The Waterfront Barrow-in-Furness

The Waterfront Barrow-in-Furness
Project
Opening date2020 (est.)
DeveloperFurness Enterprise Ltd
ArchitectCapita Symonds
Location
Map
The Waterfront Barrow-in-Furness is located in Cumbria
The Waterfront Barrow-in-Furness
Location in Cumbria
Coordinates: 54°06′04″N 3°13′09″W / 54.1012°N 3.2192°W / 54.1012; -3.2192
CountryEngland
CountyCumbria
LocationBarrow-in-Furness
Area
 • Total
200 ha (400 acres)

The Waterfront Barrow-in-Furness is a £200 million development under construction in and around the Port of Barrow, England. The site covers an area of some 400 acres (160 ha) and was due for completion in 2020.[1] The internal road network is already complete, with construction of a large business park complex ongoing and work on a 400-berth marina and 650 home Marina Village due to start thereafter.[1] In 2010, The Waterfront Barrow-in-Furness ranked as the ninetieth most costly regeneration project in the United Kingdom by Regeneration & Renewal.[2] Progress on the project stalled between 2010 and 2016 due to complications with funding following the disabandonment of the North West Regional Development Agency.[3] BAE Systems opened a large logistics warehouse named the Resolution Building on Dova Way within the designated Business Park Area in October 2016, while and construction of a new access road from Salthouse Road to the Marina Village commenced in May 2017.[4]

Background and history

A 400-berth marina is planned for Buccleuch Dock and the Barrow Island side of Ramsden Dock. The Marina Village which will be located between Buccleuch and Cavendish Docks will contain some 650 homes, numerous shops, restaurants and hotels. A multi-purpose stadium has also been proposed to occupy the eastern part of the Marina Village. This stage of the waterfront is due for completion in late 2020.[5] A large business park on Barrow Island is expected to be the first part of the Waterfront to be fully completed. A watersports centre and wetland area to the north of Cavendish Dock are two other aspects of the development, alongside a new landmark footbridge over Bucleuch Dock to accompany the already functioning Michaelson Road bridge. However the most beneficial aspect of the Waterfront to Barrow's status as a port town is the proposed cruise ship terminal, numerous ocean liners have visited Barrow over recent years, but a designated purpose-built terminal building is hoped to significantly increase the number of liners that visit the town.[5]

For years large parts of the port of Barrow and Barrow Island in general were run down and neglected, master plans were drawn up for a new multimillion-pound development that would bring new life to the area.[6] Companies such as Cumbria Vision, West Lakes Renaissance, Barrow Borough Council and the Northwest Regional Development Agency soon became involved to raise Barrow's status as the primary gateway into the Lake District and bringing new business to the area which is seen as Britain's 'Energy Coast'.[6] This is due to the large number of local producers of energy including Barrow Offshore Wind, Rampside Gas Terminal, Roosecote Power Station and Sellafield.

Progress

The Waterfront development was approved for construction in 2007, with work beginning clearing the site the same year.[6] As of March 2010, the business parks were under construction with the new road network and all transportation links having been complete already (see Transportation section).[6]

Dozens of companies are involved in the development and construction of the site. Marketing is being led by the main developer, Furness Enterprise although it is also supported by SLPR, Bluepole and HSP Milners. Capita Symonds is the design consultant, whilst the lead contractor comes in the form of Carillion. Some local Sub Contractors include: Mike Marsh Plant Hire, Deltawaite, Neil Price and Simmonds.[7] In July 2010 there were concerns that the project could be put on hold or scrapped all together due to lack of funds as a result of government cutbacks, however plans soon emerged to go ahead with the Marina Village and fund the marina itself with receipts from property sales within the village, although this isn't expected to commence until possibly 2018.[3]

Areas of the waterfront

Business parks

There is a heavy focus on bringing new business to the area, and three business parks are to[citation needed] form a large part of the overall development. The waterfront business parks are proposed to cover a total land area of 23 hectares (57 acres).[8] The first of the business parks (Ramsden Business Park) to be built will cover an area of 8.39 hectares, and will consist of four plots ranging in floorspace from 2,050 to 8,400 square metres (22,066 to 90,417 sq ft).[8] St Andrews Business Park and Anchor Line Business Park will follow thereafter, however the exact figures and information about facilities are yet to be provided by the developer. Early estimates project each acre on the business park complex come to a cost of £100,000.[8] Companies that also have offices and a strong presence in and around the Port of Barrow include the likes of Associated British Ports Holdings, BAE Systems Submarine Solutions, James Fisher & Sons, Centrica and British Nuclear Group to name a few. The business parks are expected to create between 1,500 and 2,000 new jobs and contribute greatly to the local economy.[9] VUE Construction has been appointed to carry out phase 2 of the project, which includes decontamination, site clearance and installation of utilities. Work started in August, 2016.

