GO Expansion

GO Expansion
Overview
OwnerGO Transit
LocaleGreater Golden Horseshoe, Ontario
Service
TypeRegional rail, S-train
SystemGO Transit
ServicesLakeshore East line, Lakeshore West line, Kitchener line, Barrie line, Stouffville line, Union Pearson Express
Operator(s)GO Transit
Ridership178 million annually (projected by 2031)[1]
History
Planned opening2025–2032 (2025–2032)[2]
Technical
Line length262 km (163 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV 60 Hz AC from overhead catenary
Operating speedUp to 140 km/h (87 mph)[3]
SignallingETCS level 2[4]

GO Expansion,[5] previously known as GO Regional Express Rail (RER),[6] is a project to improve GO Transit train service by adding all-day, two-way service to the inner portions of the Barrie line, Kitchener line and the Stouffville line, and by increasing frequency of train service on various lines to every 15 minutes or better on five of the corridors. This would be achieved with the electrification of at least part of the Lakeshore East line, Lakeshore West line, Barrie line, Kitchener line and Stouffville line.[1][3] GO Expansion is one of the Big Move rapid transit projects.

With GO Expansion, GO Transit will increase the number of train trips per week from 1,500 (as of 2015) to about 2,200 by 2020[needs update] and expand to 10,500 weekly trips upon completion.[7] Most of the extra trips will be in off-peak hours and on weekends. The expanded services, new infrastructure and electrification is projected to roll out in phases between 2025 and 2030.[1] The 10-year regional express rail plan will cost $13.5 billion[8] and will require 150 kilometres (93 mi) of new track, including new bridges and tunnels.[9]

History

Background

GO Transit has historically offered two-way, all-day service along its Lakeshore East and Lakeshore West lines, while only providing peak rush hour service on its other lines. The Big Move outlined the building of express and regional rail service improvements across the existing GO Transit network. Other improvements included extensions to Hamilton and Bowmanville, as well as new GO Transit corridors to Bolton, Seaton and Locust Hill.

As part of the 2011 Ontario general election, Ontario premier Dalton McGuinty also made a campaign pledge to provide two-way, all-day train service on all corridors.[10] This vision of two-way, full-day train service on all corridors eventually included electrification of the system and was renamed Regional Express Rail.[11]

As part of the Phase 2 announcement, Metrolinx stated that the Kitchener and Lakeshore lines would be electrified, as well as the Union Pearson Express.[12]

With GO Expansion, Metrolinx expects to nearly triple ridership to 175 million riders per year by about 2031 from 65.7 million in 2015.[1]

GO Expansion

On March 31, 2017, the federal government announced it would contribute $1.9 billion of the estimated $13.5 billion cost of GO Expansion. The Kitchener line will receive at least $750 million of the federal funding for infrastructure upgrades including 40 kilometres (25 mi) of new track. The Barrie line, Lakeshore East line, and Lakeshore West line will share the balance of the federal funding for upgrades and 88 kilometres (55 mi) of new track.[13]

On February 23, 2022, Metrolinx announced that the preferred bidder for the contract was ONxpress Transportation Partners,[14] a consortium that includes Aecon, FCC Construcción, Alstom, and Deutsche Bahn, among others.[15] Under its $1.6-billion contract, ONxpress will complete Phase 1 of the GO Expansion project, which includes designing key infrastructure such as signalling systems and upgrades to Hydro One power infrastructure. Phase 1 also includes determining the full scope of the project. The consortium will also start construction for grade separations at rail and road crossings.[2]

The contract was finalized on April 19, 2022; Alstom announced it will be implementing the European Rail Traffic Management System for the signalling on the upgraded network, the first use of that standard in North America.[16] According to Metrolinx, ETCS would allow more trains to be on the line simultaneously, citing the words of University of Birmingham visiting lecturer Tyson Moore, who stated that systems with ETCS were "allowing trains to get closer together while still respecting basic safety margins".[17] The signalling system on the GO network will implement ETCS level 2.[4]

