Manitoba Hydro Place

Manitoba Hydro Place
Manitoba Hydro Place as seen from Portage Avenue, May 2022
Map
General information
TypeOffice tower
Location360 Portage Avenue
Winnipeg, Manitoba
R3C 0G8
Coordinates49°53′32.63″N 97°8′47.04″W / 49.8923972°N 97.1464000°W / 49.8923972; -97.1464000 (Manitoba Hydro Place)
Construction startedAugust 2005[1]
CompletedDecember 22, 2008 (first occupancy)[1][2]
OpeningSeptember 29, 2009[3]
CostC$278m.[4]
OwnerManitoba Hydro
Height
Roof377 ft (115 m) (solar chimney)
Technical details
Floor count24 (22 + 2 Mechanical)
Floor area695,250 sq ft (64,591 m2)
Design and construction
Architect(s)
[5][6][7]
Structural engineerCrosier Kilgour/Halcrow Yolles
Main contractorPCL Construction Management

Manitoba Hydro Place (MHP) is an office tower serving as the headquarters building of Manitoba Hydro, the electric power and natural gas utility in the province of Manitoba, Canada. Located at 360 Portage Avenue in downtown Winnipeg and connected to the Winnipeg Walkway system, Manitoba Hydro Place received LEED Platinum certification in May 2012, making it one of the most energy-efficient office towers in North America.[8]

Opened as Winnipeg's 4th tallest building in September 2009,[8] the 21-story office tower brought together 1,650 employees[3] from 15 suburban locations[9] into one 695,000 sq ft (64,568 m2) high-rise on a full, downtown block. With the design's plan view resembling a capital letter "A", the project comprises two 18-storey twin wings framing three 6-storey, south-facing atria (winter gardens). The design's stepped, three-storey, street-scaled podium[10] contains retail space as well as an interior pedestrian street and a single level of parking, partially below grade — over which sit the atria, office wings and their 3-storey mechanical penthouse.[11] Total project cost was C$278m.[4]

The building's bioclimatic, energy-efficient design features a 377 ft (115 m) tall solar chimney, a geo-thermal HVAC system using 280 five-inch tubes bored 380 feet into an underground aquifer,[12] 100% fresh air (24 hours a day, year-round, regardless of outside temperature)[10] and a one-meter-wide double exterior wall with computer-controlled motorized vents that adjust the building's exterior skin throughout the day and evening. Together, the various elements of the design enable a 70% energy savings over a typical large office tower.[13]

In 2009, CBC News called Manitoba Hydro Place one of "the most energy-efficient office towers in the world"[14] and the Toronto Star called MHP the "most important building in Canada."[12]

Background and design process

Construction of a downtown headquarters building was integral to the 2002 purchase agreement between Manitoba Hydro and the City of Winnipeg for purchase of the formerly city-owned electric utility, Winnipeg Hydro.[15]

Manitoba Hydro representatives toured to Europe to identify examples of energy efficient design a year prior to beginning the architect selection process.[15]

Subsequently, the company assembled an integrated design team including members from the corporation itself along with the design architects, the architects of record, energy engineers, building system engineers, cost estimators, and project contractors — selecting the Design Architect first:[15] Kuwabara Payne McKenna Blumberg Architects of Toronto.[7][5][16][6][17] Smith Carter Architects of Winnipeg was the Architect of Record.

By December 2003, the design team had selected the final site,[1] and by 2004, Manitoba Hydro unveiled a series of design concepts for the building,[1] having created a design brief for the building:

Manitoba Hydro's new head office building in downtown Winnipeg will be a functional, state-of-the-art energy efficient (Power Smart) cost-effective structure that embodies and demonstrates Manitoba Hydro's commitment to sustainable development. While meeting the business needs of Manitoba Hydro, the office building will have a positive impact on the future of Winnipeg's downtown and be a source of pride for Manitobans. (Client Brief, 2004)[15]