Cruise ship terminal

Due to Barrow's proximity to the Lake District, it is seen[who?] as the principal gateway to the world-famous national park via sea. Numerous cruise ships have called at the port of Barrow in recent years for passengers to visit the Lake District as well as numerous more local sites such as Furness Abbey and the Dock Museum. However part of the waterfront development is to build a designated cruise ship terminal which will have facilities to handle such vessels any time of the year, and will encourage a considerably larger number of ships to visit the port.[10] The only other cruise ship terminal on the north west coast of England is in Liverpool. The initiative is being led by Cumbria Tourism which has so far invested £9 million into the project.[10] In July 2010, plans for the cruise ship terminal were put on hold until there is actual significant demand to accommodate larger vessels at the port.[11] It is the only part of The Waterfront development that has been effectively 'scrapped', as more focus is placed upon the marina and marina village.[11]

Cruise ships that have called at the port of Barrow since 2000 are:

Marina

Even before the waterfront development was proposed, there was demand[citation needed] for a new marina in Barrow. However, after it was approved, interest soared even further.[17] Eight sailing clubs reported immediate demand for berths and winter storage. The new marina will come at a cost of £8 million and will be able to accommodate up to 400 privately owned boats at any one time.[17] An overland boat lift has also been proposed with access for up to six boats simultaneously, with 24-hour-a-day access, although the construction of a short canal is currently the preferred option. Marina berths will be located on the mainland side of Buccleuch Dock, whilst further berths will be situated on the Barrow Island side of Ramsden Dock.[17]

Marina Village

The Marina Village is one of the most ambitious areas of the development. The new settlement will be home to 650 houses of varying styles and sizes (some of which can be seen in the gallery below). Based upon the average 2.5 persons per household in the UK, Marina Village will add approximately 1,500 to the local population.[17] The village will cover an area of 18 hectares (44 acres), and besides the residential buildings, will also contain a number of hotels, shops and restaurants. There will be a main village square alongside the actual waterfront with a number of smaller squares, public spaces and playground being located throughout the rest of the complex.[17] A large athletics track is also earmarked for construction, with the possibility of a large multi-purpose stadium that could be used as the joint home ground for Barrow A.F.C. and Barrow Raiders - currently at Holker Street and Craven Park respectively.[17] Work on the village started in February 2017, with road upgrades to Salthouse road and the construction of a new junction onto the site.

A new landmark footbridge across Buccluech Dock is also part of the Marina Village development; the only other crossing over the dock is Michaelson Road Bridge.[17] The planned pedestrian footbridge will serve as the most iconic piece within the waterfront development and will connect south Marina Village to the Ramsden Dock marina service area and business park complex.[17]

Nature reserve

A new wetland nature reserve is to be formed to the very north of the waterfront development. There are already two famed nature reserves in Barrow, however both are on Walney Island.[18] Cavendish Dock is used as a reservoir for Roosecote Power Station, this has in turn raised the water temperature within the Dock and created an environment of unique ecological interest.[18] £2 million is to be invested into creating the nature reserve, whilst Cumbria County Council has been made responsible for landscaping the surrounding area.[18]

Transportation

The newly constructed Harding Rise
Buccleuch Dock will soon be transformed to become part of the Waterfront Barrow-in-Furness

A £5 million access road that links Michaelson Road to the waterfront development was opened in March 2010, the link road entitled Harding Rise means the port of Barrow can be easily accessed my large good vehicles and general commuters rather than having to drive through the residential areas of Barrow Island (namely along Ramsden Dock Road).[19] Considerable amounts of landscaping have also taken place alongside the road and its adjacent pathways.[19] Harding Rise has a carriageway width of 10 metres (33 ft), whilst the main roundabout located at this entrance to the waterfront has an inscribed circle diameter of 45 metres (148 ft).[20] Two other large roads which have been complete and run through the Barrow Island part of the waterfront are Ramsey Way and Dova Way which are 10 metres (33 ft) and 7.3 metres (24 ft) wide respectively. The Marina Village will take up a large part of south-central Barrow and although many roads will be demolished, the main thorough throughs of Rawlinson Street and The Strand will remain.[20]

Bridge Road connects the waterfront development to the A590 and eventually Junction 36 of the M6 motorway. Besides road transport, the site is also in close proximity to Barrow-in-Furness and Roose railway stations. Barrow/Walney Island Airport also serves Barrow, however is used primarily by BAE Systems. The nearest international airports to the waterfront development are Blackpool International Airport, Manchester Airport and Liverpool John Lennon Airport.