In January 2024, Metrolinx announced that, starting January 1, 2025, ONxpress would take over the operation and maintenance of the GO Transit train system in addition to the responsibility of introducing the improvements required for GO Expansion. ONxpress has a division named ONxpress Operations Inc., which consists of Deutsche Bahn International Operations and Aecon Concessions.[18]

Electrification

Metrolinx exhibits
image icon Map of GO Rail Electrification

GO Expansion goals would be achieved with the electrification of core sections of the GO Transit train system while also expanding the use of diesel service in others, as follows:[19]

With electrification, service on the Lakeshore West line could possibly be as frequent as every three-and-a-half minutes during peak periods.[2]

GO Expansion will operate 4-car, bi-level electric multiple unit (EMU) sets which would be coupled to form 8- and 12-car trains. To reduce operating costs, smaller 4-car trains will run during periods of lighter demand, such as on weekends. GO Transit's existing fleet of unpowered bi-level cars will be used to operate many peak services but will be pulled by electric locomotives, in a similar manner to SEPTA Regional Rail. EMUs cost less to operate than 12-car diesel trains and have faster acceleration. Journey times can be reduced significantly with electric traction depending on the route, stopping pattern, and equipment.[20] Because electric trains can accelerate and decelerate faster at stations, trip times could be reduced on average by 10 minutes with a maximum reduction of up to 20 to 30 minutes.[21]

The electrified network will ultimately extend to 262 route-kilometres (163 mi), with six traction substations and 11 traction distribution facilities (switching or parallelling stations).[22] As of 2022, construction for the electrification of lines is to begin in 2023, with partial implementation in 2025 and 2026 and full completion in 2032. The project entails the electrification of over 600 kilometres (370 mi) of track, including 200 kilometres (120 mi) of new track.[2]

Proposed frequencies

In 2022, Metrolinx estimated that with GO Expansion, GO Transit would have the ability to run up to three times more trains than the 3,500 trains per week it ran in 2019. The busiest routes could operate between 8 and 18 trains per hour. Trains at GO stations such as Exhibition, Bloor and East Harbour could have a frequency of every 3 minutes and a 5-minute frequency at stations such as Burlington and Pickering. Evening and weekend service could be as frequent as every 6 to 15 minutes.[21] The following more modest frequencies were projected in 2015.

Two-way all-day service

Map of proposed GO Transit Regional Express Rail services

GO Expansion will see many sections of GO train lines receiving two-way all-day service.[19] Sections proposed to get two-way all-day 15-minute or better are:

  • Lakeshore West line between Burlington and Union Station[3]
  • Lakeshore East line between Oshawa and Union Station
  • Kitchener line between Bramalea and Union Station[23]
  • Barrie line between Bradford and Union Station[3]
  • Stouffville line between Unionville and Union Station

Sections proposed to get two-way all-day 30-minute service are:

  • Kitchener line between Mount Pleasant and Union Station (every 15 minutes in peak period)[23]

Sections proposed to get two-way all-day 60-minute service are:

  • Lakeshore West line between West Harbour and Union Station (already in effect since August 7, 2021)[24]
  • Lakeshore West line between Hamilton GO Centre and Union Station
  • Kitchener line between Kitchener and Union Station (every 30 minutes in peak period)[23]
  • Barrie line between Allandale Waterfront (Barrie) and Union Station
  • Stouffville line between Mount Joy (Markham) and Union Station

Peak direction service

GO Expansion will also see more frequent weekday, peak-direction service on the following routes:[19]

  • Every 15 minutes on the Lakeshore West line between Hamilton GO Centre and Union Station
  • Every 15 minutes on the Milton line
  • Every 30 minutes on the Barrie line between Allandale Waterfront (Barrie) and Union Station
  • Every 15 minutes on the Richmond Hill line
  • Every 20 minutes on the Stouffville line between Old Elm and Union Station