The brief was developed into a project charter defining the project's core principles and against which design concepts would be measured: that it would be flexible and adaptable to new technology and workplace changes,[15] offer world-class energy efficiency,[15] offer a signature design to enhance the image of the company and the city,[15] help strengthen the city downtown,[15] and be a solid financial investment.[15]

The company committed one year to developing the building concept, using another year to ensure the concept integrated the key elements, including architectural, structural, energy performance, cost, constructability, and LEED factors. Sixteen alternatives were developed, subsequently reduced to three options from which the final concept was selected.[15]

Energy efficient design

To meet its initial design target, that of a sustainable, energy-efficient building, Manitoba Hydro Place (MHP) was developed using an Integrated Design Process to optimize the building's massing, orientation and exposed thermal mass and to use digital analysis and computerized building management systems to increase its efficiency.[10] MHP integrates passive elements (e.g., the south-facing winter gardens, natural daylighting, and the solar chimney) as well as active systems (e.g., dimmable, programmable fluorescent lighting and a computer-operated building management system).[10]

See: Conceptual diagram of building systems at MHP

Key specifics of the design include siting of the building to take advantage of prevailing winds and solar gain, minimizing north-facing surface area, using the building's south-facing atria to provide and precondition the building's constant fresh-air supply and using several 24-meter-tall waterfalls to humidify and dehumidify the fresh air intake.[18] Green roofs at the base of the building use plants to reduce stormwater runoff and minimize the building's heat-island effect, including such native prairie plants as sweet grass.[19]

The design uses the building's concrete thermal mass to mitigate extreme temperature swings and integrate radiant heating and cooling systems,[15] with a solar chimney to provide 100% fresh air by moving exhaust air to the bottom of the chimney to combine with the atria's preconditioned air and preheat incoming cold air to within room temperature,[15] and employing geothermal technology via a closed loop system of 280 boreholes, six inches in diameter (variously reported as five inches in diameter), 400 feet deep, located between elements of the foundation. The geo-thermal boreholes are filled with tubing carrying glycol, which extracts heat from the building in warmer months while warming the thermal mass of the floor slabs radiantly in colder months. Heat pumps and exchangers maximize the system's efficiency, providing conditioned water that is then circulated in tubes in the exposed ceiling slabs, providing 100% of the mechanical temperature conditioning.[15]

MHB features a high performance building envelope with a glass skin that is effectively triple-glazed — where the interior layer is single-glazed and separated from the double-glazed exterior layer by a one meter wide buffer zone. Windows at the east and west include operable sashes of both motorized, centrally controlled panels in the outer glazing and manually operated panels at the inner glazing as — well as shading located in the interstitial space.[10] The floor plan shapes themselves (also known as floorplates) of MHP are shallow, with a distance of 11 meters from the face of the building to its interior core, facilitating natural daylighting.[19]

Other systems integral to the design include high ceilings to maximize natural lighting, exterior walls of low-iron glass for maximum solar gain, automated solar shading, raised floors with a displacement ventilation system, high-output lighting with occupancy and light sensors on each fixture, a computer-based building management system to coordinate operation of energy management and building systems as well as a group of green roofs at the building's podium.[20]

To achieve personal comfort levels, users have access to the operable elements of the façade and receives natural lighting 80% of normal office hours. In addition to the operable sashes, users can control their immediate environment via task lighting, shading devices and user-operable floor grilles.[15]

Incidental to the building design itself, another idea behind MHP was indirect energy savings the project would facilitate by combining 15 disparate company entities in a single downtown location. Before MHP opened, 95 percent of the employees commuted to work via automobile.[19] After working at the new building for less than half a year, 50% of commuters were using forms of transportation other than the automobile.[19]

MHP energy use

MHP targets electric usage less than 100 kWh/m2/a compared to 400 kWh/m2/a for a typical large scale North American office tower, located in a more temperate climate.[10]

