The Indian 5/8th Gorkha Rifles, 14th Mechanised Infantry and elements of the 23rd Mechanised Infantry, together designated as INDBATT-1, had been sent to Sierra Leone to aid the government in the disarmament of the RUF rebels. Two rifle companies had been kept as a quick reaction force. Elements of the 9th Para (SF), were also included.[5]
By mid-April 2000, two of the companies of INDBATT-1 were deployed in Kailahun, while the rest were deployed in Daru. On May 1, elements of the RUF attacked and overran the KENBATT forces at Makeni. Due to a communication gap, the INDBATT-1 were not informed, and some of their commanders at Kailahun were captured the next day at a meeting with the RUF. Within ten days of this, some of the hostages were released due to intense pressure by INDBATT-1 and civilians; however, some, including the 2IC who had gone to negotiate, remained in 'honourable custody', being allowed to return to the base every day.[5]
The situation worsened when the RUF disarmed 500 Kenyan peacekeepers and began advancing towards Freetown. As panic broke out, British troops evacuated the civilian staff at Freetown. The INDBATT-1 QRF was launched to Magburaka, where more Kenyans had been besieged. They made a 180-kilometer advance, pushing back several ambushes, and rescued the Kenyans. However, the situation at Kailahun kept deteriorating, and the two companies of 5/8th Gorkha Rifles remained in their base surrounded by hundreds of RUF rebels of the 1st Brigade.[5]
Negotiations with the RUF rebels to release the 2IC and his party lasted seventy-five days, but were ultimately successful due to the involvement of Charles Taylor and Liberia.[citation needed] Meanwhile additional forces ex India were built up to launch operations to seize control over nearly 100 km of jungle track to break the siege at Kailahun.[1]
Order of battle
RUF Forces
The RUF rebels had six brigades, one of which were deployed in the sector. This brigade consisted of four main battalions, and one Strike Battalion. They were armed with AK-47s, RPGs, APCs, and SAMs. Each battalion was deployed in a particular area:
Elements of D Squadron of the British SAS;[5] These units guided the Aviation units during their tasks[7]
Plan of Operations
The battle was planned to involve five phases:
Phase I: Mobilisation of UNAMSIL forces.
Phase II: Pre-emptive strikes by the helicopters, and breakout by the besieged forces at Kailahun. The UNAMSIL forces were to secure the area for a clear extraction.
Phase III: Link up of the besieged Kailahun column and Special Forces units at Giehun. 5/8 Gorkha Rifles (Daru column) to secure Pendembu.
Phase IV: Link up of Daru column and Kailahun column at Pendembu. Extraction to begin by air.
Phase I of the operation was the buildup of forces. Between 13th and 15th, the UNAMSIL forces were assembled at Daru and Kenewa. The IAF and RAF Aviation units were critical in the buildup, especially at Daru, since the area was cut off from the rest of the UN-controlled areas. By midnight, 14 July, the buildup was complete.[3][5]
The role of 2 Para (SF)
The mission was conducted in a classical VUCA environment, in the absence of geographical information, using tourist maps and borrowing equipment from friendly nations. 2 Para (SF) collected valuable intelligence by conducting reconnaissance and inserting its commandos for seven days at a stretch into the camp in disguise, prior to the launch of the operation, to map the area, carry out liaison and collect intelligence which enabled the planning and execution of what would become one of the most daring special operations conducted by the Indian Army on foreign soil.
The units at Kailahun were informed of the plan, and constantly kept in touch with the HQ through satellite phones. The operational plans were conveyed in Malayalam to overcome RUF monitoring of communications. Since the operation required insertion by helicopters, the two companies at Kailahun were required to fall back 500 metres from the town itself, and secure two helicopter landing zones.[5]
On 15 Jul 06:00, before first light, 80 special forces personnel from 2 Para (SF) were inserted into enemy territory by two British Chinook helicopters. The air assault was carried out under adverse conditions, with heavy rain and poor visibility, and without air and artillery support which had to be withdrawn at the last minute due to the inclement weather. The flight time of 25 minutes was extended to 50 minutes and the team commander of 2 Para (SF) stuck to his commitment despite the danger of getting daylighted and having to fight without external support. Forty SF personnel were inserted close to village Jimila (2514), another thirty-four were inserted at the Bandajuma track junction (2512), and the remaining six were inserted inside the hostage camp to enable the extrication of military observers and others. Last-minute changes in plan and the cancellation of MI-8 helicopters meant that the young lieutenant of the Special Forces had to personally inform the change in plan and lead the break out column until the centre of the town.