Express service

Stations between Oakville and Hamilton on the Lakeshore West line, between Bramalea and Kitchener on the Kitchener line, and between Pickering and Oshawa on the Lakeshore East line are proposed to receive express service to and from Union Station.[19]

Signalling

As part of GO Expansion, Metrolinx will deploy ERTMS level 1 in order to provide more frequent service, marking the first implementation of ERTMS in North America. [25]

New stations

Metrolinx plans to build several new stations as part of GO Expansion, including Breslau, Innisfil, Kirby, Mulock, and Spadina–Front.[13][26]

SmartTrack

SmartTrack started out as a proposed Regional Express Rail surface service to run mostly within the City of Toronto. It was proposed by John Tory during his successful mayoral campaign in 2014. The SmartTrack proposal depends on electrification of the Stouffville and Kitchener corridors where SmartTrack service would run.[8]

As a part of the agreement reached between Metrolinx and the City of Toronto, five stations will be built within the City of Toronto and are expected to open by 2026; these are St. Clair–Old Weston, Bloor–Lansdowne, King–Liberty (Liberty Village), East Harbour, and Finch–Kennedy.[27]

See also

References

  1. ^ a b c d "GO Expansion Full Business Case" (PDF). Metrolinx (2018). Archived from the original (PDF) on March 3, 2021. Retrieved March 25, 2021.
  2. ^ a b c d "Ontario government awards $1.6B contract for first phase of GO Transit train electrification". CityNews. April 19, 2022.
  3. ^ a b c d "GO Expansion explained – What it means for you". Metrolinx. April 13, 2022. Archived from the original on April 13, 2022.
  4. ^ a b "World standard signalling system to improve GO Train service". www.metrolinx.com. Retrieved April 30, 2024.
  5. ^ "GO Expansion". Metrolinx.com. Retrieved November 25, 2018.
  6. ^ Toigo, Derrick (January 12, 2022). "Update on the Metrolinx GO Expansion Program – First Quarter 2022" (PDF).
  7. ^ "New GO Expansion agreement with ONxpress Transportation Partners ushers in exciting future of faster, greener, more frequent GO Train service". Metrolinx Blog. Metrolinx. April 2022. Retrieved April 21, 2022.
  8. ^ a b Kalinowski, Tess (April 17, 2015). "GO to add almost 50 per cent more trains in next 5 years". Toronto Star. Retrieved March 30, 2016.
  9. ^ Moore, Oliver (March 14, 2016). "Toronto's grand transit plan (maybe, hopefully)". The Globe and Mail. The Globe and Mail Inc. Retrieved August 12, 2016.
  10. ^ Ontario Liberal Party (2011). "The Ontario Liberal Plan 2011-2015" (PDF). OCLC 760993664. Archived from the original (PDF) on May 12, 2012.
  11. ^ Metrolinx (2016). "Metrolinx Regional Express Rail". Metrolinx.
  12. ^ GO Transit (2012). "Electrification Study Highlights" (PDF). GO Transit. Retrieved November 30, 2012.
  13. ^ a b Spurr, Ben (March 31, 2017). "Ottawa to invest $1.9B in GO Transit's regional express rail project". Toronto Star. Retrieved March 31, 2017.
  14. ^ "GO Expansion program takes next step in procurement journey". Metrolinx. Retrieved February 24, 2022.
  15. ^ "GO Expansion set to electrify the region – With rapid all-day service and new electric trains". Metrolinx. Retrieved February 24, 2022.
  16. ^ "Alstom and consortium partners selected for GO Expansion to transform collective mobility in Toronto, Canada". Alstom (Press release). Retrieved April 19, 2022.
  17. ^ "Metrolinx - Advanced signalling will allow more frequent GO Train service". www.metrolinx.com. Retrieved June 9, 2023.
  18. ^ "Metrolinx partners with ONxpress to transform GO Transit service in the region". Metrolinx. January 25, 2024. Archived from the original on January 26, 2024.
  19. ^ a b c d Metrolinx (2015). "GO RER Initial Business Case Summary" (PDF). Retrieved April 3, 2016.
  20. ^ Metrolinx (2015). "GO RER Initial Business Case - Full Report" (PDF). Retrieved April 4, 2016.
  21. ^ a b "New GO Expansion agreement with ONxpress Transportation Partners ushers in exciting future of faster, greener, more frequent GO Train". Metrolinx. April 21, 2022. Archived from the original on April 21, 2022.
  22. ^ Barrow, Keith (February 11, 2016). "Metrolinx sets Toronto RER options". Railway Age. Simmons-Boardman Publishing Inc. Retrieved April 2, 2016.
  23. ^ a b c "First phase of work to expand Kitchener GO Line service kicks off". Metrolinx. May 3, 2022. Archived from the original on May 3, 2022.
  24. ^ "Ontario Introduces Hourly GO Train Service Between West Harbour GO Station and Union Station". news.ontario.ca. Retrieved July 26, 2021.
  25. ^ David Briginshaw (April 20, 2022). "Consortium wins GO Transit expansion project contract". International Railway Journal. Retrieved August 7, 2022.
  26. ^ Metrolinx (2018). "GO Expansion Moves Ahead" (PDF). Metrolinx. Archived from the original (PDF) on April 14, 2021. Retrieved February 25, 2021.{{cite web}}: CS1 maint: numeric names: authors list (link)
  27. ^ "New agreement with City of Toronto helps bring new SmartTrack stations closer to reality". Metrolinx. August 17, 2021. Archived from the original on August 18, 2021. Retrieved August 18, 2021.