Specifically, the average cold-climate Class A Canadian office uses 400–550 kWh/m2 per year.[19] A typical office space in Manitoba uses 495 kWh/m2 per year. Five years before the MHB was designed the typical office space in Canada utilized used 550 kWh/m2 per year.[19] Because of recent work to reduce energy consumption in Winnipeg, a typical office highrise in the city uses approximately 325 kWh/m2 annually.[19] Current annual Canadian energy targets for Class A office towers are 260kWh/m2.[19]

MHP projected an annual use of 88 kWh/m2 per annum, exceeding the Model National Energy Code for Buildings (MNECB) by 66%.[19]

The building targets Leadership in Energy and Environmental Design (LEED) certification at the platinum level, the highest level of a four tier rating system. On May 25, 2012, MHB was finally awarded formal certification,[21] achieving LEED Platinum, the first office building in North America to do so. As part of their announcement, it was confirmed that their annual energy use is 85 kWh/m2, slightly lower than anticipated.[21]

Cost

MHP was constructed at a cost of C$278 m,[4] or $400 per square foot.[19] This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly.[19] The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.[19]

During the initial phase of construction, in 2006, engineers discovered a higher water table than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.[22]

Awards

  • 2009 Council on Tall Buildings and Urban Habitat (CTBUH)'s Best Tall Building Americas award. At the time, CTBUH said Manitoba Hydro Place "was designed to be completely site specific. The design could not be transplanted to another city and still work, thus making it the perfect response to the seeming homogenization of the world's skylines."[14]
  • 2008 IBS Award, Highly Commended[12]
  • 2009 Building of the Year, Office Category by Arch Daily.[10]
  • 2010 American Institute of Architects Committee on the Environment (COTE), Top Ten Green Buildings.[9]
  • 2010 Sustainable Architecture & Building Magazine Award, Project Winner[12]
  • 2010 Royal Architectural Institute of Canada, National Urban Design Award[23]
  • 2010 the SAB (Sustainable Architecture and Building) Canadian Green Building Award.
  • Engineers Canada – National Project Achievement Award[23]
  • 2010 ACEC Canadian Consulting Engineering Award – Buildings[12]
  • 2011 Royal Architectural Institute of Canada, Innovation in Architecture[12]
  • Canadian Consulting Engineering – Award of Excellence[23]
  • Association of Consulting Engineering Companies – Manitoba (Consulting Engineers of Manitoba) – Keystone Award and Award of Excellence[23]
  • Consulting Engineers of Alberta – Award of Excellence Sustainable Design[23]

See also

References

  1. ^ a b c d "Manitoba Hydro Place, Timeline". Manitoba Hydro. Archived from the original on 2012-04-03. Retrieved 2011-10-09.
  2. ^ "Manitoba Hydro Place, p. 3" (PDF). Smith Carter Architects. Archived from the original (PDF) on 2012-04-25. Retrieved 2011-10-09.
  3. ^ a b "Hydro unveils new building". Winnipeg Free Press, 9-30-2009, Geoff Kirbyson.
  4. ^ a b c "Manitoba Hydro Place, Office and Retail Tower, Winnipeg, Canada". Designbuild-network.com.
  5. ^ a b Manitoba Hydro Place at Structurae. Retrieved May 30, 2021.
  6. ^ a b "Manitoba Hydro Headquarters". SkyscraperPage. Retrieved May 30, 2021.
  7. ^ a b "Manitoba Hydro Tower". Emporis. Archived from the original on June 4, 2021. Retrieved 2021-05-30.
  8. ^ a b "More Than Skin Deep". Architectural Record, July 2010. Archived from the original on 2013-01-19. Retrieved 2011-10-09.
  9. ^ a b "Manitoba Hydro Place". American Institute of Architects.
  10. ^ a b c d e f g "Manitoba Hydro Place wins architecture award". Arch Daily.
  11. ^ "Manitoba Hydro Place". KPMB Architects.
  12. ^ a b c d e f "Canada's Most Important Building". Toronto Star, December 19, 2009, Christopher Hume. Archived from the original on April 25, 2012. Retrieved October 9, 2011.
  13. ^ "2009 Best Tall Building Americas". Council on Tall Buildings and Habitat.
  14. ^ a b "Manitoba Hydro / KPMB Architects". CBCnews Canada. 10 July 2009.
  15. ^ a b c d e f g h i j k l m n "Manitoba Hydro Place Integrated Design Process Exemplar" (PDF). 26th Conference on Passive and Low Energy Architecture, Quebec City, Canada, 22–24 June 2009.
  16. ^ "Manitoba Hydro Place". CTBUH Skyscraper Center. Retrieved May 30, 2021.
  17. ^ "360 Portage". winnipegarchitecture.ca. Winnipeg Architecture Foundation. Retrieved May 30, 2021.
  18. ^ "Manitoba Hydro Place". Buildinggreen.com.
  19. ^ a b c d e f g h i j k l "Climate-controlled". CanadianArchitect.com.
  20. ^ "Building Features". Manitoba Hydro. Archived from the original on 2011-12-03. Retrieved 2011-10-09.
  21. ^ a b "Manitoba Hydro Place sets new record with LEED Platinum". WINNIPEG, May 25, 2012 /PRNewswire/.
  22. ^ "Manitoba Hydro Place, Building Facts". Manitoba Hydro.
  23. ^ a b c d e "Manitoba Hydro Place". AECOM.