The use of SAS-supplied phosphorus grenades by 2 Para (SF) quickly laid waste to the camp and denied any UN stores and supplies that would be left behind from falling into RUF hands.
Meanwhile, the forty SF operatives encountered heavy resistance from the RUF who were mobilised once the surprise was lost, clearing the road axis and successfully securing the town centre of Kailahun. At the same time, the second team, dropped at Bandajuma, split into two groups. The first secured the track junction, while the second went ahead to clear the axis till Kenewa. With the Chinooks safely taking off with the eleven military observers along with their equipment, the six SF operatives led the break out of IND BATT with their BRDMs in close support in trace and affected a link-up with the forty SF operatives at the town centre amidst fire from all directions.
The move of the INDBATT breakout column was secured by the Special Force both at the van and the rear. This ensured that the tired hostages were kept safe from any possible assault from the now-active enemy. The INDBATT column thus secured at both ends was now under hot pursuit from the RUF rebels and caught up with the rear of the foot column approximately 5 km south of Kailahun. 2 Para (SF), under the leadership of its second in command, started laying booby-traps along the road in the rear to slow down the RUF advance. The ensuing firefight resulted in major losses to the RUF after which they abandoned the chase.
The weather cleared at 09:30, and the UN helicopters were now available for providing much-needed air support to the advancing column. The RUF Forces reorganised, taking advantage of dense jungle and knowledge of jungle tracks to constantly snipe at the rearguard, making the Indian advance difficult and slow. The Indian MI-35 attack helicopter on the scene provided fire support to the advancing columns, making their advance much swifter. At 09:45 hours, the attack helicopters were tasked to provide covering fire to the Mi-8 helicopters as one company of 18th Grenadiers, part the INDBATT-2, was airlifted and dropped off north-east of Giehun, where they awaited the arrival of the Kailahun column.
At approximately 10:20, nearly four hours ahead of schedule, 2 Para (SF) linked with the 18th Grenadiers at Giehun (1807), which had landed there at around 10:00. The force commander landed at Geihun to congratulate the SF team commander for an excellent operation.
After the airlift, the column reorganised and advanced towards Pendembu. They were faced with two major roadblocks along the road, the first was an 8-foot-deep ditch, and the second, a 4-foot-deep one, each covered by troops with small arms and RPGs. Continuous sniping and slushy roads hampered the progress, but the column secured the area, and using bridging stores carried in the column and dropped by the MI-8s, the units crossed the bridges, and continued on their way.[1][5]
Daru Column
At 06:20, after the extraction of personnel at Kailahun, the INDBATT-2, INDMECH QRC (Mech-2 company), and the rest of the 5/8th Gorkha Rifles (Mot-2 company) at Daru, commenced their operations. The 18th Grenadiers, alongside Infantry Fighting Vehicles from the Mech-2, and aided by artillery bombardment, secured a firm base along the road.[5]
Immediately after securing the base, the Daru Column advanced along the road, with Mech-2 company's IFVs leading the advance. At 08:30, the column came under heavy fire from the north of the road, 500 metres short of Tikono. The IFVs neutralised the enemy and continued. The unit faced heavy resistance at both Bewobu, and Kuiva, but broke through with ease. Though the plan originally called for a physical capture and search of Kuiva, the speed of the advance of the Kailahun column, indicated a possibility of a link-up and evacuation on the same day. So the Daru column continued to advance quickly to Pendembu. Though the rebels had dug in positions in the town, they fled in the face of small arms fire by the column, and supporting fire from nearby mortars.[5]
The column continued to move towards Area 3 bridges, suppressing enemy fire with their IFVs, while 9th Para, part of the battalion's QRC, was airlifted from Daru in 3 Mi-8s, and secured the bridges in Area 3. Maintaining momentum, the column met up with the QRC forces near the bridges at 1230 hours, and continued onwards to Pendembu.[3][5]
Securing Pendembu
The Daru column and the QRC reached Pendembu, and prepared to assault the town. It was the HQ of the RUF 1st Brigade, and heavily defended. At 13:00 hours, an attack helicopter made five passes over the town strafing the defenders, and performed pinpoint engaging of the defenders in their entrenched positions. Meanwhile, the mortars relocated to a location north of the Area 3 bridges. Mot-2 Company was to attack and secure the nearly 300 houses of the town, as well as an air head to the south-west. Mech-2 moved in from the north, and neutralised all the targets, and occupied the northern side of the town. Mot-2 moved up and silenced the enemy positions in the south-west corner, using the IFVs, and then cleared the houses systematically with its riflemen. 4th Platoon of Mot-2, killed several rebels in the south-west pocket, and several more were killed in the armoury, cleared by 6th Platoon. A suitable airhead was established along the Daru-Pendembu road. All units linked up in the south-west corner, and reorganised into defensive positions for the evening.[3][5]
