Albion's future came under review as part of the 2010 Strategic Defence and Security Review. She was the fleet flagship from December 2010[4] until October 2011,[5][6] and then again from March 2018[7] until January 2021.[8] On 20 November 2024 Defence Secretary John Healey announced that both Albion and her sister Bulwark would be withdrawn from service by March 2025.[9]
Operational history
Ordered for the Royal Navy on 18 July 1996, Albion was constructed by BAE Systems Marine at its shipyard in Barrow-in-Furness, Cumbria. The first steel was cut on 17 November 1997, and the ship's keel was laid down on 23 May 1998. The vessel was launched on 9 March 2001. She was commissioned into the Royal Navy on 19 June 2003 by her sponsor Anne, Princess Royal. Albion is the nameship of the Albion-class landing platform dock, which also includes Bulwark. The ship also carries a permanently embarked Royal Marines landing craft unit, 6 Assault Squadron, Royal Marines.
Along with sister ship Bulwark, Albion forms a key part of the Royal Navy's amphibious warfare capability. The ship can carry up to 256 soldiers in normal conditions, ordinarily Royal Marines. Albion can also carry their various associated armoured vehicles, up to the size of the Challenger 2 main battle tank. Vehicles can be deployed through an internal dock, using the ship's complement of four Landing Craft Utility (LCUs), while troops can be deployed from davits using four Landing Craft Vehicle and Personnel (LCVPs). Also equipped with a flight deck, the ship can operate two helicopters, with a third parked.[10] CH-47s can sling-load RM BvS 10 Viking light tracked, amphibious armoured vehicles and deliver them ashore if the sea states are too severe for them to swim ashore.
2003–2011
In 2003, Albion was granted the Freedom of the City of Chester and also had a prominent role in the Queen's Colour Parade for the Royal Navy in Plymouth Sound; the third time a Fleet Colour has been given in the Royal Navy's history. In early 2004 the ship deployed on a multinational exercise for the first time, taking part in Exercise Joint Winter 04 off Norway, during which she completed her cold weather sea trials and was declared fully operational. Her next deployment was the Aurora exercises on the eastern seaboard of the United States. On 11 November 2004, the ship was sent to Ivory Coast to support Operation Phillis. Albion underwent a refit in early 2006, which included the installation of a new command, control, and communications suite.
Albion attended the HMNB Devonport Navy Days, 26–28 August 2006. Also in attendance was her sister ship, Bulwark, recently returned from the Lebanon evacuation. Ocean was unable to attend due to three sailors contracting tuberculosis; she was moved to HMNB Portsmouth.
During the Vela Deployment to West Africa,[11]Albion acted as the Amphibious Task Group flagship. The deployment lasted from 11 September to 22 November 2006. Approximately 3,000 British personnel and 11 ships of the Royal Navy and Royal Fleet Auxiliary were involved. This deployment saw, for the first time, an Albion-class vessel taking part in amphibious operations with a Bay-class auxiliary landing ship dock, RFA Mounts Bay.
In late July and early August 2007, Albion was anchored off Sunderland during the city's air show.
In late 2008, Albion undertook her first refit, to upgrade various electronic and defence systems. During this docking period the Commanding Officer, Captain Wayne Keble, assumed command of Albion's sister ship, Bulwark.
In late 2010, despite having been in commission for only seven years, the ship's future was uncertain, with either Albion or her sister ship Bulwark due to be put into extended readiness as a result of the 2010 Strategic Defence and Security Review.[15]
In December 2010, Albion was announced as the next Royal Navy flagship and flagship of the UK Responsive Force Task Group, following the early decommissioning of the aircraft carrierArk Royal, which occurred in March 2011, also as a result of the 2010 review.[16][17]
On 20 September 2011, Albion docked at Liverpool Pier Head to celebrate her 10th anniversary with a six-day stay. She was open to the public on the following Saturday and Sunday (24 & 25 September 2011). This was her second visit to Liverpool, having previously visited in March 2010.[citation needed]
Extended readiness 2011–2017
In late 2011 Albion entered a state of "extended readiness" (joining the UK's equivalent to a Reserve Fleet), after Bulwark completed a major refit.[23]
In order to cut the running costs of the Royal Navy, the 2010 Strategic Defence and Security Review concluded that one of the Royal Navy's two landing platform docks, Albion and Bulwark, should be placed into extended readiness while the other is held at high readiness for operations. Both vessels will alternate between extended readiness and high readiness throughout their service lives.
It was confirmed that Albion would be the first of the two vessels placed at extended readiness, for a cost of £2.5 million as Bulwark had recently finished a major refit. Running costs while in extended readiness were estimated to be £300,000 per annum in order to keep the vessel available for reactivation at short notice if needed.
In December 2014, Albion was moved into dry dock at Plymouth to allow her hull to be inspected and cleaned prior to the major work being undertaken to reactivate the ship. The major refit, plus the associated work up period, will take approximately 2.5 years, with Albion initially slated to assume the role of Fleet Flagship in April 2017.[24]
The running costs of one of the Albion-class vessels at high readiness ranged from £17.7 million – £38.6 million per annum from 2007 to 2011.[25][26]
Albion's refit included the fitting of Phalanx CIWS in place of the Goalkeeper CIWS, a Type 997 radar and a new command system.[27]
2017–present
Ship's staff moved back onboard Albion at the end of January 2017, formally taking responsibility for the ship from Babcock with the aim of taking Albion to sea for the first time in six years in summer 2017.[28]
According to the Ministry of Defence, the planned out-of-service date for Bulwark is 2033.[30] However, in October 2017, the BBC's Newsnight reported that the Ministry of Defence was considering decommissioning Albion and Bulwark, as part of a package of cost-cutting measures intended to mitigate the expense of the Royal Navy's two new aircraft carriers.[31] This action was reversed by then Secretary of State for Defence Gavin Williamson in September 2018.[32]
In April 2018, Albion was dispatched to the Asia-Pacific to assist in enforcing sanctions against North Korea.[33]
On 4–6 February 2020, Albion hosted the crew of Uma, a 36-foot sailing yacht that is featured on the YouTube channel Sailing Uma. The Uma crew produced two episodes about their experiences on Albion.[34][35]
In September 2020, Albion embarked on a unique deployment named Littoral Response Group eXperimental (LRG(X)). This would see the ship enter the Mediterranean with embarked Royal Marine Commando forces and Royal Naval personnel testing and developing pilot projects such as experimental unmanned aerial drones and autonomous vehicles for logistical and intelligence gathering purposes, in the operational environment. The deployment was the first that Albion had carried out with the full ships company remaining on board without leave, due to the Covid-19 pandemic.
In July 2023, Albion returned to Devonport from her final deployment prior to going into a state of "reduced readiness" (skeleton crew on board for ship maintenance). It had been anticipated that HMS Bulwark would assume Albion's former frontline role in 2024 after completing a prolonged refit, though it was then reported that she would also be retained in reserve.[36]Albion herself had been expected to remain in "extended readiness" (uncrewed reserve) until at least 2029 with her return to active operations at that point dependent on her receiving a further refit to allow her to continue in service into the early 2030s.[37][38]
However, in November 2024, the government announced that Albion would, be taken out of service by March 2025.[39]