Read other articles:

العلاقات القيرغيزستانية المنغولية قيرغيزستان منغوليا   قيرغيزستان   منغوليا تعديل مصدري - تعديل   العلاقات القيرغيزستانية المنغولية هي العلاقات الثنائية التي تجمع بين قيرغيزستان ومنغوليا.[1][2][3][4][5] مقارنة بين البلدين هذه مقارنة عامة ومر...

 

Miss MermaidPoster promisiGenreMelodrama Romansa Keluarga PembalasanDitulis olehIm Sung-hanSutradaraLee Joo-hwanPemeranJang Seo-hee Kim Sung-taekPenata musikOh Jin-wooNegara asalKorea SelatanBahasa asliKoreaJmlh. episode256ProduksiProduser eksekutifLee Jae-kapDurasi30 minutesRilisJaringan asliMunhwa Broadcasting CorporationRilis asli24 Juni 2002 (2002-06-24) –27 Juni 2003 (2003-6-27)Pranala luarSitus web Miss Mermaid (Hangul: 인어아가씨; RR: I...

 

Baleia-bicuda-pigmeia Estado de conservação Espécie pouco preocupante (IUCN 3.1)[1] Classificação científica Domínio: Eukaryota Reino: Animalia Filo: Chordata Classe: Mammalia Ordem: Artiodactyla Infraordem: Cetacea Família: Ziphiidae Gênero: Mesoplodon Espécies: M. peruvianus Nome binomial Mesoplodon peruvianusReyes, Mead, and Van Waerebeek, 1991 A baleia-bicuda-pigméia (Mesoplodon peruvianus) é um cetáceo da família dos zifiídeos (Ziphiidae) encontrado nas águas do...

米哈伊爾·米哈伊洛維奇·索莫夫出生1908年4月7日[儒略曆3月25日]莫斯科逝世1973年12月30日(1973歲—12—30)(65歲)列宁格勒国籍 蘇聯职业極地探險家奖项 米哈伊爾·米哈伊洛維奇·索莫夫(俄語:Михаил Михайлович Сомов,1908年4月7日—1973年12月30日),生於俄羅斯莫斯科,為蘇聯海洋學家、極地探險家暨地球物理學學者。 簡歷 米哈伊爾·索莫夫於1937年畢業於莫...

 

Trausse Tour de Trausse Blason Administration Pays France Région Occitanie Département Aude Arrondissement Carcassonne Intercommunalité Carcassonne Agglo Maire Mandat Jean-François Saïsset 2020-2026 Code postal 11160 Code commune 11396 Démographie Gentilé Traussois Populationmunicipale 598 hab. (2020 ) Densité 56 hab./km2 Géographie Coordonnées 43° 18′ 46″ nord, 2° 33′ 44″ est Altitude Min. 127 mMax. 322 m Superficie 10,70&...

