the line would continue south to the Alton line at Ash Vale station. The new line was authorised by act of Parliament[which?] on 16 June 1873.[19][21][e] A contractor was appointed in 1874, but the works progressed slower than expected, meaning that the railway was not ready for its intended opening in 1877.[19][21]

Opening

The first part of the line opened between Ascot and the South West Main Line on 18 March 1878, although freight services did not begin until 1 April.[20][22] The line was single-tracked, but at Frimley Junction, to the south of Frimley station, it split in two with double tracked curves joining the main line.[20][f] The initial timetable was six trains per day in both directions between London Waterloo and Ascot via Woking. Goods yards were provided at the three intermediate stations[20] and the opening of the railway at Bagshot stimulated the growth of the plant nurseries in the area.[23]

Frimley railway station

On 2 June 1878, the single line to Ash Vale was opened and doubling of the track between Frimley Junction and station was completed. Double track northwards from Frimley to Ascot was commissioned on 11 June 1893.[20] The section south to Ash Vale was never dualled, although the formation had been built to allow a second set of rails to be added.[20][24]

20th century

The opening of the barracks at Deepcut and Blackdown increased traffic on the Ascot–Ash Vale line.[25] Between August 1914 and November 1916, public train services were suspended to allow army traffic to operate. In 1917, German Prisoners of War were transported to Frimley station, before being taken to a camp on Frith Hill.[26] On 30 April 1938, the Surrey Border & Camberley Railway opened its southern terminus at Farnborough Green, close to Frimley station. The 10+14 in (260 mm) narrow gauge railway closed at the start of the Second World War and did not reopen after the end of hostilities.[27][28]

A Class 423 unit (left) departs Ascot for Ash Vale in April 1981, while a Class 421 heads for Reading

Electrification of the Ascot–Ash Vale line was completed shortly before the start of the Second World War by the Southern Railway. Electric services began on 1 January 1939. Under the new timetable, most trains were able to run from Ash Vale via Staines to London Waterloo, instead of terminating at Ascot.[28][29] Prior to electrification, many steam-hauled services were operated with M7 0-4-4T locomotives.[30] Class 401 units were used on the line from 1939 to 1971 and Class 421 units were introduced in 1972.[31]

A Class 450 unit from Frimley joins the Alton line at Ash Vale Junction

The 1960s saw a period of rationalisation. The curves at Frimley, linking the line to the South West Main Line, were closed on 25 October 1964.[32] The goods yards at Bagshot, Camberley and Frimley closed between 1962 and 1965.[33] Two major resignalling projects took place in the early 1970s. The first, in which colour light signals were installed between Frimley and Ash Vale, was completed on 25 March 1973.[34] Frimley Junction signal box closed on that day,[35] but the box at Ash Vale remained in use until 2014.[36] The resignalling of the stretch of line between Camberley and Ascot was commissioned on 8 September 1974, with control of all train movements being transferred to Feltham.[34] Bagshot signal box had closed on 3 July 1973,[37] but Camberley box was retained to operate the level crossing until it too was closed in January 1975.[38] A new station building was constructed at Camberley in 1976-77, providing office accommodation above the main entrance from the town.[39]

Notes

  1. ^ Double track resumes 16 ch (1,100 ft; 320 m) to the north of Ash Vale junction, allowing trains for Ascot to clear the Alton line before accessing the single-line section towards Frimley.[2]
  2. ^ The shortest platforms on the line are at Frimley station and have a length of 91 m (299 ft).[7]
  3. ^ Ash Vale station is 32 mi 38 ch (52.3 km) from London Waterloo when measured via Woking.[2]
  4. ^ Until 15 January 1877, Camberley was known as "Cambridge Town".[16]
  5. ^ The 1873 act also authorised a connection to the Reading–Guildford line at Farnborough North, but this link was never built.[19]
  6. ^ It is unclear whether the north-to-west curve joining Frimley Junction to the South West Main Line was completed in time for the opening of the line on 18 March 1878. It is possible that this stretch of track opened at a later date.[20]