Water sports centre

Water sports have been occurring in and around the port of Barrow for years, however there are no designated centres or sites for this.[21] Since 2003, Ramsden Dock has held host to the Formula 2 National Grand Prix Power Boat racing which attracted some 35,000 visitors annually. Barrow, its docks and the Walney Channel have also become ever more popular with power boat racing since speed restrictions were placed on nearby Windermere.[21] The water sports centre which forms part of the waterfront will be located on the northern side of Ramsden Dock and will cater for canoeing, sailing, wind-surfing and power boat racing.[21]

See also

References

  1. ^ a b "News". Furness Enterprise Ltd. Retrieved 2 April 2010.
  2. ^ "Top 100 Regeneration Projects 2010". Regeneration & Renewal. Retrieved 15 June 2010.
  3. ^ a b "New housing to fund Barrow waterfront regeneration". BBC. 23 July 2010. Retrieved 23 July 2010.
  4. ^ "Diggers move in as site clearance begins at Barrow Waterfront and Marina". North West Evening Mail. Retrieved 7 May 2017.
  5. ^ a b "Marina, Marina Village & Quays". Furness Enterprise Ltd. Retrieved 1 April 2010.
  6. ^ a b c d "The Waterfront". Cumbria Vision. Retrieved 1 April 2010.
  7. ^ "The Project Team". Furness Enterprise Ltd. Retrieved 1 April 2010.
  8. ^ a b c "The Business Park". Furness Enterprise Ltd. Retrieved 1 April 2010.
  9. ^ "Come and join these companies on the Waterfront". Furness Enterprise Ltd. Retrieved 1 April 2010.
  10. ^ a b "Key Facts about The Waterfront". Furness Enterprise Ltd. Retrieved 1 April 2010.
  11. ^ a b "Blow to Barrow cruise terminal plan". North West Evening Mail. 13 December 2000. Retrieved 7 July 2010.
  12. ^ a b c "Archived". Retrieved 13 May 2023.[dead link]
  13. ^ a b "Sound First Half Of The Year For Abp's North-West Ports". Associated British Ports. 3 September 2003. Archived from the original on 27 July 2011. Retrieved 13 May 2023.
  14. ^ "Archived". Retrieved 13 May 2023.[dead link]
  15. ^ "Luxury cruises in as reputation grows" (PDF). Barrow Borough Council. 2006. Archived from the original (PDF) on 15 June 2011. Retrieved 13 May 2023.
  16. ^ "Review of the year". North West Evening Mail. 28 December 2009. Archived from the original on 5 June 2011. Retrieved 13 May 2023.
  17. ^ a b c d e f g h "THE WATERFRONT". Barrow.Furness.UK. Retrieved 1 April 2010.
  18. ^ a b c "Wetland Nature Reserve". Furness Enterprise Ltd. Retrieved 1 April 2010.
  19. ^ a b "New road to unlock Barrow business park potential". Northwest Regional Development Agency. Retrieved 2 April 2010.
  20. ^ a b "Road Details". Furness Enterprise Ltd. Retrieved 2 April 2010.
  21. ^ a b c "The Water Sports centre". Barrow.Furness.UK. Retrieved 1 April 2010.

Read other articles:

Kenta NishimotoInformasi pribadiKebangsaan JepangLahir30 Agustus 1994 (umur 29)Prefektur Mie, JepangTinggi180 m (590 ft 7 in)Berat71 kg (157 pon)PeganganKananPelatihYousuke NakanishiTunggal putraRekor193 menang, 121 kalahPeringkat tertinggi9 (6 September 2018)Peringkat saat ini17 (27 Desember 2022[1])Profil di BWF Kenta Nishimoto (西本 拳太code: ja is deprecated , Nishimoto Kenta, lahir 30 Agustus 1994) adalah pemain bulu tangkis putra ...

 

Xin hãy đóng góp cho bài viết này bằng cách phát triển nó. Nếu bài viết đã được phát triển, hãy gỡ bản mẫu này. Thông tin thêm có thể được tìm thấy tại trang thảo luận. Ni no KuniBìa trò chơi ở Nhật BảnNhà phát triểnLevel-5Nhà phát hànhNamco Bandai GamesJP: Level-5Giám đốcMotomura KenNhà sản xuấtWatanabe HiroyukiLập trìnhAkasaka YasuhiroItagaki MamoruHashimoto YusukeMinh họaYanai NobuyukiKịch bảnHino Akih...