 

Sukhoi Su-35Sebuah Su-35S milik Angkatan Udara RusiaTipePesawat tempur multiperan, pesawat tempur superioritas udaraPerancangBiro Desain SukhoiTerbang perdanaSu-27M: 28 Juni 1988Su-35S: 19 Februari 2008DiperkenalkanFebruari 2014StatusDalam layananPengguna utamaAngkatan Udara RusiaPengguna lainAngkatan Udara TiongkokAngkatan Udara MesirJumlah produksiSu-27M: 15[1] Su-35S: 139[2]Harga satuanSU-35 (US$83 juta) (Rp1,29 Triliun)[3] SU-35S (US$85 juta) (Rp1,35 triliun)[4...

2011 Japanese filmSchoolgirl ApocalypseTheatrical posterDirected byJohn CairnsWritten byJohn CairnsProduced byYuki KitoExecutive producers:Daniel IsaacsenYojiro SuzukiStarringHigarinoMai TsujimotoProductioncompanyLantis KKRelease date July 2011 (2011-07) (BiFan Film Festival) Running time86 minutesCountryJapanLanguageJapanese with English subtitles Schoolgirl Apocalypse (セーラー服黙示録, Sērā-fuku mokushiroku, Sailor suit Apocalypse) is a 2011 Japanese zombie film wri...

 

German football club Football club1. FC Union SolingenFull name1. Fußball Club Union Solingen 1990 e.V.Founded1990Dissolved2012GroundStadion am Hermann-Löns-WegCapacity15,000 Home colours Away colours 1. FC Union Solingen was a German association football club from Solingen, North Rhine-Westphalia. History The club was founded in 1990 in the aftermath of the bankruptcy of SG Union Solingen by former members of that club.[1] 1. FC Union Solingen also failed and was dissolved in 2012&...

 

1980 British television play based loosely on Alan Turing This article is about the 1980 television play. For the 2014 film, see The Imitation Game. First edition (containing the title play)(publ. 1981 by Jonathan Cape) The Imitation Game is a television play written by Ian McEwan and directed by Richard Eyre, a BBC Play for Today, first broadcast on 26 April 1980. Plot It is 1940 in Frinton and 19-year-old Cathy Raine turns down a job at the local munitions factory and, much to the consterna...

Mashhad Metro station 36°18′0.61″N 59°33′47.96″E / 36.3001694°N 59.5633222°E / 36.3001694; 59.5633222 Palestine Metro Stationایستگاه مترو فلسطینMashhad Metro StationGeneral informationLocation Felestin Sq.Districts 1-9, Mashhad, Mashhad County IranOperated byMashhad Urban Railway Operation Company(MUROC)Connections Mashhad City Buses[1][2]  1  Ghadir-Vakil Abad (Express)  10  Ghadir-Vakil Abad  ...

 

Untuk kegunaan lain, lihat Sukamaju. SukamajuKelurahanPeta lokasi Kelurahan SukamajuNegara IndonesiaProvinsiSumatera UtaraKotaMedanKecamatanMedan JohorKodepos20145Kode Kemendagri12.71.11.1001 Kode BPS1275020004 Luas1,52 km²Jumlah penduduk10.659 jiwa (2020)Kepadatan6.953 jiwa/km² Sukamaju adalah nama kelurahan yang ada di kecamatan Medan Johor, Medan, Sumatera Utara, Indonesia. Pada tahun 2020, kelurahan ini mempunyai penduduk sebesar 10.659 jiwa, dengan luas wilayah 1,52 km² dan ...

 

Distrito Judicial de Piura LocalizaciónPaís PerúInformación generalTipo Demarcación administrativaOrganizaciónPresidente Claudia Cecilia Morán Morales de VicenziEntidad superior Corte Suprema de JusticiaHistoriaFundación 31 de octubre de 1874 (149 años)Sucesión Distrito Judicial de Piura→ Distrito Judicial de Tumbes (2001) Distrito Judicial de Sullana (2010) Sitio web oficial[editar datos en Wikidata] El Distrito judicial de Piura es una división administrativ...