At about 16:30 hours, the Daru Column personally led by the Commanding Officer of 5/8 Gurkha Rifles advanced through the jungle to link up with Kailahun column. A link up was established at 17:30 hours, and the entire force was gathered back at Pendembu by 19:00 hours. The units took up defensive positions around and inside Pendembu. Any attempts by the RUF to counter-attack were thwarted with accurate fire from the troops. The routes used by the RUF for reinforcements were constantly kept under surveillance by the scout helicopter. On two occasions regrouping militia were observed approaching Pendembu by the scout helicopter which directed the Mi-35 to carry out dissuading attacks on them using rockets and guns. Approach paths to the town were shelled by mortars and a 105 mm Light Field Gun throughout the night.[5]
Helilift operations
The next day, 16 July, at 07:00 hours, Mot-2 secured an airhead and also prepared a helipad as well as readjusted the defences to prepare for the forthcoming helilift extraction. At 08:15 hours, Mil Mi-8 helicopters began arriving to extract the units. In 12 sorties, Mech-1 Company, Mot-1 Company, SF Company, D Company of the 18th Grenadiers, and 2 Platoons of QRC Company were extracted. At 09:30 hours, 50–60 enemies were spotted to the north of the town and effectively neutralised by the attack helicopters directed by Adjutant-GLO of 5/8GR and MFC grouped with Mech 2 ICVs which also brought down heavy fire. The last Mi-8s took off at 10:30 hours. The Gurkha battalion pioneers demolished the selected RUF bunkers, and the RUF ammunition store.[3][5]
Move to Daru
After the last helicopter took off the remaining troops, consisting of Daru Column of 5/8th Gorkha Rifles, D-Company of the 18th Grenadiers, remaining QRC Companies, and the vehicles of the Kailahun Companies, began to make their way back to Daru, with Mot-2 in the lead. Mech-2 was to hold on to the northern edge of town, and then bring up the rear of the column, after a tactical disengagement. The column was constantly supported by one Mi-35 helicopter at all times. After neutralising enemies at the bridges, the column reached Kuiva without incident. At Kuiva, the Mi-35 helicopter and the IFVs blind fired on any suspected enemy positions repeatedly to ensure the safety of the column.[3][5]
Despite the firm base being secured by 18th Grenadiers, the columns were ambushed near Kuiva. At 14:00 hours, scout helicopters reported that the road between Kuiva and Bewabu had been dug up. The 18th Grenadiers secured the roadblock position, but the column had to be halted as they had stretched over too long a distance. At this time, one of the vehicles was attacked by an RPG. The Mi-35 operating overhead was immediately called upon to engage the ambushing militia. The riflemen and IFVs cleared any remainder ambushing forces. Under the cover of helicopters the column continued to advance towards Daru.[5]
At 14:30 hours, near Bewabu, the leading IFVs came across a ditch, covered by heavy small arms fire from higher ground on both sides. The Commanding Officer realised that his troops were in the kill zone. He immediately sent 4 Rifle Platoon to engage the enemy targets. The firefight continued for fifteen minutes, and the Mi-35 strafed enemies on both sides of the road. 6 Platoon and INDENG units bridged the gap, and the column immediately set off.[5]
While the 5/8th Gorkha Rifles engaged the enemy at Bewabu, the 18th Grenadiers about six kilometers behind, supported by 2 BMPs from Mech-2, and 2 BRDMs of Mech-1, were engaged by enemy units just short of Kuiva. The units fought the enemy for about ten minutes, and continued to advance. About 500 metres from here, a vehicle carrying ammunition was hit by an RPG. Once again the Mi-35 was called upon and it carried out a strafing run in the direction of attack. No further opposition was encountered after this. The casualty was evacuated by a Chetak.[5]
The convoy continued the rest of the way uneventfully. By 17:30 hours, all the units had safely reached Daru.[3][5]
Aftermath
The Indian operation was a complete success. All the besieged forces were evacuated successfully, with one casualty, and the rescue was a tremendous boost to UNAMSIL morale.[5][8] The Indian Forces were met with a rapturous welcome as they marched triumphantly into Daru. It was the worst defeat the RUF has suffered.
The people of Sierra Leone helped build the Khukri War Memorial on the bank of the River Moa. The memorial honors Hav Krishan Kumar, who died during the operation.[5]
Punia, Major Gen. Rajpal; Punia, Damia (2021). Operation Khukri: The True Story behind the Indian Army's Most Successful Mission as part of the United Nations. Penguin Random House India. ISBN9789354920981.
Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!