References

  1. ^ a b "Guildford Road Viaduct, Bagshot". Southern Railway E-mail Group. 23 January 2010. Retrieved 13 February 2024.
  2. ^ a b c d e f g h "Sectional Appendix" 2009, pp. 115, 186, 207–209.
  3. ^ a b "Route Specifications" 2016, pp. 54–57.
  4. ^ Vine 1994, p. 135.
  5. ^ Jebens 1996, p. 15.
  6. ^ a b c "Guildford to Farnham and Ascot via Aldershot" (PDF). South Western Railway. December 2023. Retrieved 10 February 2024.
  7. ^ "Sectional Appendix" 2009, p. 125.
  8. ^ Tuck, Julia; Cesbron, Stephanie (December 2017). "Surrey Heath Infrastructure Needs Assessment : Part A - Baseline Report" (PDF). Surrey Heath Borough Council. Archived (PDF) from the original on 17 September 2023. Retrieved 17 September 2023.
  9. ^ a b Quick 2023, p. 56.
  10. ^ Quick 2023, p. 63.
  11. ^ Quick 2023, p. 116.
  12. ^ Quick 2023, p. 199.
  13. ^ "Sunningdale and York Town Railway and extension to Aldershot". Morning Post. No. 28053. 14 November 1863. p. 7.
  14. ^ Bennett 2009, p. 7.
  15. ^ "Sunningdale and Cambridge Town Railway". Daily News. No. 5467. 16 November 1863. p. 8.
  16. ^ McEwan, Fergus (21 January 2017). "Museum celebrates 140 years of Camberley's name, but where did it come from?". Surrey Live. Archived from the original on 31 August 2023. Retrieved 16 August 2023.
  17. ^ a b c Williams 1973, p. 71.
  18. ^ a b Bennett 2009, p. 22.
  19. ^ a b c d Williams 1973, pp. 72–73.
  20. ^ a b c d e f g Jackson 1999, pp. 63–64.
  21. ^ a b Bennett 2009, pp. 26–27.
  22. ^ "South-Western Railway". The Standard. No. 16739. 18 March 1878. p. 1.
  23. ^ Jackson 1999, p. 206.
  24. ^ Mitchell & Smith 1989, Fig. 7.
  25. ^ Jackson 1999, p. 158.
  26. ^ Jackson 1999, pp. 161–162.
  27. ^ Jackson 1999, p. 214.
  28. ^ a b Bennett 2009, pp. 88–89.
  29. ^ Jackson 1999, p. 89.
  30. ^ Mitchell & Smith 1989, Fig. 11.
  31. ^ Hornby 1995, p. 175.
  32. ^ Mitchell & Smith 1989, Fig. 10.
  33. ^ Mitchell & Smith 1989, maps.
  34. ^ a b Jackson 1999, p. 230.
  35. ^ Mitchell & Smith 1989, Fig. 8.
  36. ^ "Farnham re-signalling". RT Infrastructure Solutions. 7 March 2023 [16 February 2022]. Retrieved 21 March 2023.
  37. ^ Mitchell & Smith 1989, Fig. 31.
  38. ^ Mitchell & Smith 1989, Fig. 25.
  39. ^ Jackson 1999, p. 97.

Bibliography

Read other articles:

В Википедии есть статьи о других людях с такой фамилией, см. Мендельсон. Дэниел Мендельсонангл. Daniel Mendelsohn Дата рождения 16 апреля 1960(1960-04-16)[1] (63 года) Место рождения Лонг-Айленд, Нью-Йорк, США Гражданство (подданство)  США Род деятельности журналист, переводчик, л

 

Uncharted 4: A Thief's EndInformasi produksiPengembangNaughty DogPenerbitSony Interactive EntertainmentPengarahBruce StraleyNeil DruckmannPerancangKurt MargenauEmilia SchatzAnthony NewmanPemrogramChristian GyrlingSandeep ShekarVincent MarxenSenimanRobh RuppelErick PangilinanTate MosesianPenulisNeil DruckmannJosh ScherrKomponisHenry Jackman Data permainanSeriUnchartedPlatformPlayStation 4GenreAksi-petualanganModeSingle-player, multiplayer PerilisanTanggal rilis10 Mei 2016Uncharted Portal perma...

