You can help expand this article with text translated from the corresponding article in Chinese. (March 2011) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at [[:zh:沙坪坝站]]; see its history for attribution.
You may also add the template {{Translated|zh|沙坪坝站}} to the talk page.
1979; 45 years ago (1979) 25 January 2018; 6 years ago (2018-01-25) (renovation)
The Shapingba railway station (Chinese: 沙坪坝站; pinyin: Shāpíngbà zhàn) is a railway station of Chengyu Passenger Railway that is located in Shapingba District of Chongqing, People's Republic of China. It was originally opened in 1979 serving ground-level tracks and has been operated as part of China Railway's Chengdu Bureau. In 1988, it was renamed as Chongqing North Railway Station, but reverted to the Shapingba name when another new station in Yubei District was opened as Chongqing North railway station.[1] Serving only conventional services, the station was closed in 2011[2][3] for a major renovation and as part of an expansion of the Three Gorges Plaza commercial development. It was redeveloped as a fully Integrated Transport Hub, serving high-speed and conventional rail, metro rail services, local city buses, taxi services and personal cars, all within a major commercial and retail complex. The railway station section of this project was reopened on 25 January 2018[4] and the final retail and commercial development was completed on 30 December 2020.[5] It should not be confused with the larger Chongqing West railway station, which is also located in Shapingba District, and opened on the same day.
History
1979: Shapingba station opened.
1988: Shapingba station renamed "Chongqing North Station".
20 October 2006: The station was renamed again as "Shapingba station" with the opening of the Chongqing North Station in Yubei District
8 May 2011: The final service of the 5608 train from Chongqing bound for Nanchong before demolition of the station, platform and tracks.[6]
28 December 2012: Construction of a new Shapingba Station, as an Integrated Transport hub project, officially started.
May 2017: New station building begins track laying.[7]
October 2017: New main underground station building completed, track laying completed. Station interiors begin to be decorated.[8]
Originally built as an above-ground station, serving at-grade railway tracks. After major renovations and construction work, the current station building is mostly an underground complex serving a rebuilt sunken railway, with a retail and commercial development being built above the station complex. The redevelopment was budgeted to cost 10 Billion RMB.[9] The renovations for the station building was opened to the public on 25 January 2018.[10]
Station building
The main railway station consists of eight levels, one at ground level and seven underground levels. There are also 34 self-service gates in the waiting room. In the waiting area and at platform level, it is equipped with 8 barrier-free elevators and 13 escalators to facilitate passenger movements. Public toilets (including barrier-free toilets) been built at the Front Entrance, the Waiting Hall, Transfer Hall, Taxi Station and on the Bus Station levels. Parenting rooms are present in the Waiting Room and Transfer Hall. A temporary shopping area is present in the Waiting Room too. Parking for 800 vehicles is provided over four levels.
The bus station serves only local city bus services on 27 routes and an Airport Express bus to Chongqing Jiangbei Airport's Terminal 3. There are another two additional city bus stations externally to the station along the West and South Roads serving the station. Long distance buses are found at Chongqing West, Chongqing North and Chongqing railway stations.
Commercial and retail development
Above the station, two office towers and a retail development is under construction. Called the Shapingba Twin Towers, it is a first in China for such a mixed commercial development, as part of a railway station. The northern side of the station will also feature an open public space as part of an expansion to the existing Three Gorges Plaza. Construction of this development is expected to be complete by 2020.