 

Lithographie von August Weger Chéri Maurice, eigentlich Charles Maurice Schwartzenberger, (* 29. Mai 1805 in Agen, Lot-et-Garonne, Frankreich; † 27. Januar 1896 in Hamburg, Deutschland) war ein deutscher Schauspieler und Theaterdirektor französischer Herkunft. Leben Chéri Maurice war ein Sohn des Kaufmanns Maurice Schwartzenberger (1780–1853) und dessen Ehefrau. Maurice kam 1824 (nach anderer Lesart 1826) nach Deutschland und ließ sich in Hamburg nieder. Der Vater pachtete in der Vors...

RaviscaninaKomuneComune di RaviscaninaLokasi Raviscanina di Provinsi CasertaNegara ItaliaWilayah CampaniaProvinsiCaserta (CE)Luas[1] • Total24,64 km2 (9,51 sq mi)Ketinggian[2]358 m (1,175 ft)Populasi (2016)[3] • Total1.376 • Kepadatan56/km2 (140/sq mi)Zona waktuUTC+1 (CET) • Musim panas (DST)UTC+2 (CEST)Kode pos81017Kode area telepon0823Situs webhttp://www.comune.raviscanina.ce.it R...

 

International sporting eventSwimming at the2003 Pan American GamesFreestyle50 mmenwomen100 mmenwomen200 mmenwomen400 mmenwomen800 mwomen1500 mmenBackstroke100 mmenwomen200 mmenwomenBreaststroke100 mmenwomen200 mmenwomenButterfly100 mmenwomen200 mmenwomenIndividual medley200 mmenwomen400 mmenwomenFreestyle relay4×100 mmenwomen4×200 mmenwomenMedley relay4×100 mmenwomenvte The Women's 400m Freestyle event at the 2003 Pan American Games took place on August 14, 2003 (Day 13 of the Games). Meda...

 

Japanese manga series For the South Korean television series, see Glass Mask (TV series). This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Glass Mask – news · newspapers · books · scholar · JSTOR (April 2016) (Learn how and when to remove this template message) Glass MaskCover of the first tankōbon volume, f...

This article contains content that is written like an advertisement. Please help improve it by removing promotional content and inappropriate external links, and by adding encyclopedic content written from a neutral point of view. (February 2023) (Learn how and when to remove this template message) LabDisk for protein structure analysis via small-angle X-ray scattering The centrifugal micro-fluidic biochip or centrifugal micro-fluidic biodisk is a type of lab-on-a-chip technology, also known ...

 

Pintura de Luis Coto en el Museo Nacional de Arte de la Ciudad de México de La Colegiata de Guadalupe. El arte mexicano es toda actividad y producto de esta que tenga tanto fines estéticos como comunicativos y que se hayan desarrollado en México, país de América del Norte. Este desarrollo se ha producido a lo largo de la historia de México con la era mesoamericana, el periodo colonial, el periodo después de la independencia de México y otros acontecimientos.[1]​ El arte mesoamer...

 

福岡県立福岡講倫館高等学校 北緯33度33分36秒 東経130度20分0.8秒 / 北緯33.56000度 東経130.333556度 / 33.56000; 130.333556座標: 北緯33度33分36秒 東経130度20分0.8秒 / 北緯33.56000度 東経130.333556度 / 33.56000; 130.333556過去の名称 福岡県早良高等女学校福岡県西福岡高等学校福岡県立西福岡高等学校国公私立の別 公立学校設置者  福岡県校訓 質実剛健...

Grande Prêmio da Françade Fórmula 1 de 2008 18º GP da França em Magny-Cours Detalhes da corrida Categoria Fórmula 1 Data 22 de junho de 2008 Nome oficial XCIV Grand Prix de France[1] Local Circuito de Magny-Cours, Magny-Cours, Borgonha-Franco-Condado, Departamento de Nièvre, França Percurso 4.411 km Total 70 voltas / 308.770 km Condições do tempo Seco a princípio, chuva fraca no final Pole Piloto Kimi Räikkönen Ferrari Tempo 1:16.449 Volta mais rápida Piloto Kimi Räikkönen Fer...

 

Media family Not to be confused with Murdaugh family. This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Murdoch family – news · newspapers · books · scholar · JSTOR (April 2016) (Learn how and when to remove this template message) MurdochCurrent regionAustralia United Kingdom United StatesPlace of originPitsli...

 

Protected area in New South Wales, AustraliaWollumbin National ParkNew South WalesIUCN category II (national park) Mount Warning as seen from the Tweed River and Point DangerWollumbin National ParkCoordinates28°23′23″S 153°16′07″E / 28.38972°S 153.26861°E / -28.38972; 153.26861Established1 October 1967 (1967-10-01)Area24 km2 (9.3 sq mi)Managing authoritiesNational Parks and Wildlife Service (New South Wales)See alsoProtected ar...