 

Jackie Chan is a prolific singer who started producing records in the early 80s. He started singing the theme songs over the closing credits of his films in 1980, when the film The Young Master was produced. Chan sang its theme song, titled Kung Fu Fighting Man entirely in English.[1][2] Since then he has produced over 20 different albums, singing over 100 songs in over five languages, and has teamed up with singers such as Emil Chau and the late Anita Mui.[3] His pers...

 

Italian geologist This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Torquato Taramelli – news · newspapers · books · scholar · JSTOR (December 2009) (Learn how and when to remove this template message) Torquato Taramelli Torquato Taramelli (October 15, 1845 – March 31, 1922) was an Italian geologist. Biography Taramelli w...

 

Union of Soviet Socialist Republics United Nations membershipMembershipFormer full memberDatesOctober 24, 1945 (1945-10-24) – December 24, 1991 (1991-12-24)UNSC seatPermanentPermanent Representative Andrei Gromyko(1946–48) Yakov Malik(1948–52) Valerian Zorin(1952–53) Andrey Vyshinsky(1953–54) Arkady Sobolev(1955–60) Valerian Zorin(1960–63) Nikolai Fedorenko(1963–68) Yakov Malik(1968–76) Oleg Troyanovsky(1976–86) Yuri Dubinin(1986) Alexande...

 

Sculpture in Boston, Massachusetts, U.S. Boston Massacre MonumentCrispus Attucks Monument, VictoryThe monument in 2010ArtistAdolph Robert KrausYear1889 (1889)SubjectBoston MassacreLocationBoston, Massachusetts, United StatesCoordinates42°21′15″N 71°03′52″W / 42.354284°N 71.064412°W / 42.354284; -71.064412 The Boston Massacre Monument, also known as the Crispus Attucks Monument and Victory, is an outdoor bronze[1] memorial by Adolph Robert Kraus...

 

Air Terjun Coban SritiLokasiDesa Pronojiwo, Kecamatan Pronojiwo, Kabupaten Lumajang, Provinsi Jawa Timur, IndonesiaKoordinat8°13′12.6″S 112°56′25.2″E / 8.220167°S 112.940333°E / -8.220167; 112.940333Koordinat: 8°13′12.6″S 112°56′25.2″E / 8.220167°S 112.940333°E / -8.220167; 112.940333TipePlungeTinggi total120 meter (394 ft)Jumlah titik1 (Satu)Anak sungaiSungai Besukbang Air Terjun Coban Sriti atau Coban Wolu merupaka...

 

Chinese short storyOld Man ZhuShort story by Pu Songling19th-century illustration from Xiangzhu liaozhai zhiyi tuyong (Liaozhai Zhiyi with commentary and illustrations; 1886)Original title祝翁 (Zhu weng)CountryChinaLanguageChineseGenre(s) Zhiguai Chuanqi Short story PublicationPublished inStrange Tales from a Chinese StudioPublication date1740Chronology  Fourth Sister Hu (胡四姐)   The Swordswoman (俠女) Old Man Zhu (Chinese: 祝翁; pinyin: Zhù wēng) is a shor...

 

Парламентские выборы в Индонезии (2014)2014Хронология2009 2019ИнформацияДата 9 апреляЯвка 75.11%КандидатыФото­графия Цвет Глава партии Мегавати Сукарнопутри Абуризал Бакри Прабово СубиантоПартия Демократическая партия борьбы Индонезии Голкар Движение за великую ИндонезиюМ...

 

此條目或章節為有关籌備中,拍攝中或待播的電視節目。未有可靠来源的臆測內容可能會被移除。目前記載或許與實際節目播出之內容有所出入,亦可能會隨節目的播出而變化並增添更多有效信息。 小李飞刀Legend of Dagger Lee类型古装武侠剧原作古龙《小李飞刀》导演梁耀明主演黄子腾陈祉希黄敏烨张瑞拉国家/地区 中国大陆 香港语言普通话集数20集每集长度45分钟主题曲...