American television series TrinketsGenreTeen dramaCreated by Amy Andelson Emily Meyer Kirsten Kiwi Smith Based onTrinketsby Kirsten Kiwi SmithStarring Brianna Hildebrand Kiana Madeira Quintessa Swindell Brandon Butler Odiseas Georgiadis Larry Sullivan Dana Green Linden Ashby October Moore ComposerKeegan DeWittOriginal languageEnglishNo. of seasons2No. of episodes20ProductionExecutive producers Amy Andelson Emily Meyer Linda Gase Kirsten Kiwi Smith Shelley Zimmerman Rebecca Glashow Brin Lukens...

 

1653 treaty between Brandenburg and Sweden The former Duchy of Pomerania (center) partitioned between the Swedish Empire and Brandenburg after the Treaty of Stettin in 1653. Swedish Pomerania (West Pomerania) is indicated in blue, Brandenburgian Pomerania (East Pomerania) is shown in orange. The Treaty of Stettin (German: Grenzrezeß von Stettin) of 4 May 1653[1] settled a dispute between Brandenburg and Sweden, who both claimed succession in the Duchy of Pomerania after the extinctio...

 

Artikel ini membutuhkan rujukan tambahan agar kualitasnya dapat dipastikan. Mohon bantu kami mengembangkan artikel ini dengan cara menambahkan rujukan ke sumber tepercaya. Pernyataan tak bersumber bisa saja dipertentangkan dan dihapus.Cari sumber: Spermatogenesis – berita · surat kabar · buku · cendekiawan · JSTOR artikel ini perlu dirapikan agar memenuhi standar Wikipedia. Tidak ada alasan yang diberikan. Silakan kembangkan artikel ini semampu Anda. M...

Australian actor and theatrical director and producer Gregan McMahon, CBE (1874-1941), Australian actor and theatrical director and producer. Gregan McMahon, CBE (2 March 1874 – 30 August 1941)[1] was an Australian actor and theatrical director and producer. Early life McMahon was born in Sydney, elder son of John Terence McMahon, a clerk, and his wife Elizabeth, née Gregan.[1] Both parents were emigrants from Ireland.[2] McMahon was educated at Sydney Grammar Schoo...

 

Non-human-readable computer file encoded in binary form binaries redirects here. For double stars, see Binary star. .bin redirects here. For the CD image format, see Disk image. This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Binary file – news · newspapers · books · scholar · JSTOR (April 2013) (Learn how a...

 

1990s American esports league This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Professional Gamers League – news · newspapers · books · scholar · JSTOR (May 2015) (Learn how and when to remove this template message) Professional Gamers LeagueSportCommand & Conquer: Red Alert Quake StarCraft StarCraft: Bro...

1950 film A Life of Her OwnTheatrical posterDirected byGeorge CukorWritten byIsobel LennartBased onThe Abiding Vision(1935 novella)by Rebecca WestProduced byVoldemar VetluguinStarringLana TurnerRay MillandCinematographyGeorge J. FolseyEdited byGeorge WhiteMusic byBronisław KaperProductioncompanyMetro-Goldwyn-MayerDistributed byLoew's Inc.Release date September 1, 1950 (1950-09-01) Running time108 minutesCountryUnited StatesLanguageEnglishBudget$1,818,000[1]Box office$1...

 

Building in Inner Mongolia, China Wanbu Huayanjing Pagoda Wanbu Huayanjing Pagoda (Chinese: 万部华严经塔; pinyin: Wànbù Huáyánjīng Tǎ), commonly referred to as Baita or White Pagoda (Chinese: 白塔; pinyin: Bái Tǎ) is a large pagoda located in Saihan District, Hohhot, Inner Mongolia, China. Built during the Liao dynasty, the tower is octagonal in shape and contains 7 floors, and was an important feature of the city of Fengzhou. In the late Yuan dynasty the city ...

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!