Football league seasonRegionalligaSeason1965–66ChampionsFC St. PauliHertha BSC BerlinFortuna DüsseldorfFK PirmasensFC Schweinfurt 05PromotedFortuna DüsseldorfRot-Weiß EssenRelegatedSV FriedrichsortVictoria HamburgSC TegelSC GatowViktoria 89 BerlinVfB BottropSTV Horst-EmscherSC LudwigshafenBSC OppauTSC ZweibrückenESV IngolstadtSpVgg WeidenVfR Pforzheim← 1964–65 1966–67 → Map of the five German Regionalligas from 1963 to 1974 The 1965–66 Regionalliga was the third season of the ...

 

Donald Johanos (1963) Donald George Johanos (February 10, 1928 – May 29, 2007) was a conductor and music director with the Dallas Symphony Orchestra and the Honolulu Symphony Orchestra. He was recognized for his support of contemporary classical music. He performed or conducted on at least 16 recordings.[1] Early life and career Johanos was born in Cedar Rapids, Iowa, in 1928. He attended the Eastman School of Music, receiving an undergraduate degree in violin, a master's degree in ...

 

Railway station in São Paulo, Brazil GrajaúGrajaú train station in 2022General informationLocationR. Giovanni Bononcini, 77GrajaúBrazilCoordinates23°44′15″S 46°41′51″W / 23.737377°S 46.697608°W / -23.737377; -46.697608Owned by Government of the State of São PauloOperated by ViaMobilidade (CCR)PlatformsSide platforms (1992–2001)Island platform (2008–present)Connections Grajaú Urban Bus TerminalConstructionStructure typeAt-gradeOther informationStat...

2014 film HeartbeatFilm posterDirected byAndrea DorfmanWritten byAndrea DorfmanStarringTanya DavisCinematographyStéphanie Weber BironEdited byThorben BiegerMusic byTanya Davis, Charles AustinDistributed byMongrel MediaRelease date 6 September 2014 (2014-09-06) (TIFF) Running time93 minutesCountryCanadaLanguageEnglish Heartbeat is a 2014 Canadian drama film written and directed by Andrea Dorfman. It was screened in the Contemporary World Cinema section at the 2014 Toronto I...

 

2008 single by GS BoyzStanky LeggSingle by GS BoyzReleasedAugust 15, 2008RecordedFebruary – April 2008 The Wishing Well(DeSoto, Texas)GenreSnapLength4:00LabelBatteryPolo GroundsJSwagg TeamSongwriter(s)Keithian SammonsMarcus DinkinsTelson FlowersMatthew GriffithDecory KennerCharles SmithProducer(s)Ryan ESLGS Boyz singles chronology Stanky Legg (2008) Booty Dew (2009) Stanky Legg is a song by American hip hop trio GS Boyz, released on August 15, 2008 as their commercial debut single. The ...

 

United States historic placeCongregational Church of the EvangelU.S. National Register of Historic Places September 2012Show map of New York CityShow map of New YorkShow map of the United StatesLocation1950 Bedford Ave., Brooklyn, New YorkCoordinates40°39′26.74″N 73°57′23.67″W / 40.6574278°N 73.9565750°W / 40.6574278; -73.9565750AreaLess than one acreArchitectural styleLate Gothic RevivalNRHP reference No.09001081 [1]Added to NRHPDece...

For the song, see Cruel World (song). 2005 American filmCruel WorldTheatrical release posterDirected byKelsey T. HowardWritten byEugene HessPaul LawrencePaul T. MurrayProduced byKelsey T. HowardTodd NealeyTim WesleyStarringEdward FurlongLaura RamseyDaniel FranzeseAndrew KeeganCinematographyWard RussellEdited byAndrew CohenMusic byDanny SaberProductioncompanyPrimetime PicturesDistributed byIndican PicturesRelease dates October 14, 2005 (2005-10-14) (Screamfest) September...

 

Sergey Orlovskiy tengah menjajal versi pertama kit pengembang Oculus Rift (dengan pelantang telinga terpisah).JenisLayar ikat kepalaDitemukan pada2012PenemuPalmer Luckey (pendiri)ProdusenOculus VRHargaKit pengembang versi pertama: USD300, kit pengembang versi kedua: USD350, eceran: belum diketahui (diisukan kurang dari USD300)ResolusiKit pengembang versi pertama: 1280×800 (640×800 per mata), kit pengembang versi kedua: 1920×1080 (960×1080 per mata), eceran: ≥1920×1080Medan pandang hori...

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!