 

Nepali bean soup KwatiA bowl of kwatiAlternative namesGedagudi, KwantiCoursemixed soupMain ingredientsblack gram, green gram, chickpea, field bean, soybean, field pea, garden pea, cowpea and rice bean  Media: Kwati Kwāti (Nepal Bhasa: क्वाती (where क्वा (kwa) = hot and ती (ti) = soup); Nepali: क्वाँटी; Maithili: गेडागुडी) is a mixed soup of nine types of sprouted beans. It is a traditional Newari dish consumed on the festival of ...

 

Історія Назва: Артилерійський катер «Рівне» (U-172)Будівник: Ярославський суднобудівний завод, Ярославль, СРСРСпуск на воду: 1972 р.Прийнятий: 7 жовтня 1998 р.Статус: в бойовому складі ВМС ЗС УкраїниЗауваження: колишній рейдовий катер Чорноморського флоту CPCP Основні характерис�...

 

Commuter rail service between Nashville and Lebanon, Tennessee For the American Basketball Association team, see Music City Stars. WeGo StarThree EMD F40PH locomotives in use by the WeGo Star lined up within the Lebanon, Tennessee yards. The third F40PH on the far right is a former Amtrak locomotive painted in its original Pacific Surfliner scheme which has since been repainted as of 2020.OverviewOwnerTennessee Department of Transportation (TDOT)LocaleNashville Metropolitan AreaTransit typeCo...

 

South Sudanese separatist rebel army AnyanyaThe Anyanya flag: Red was for the blood spilled in the war; green for the land; white for hope of peace; black for Africa. The buffalo symbolized strength. Variant versions had a buffalo, a snake, and arrow poison in the center,[1] or had no emblem at all.[2]FoundersJoseph OduhoJoseph LaguGeorge AkumbekJulius MorogaSeverino FuliLeadersAggrey JadenGordon Muortat MayenJoseph LaguDates of operation19 August 1963–1972HeadquartersKampal...

 

19th-century criminal organization This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Five Points Gang – news · newspapers · books · scholar · JSTOR (July 2011) (Learn how and when to remove this template message) Five Points GangMembers of the Five Points Gang of New York City.FounderPaul KellyFounding lo...

 

Grand final of the 1902 Victorian Football League season 1902 VFL Grand Final Collingwood Essendon 9.6 (60) 3.9 (27) 1 2 3 4 COL 1.2 (8) 3.2 (20) 5.5 (35) 9.6 (60) ESS 1.3 (9) 2.7 (19) 3.7 (25) 3.9 (27) Date20 September 1902StadiumMelbourne Cricket GroundAttendance35,202 ← 1901 VFL Grand Final 1903 → The 1902 VFL Grand Final was an Australian rules football game contested between the Collingwood Football Club and Essendon Football Club, held at the Melbourne Cricket Grou...

 

This article relies excessively on references to primary sources. Please improve this article by adding secondary or tertiary sources. Find sources: Association of International Marathons and Distance Races – news · newspapers · books · scholar · JSTOR (September 2015) (Learn how and when to remove this template message) The Association of International Marathons and Distance Races, also known as AIMS, is an association of the organisers of long-distan...

 

Championship game of the 2001 XFL season This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Million Dollar Game – news · newspapers · books · scholar · JSTOR (May 2016) (Learn how and when to remove this template message) Million Dollar GameThe Big Game at the End San Francisco Demons (6–6) Los Angeles Xtreme...

 

DKW

В статье не хватает ссылок на источники (см. рекомендации по поиску). Информация должна быть проверяема, иначе она может быть удалена. Вы можете отредактировать статью, добавив ссылки на авторитетные источники в виде сносок. (18 ноября 2017) Dampf Kraft Wagen Тип Публичная компания О�...

 

1975 battle in the Vietnam War Battle of Ban Me ThuotPart of the Vietnam WarA Vietnam People's Army T-54 tank during operations in the Central HighlandsDateMarch 3–18, 1975LocationBan Mê Thuột, Đắk Lắk Province, South VietnamResult North Vietnamese victoryBelligerents  South Vietnam  North Vietnam Viet CongCommanders and leaders Phạm Văn PhúTrần Văn Cẩm [vi] Hoàng Minh Thảo [vi]Vũ Lăng [vi]Strength 78,300 soldiers488 tan...