Read other articles:

Naipospos (Surat Batak: ᯉᯤᯇᯘᯬ᯲ᯇᯘᯬ᯲) adalah salah satu marga Batak Toba yang merupakan keturunan dari Raja Naipospos. Raja Naipospos sendiri memiliki 5 (lima) orang putra yang menurunkan 7 (tujuh) marga. Hal tersebut menyebabkan keturunan Raja Naipospos disebut sebagai Naipospos silima saama pitu marga (keturunan Naipospos lima bersaudara tujuh marga) Kisah Raja Naipospos dan keturunannya Sejarah Naipospos Menurut para tetua dan tokoh adat marga-marga keturunan Naipospos ya...

 

 

エイドリアン・ハウザーAdrian Houserミルウォーキー・ブルワーズ #37 2019年5月14日基本情報国籍 アメリカ合衆国出身地 オクラホマ州チェロキー郡タールカー(英語版)生年月日 (1993-02-02) 1993年2月2日(30歳)身長体重 6' 4 =約193 cm235 lb =約106.6 kg選手情報投球・打席 右投右打ポジション 投手プロ入り 2011年 MLBドラフト2巡目初出場 2015年9月26日経歴(括弧内はプロチーム...

 

 

ЛаржантьєрLargentière   Країна  Франція Регіон Овернь-Рона-Альпи  Департамент Ардеш  Округ Ларжантьєр Кантон Ларжантьєр Код INSEE 07132 Поштові індекси 07110 Координати 44°32′37″ пн. ш. 4°17′39″ сх. д.H G O Висота 147 - 420 м.н.р.м. Площа 7,22 км² Населення 1573 (01-2020[1]) Густо...

Ansicht des Parks mit der Jahrhunderthalle Der Westpark Bochum ist Ausgangspunkt der städtebaulichen Entwicklung der „Innenstadt West“ in Bochums Innenstadt. Die für die Stadtentwicklung zur Verfügung stehende Gesamtfläche beträgt etwa 75 ha. Die Umsetzung der Maßnahme begann mit dem circa 38 ha großen Park, dessen erster Bauabschnitt 1999 fertiggestellt und eröffnet wurde. Das Zentrum des Westparks bildet inzwischen die zum Veranstaltungszentrum umgebaute Jahrhunderthal...

 

 

ثقافة النيجرمعلومات عامةالبلد النيجر القارة إفريقيا فرع من ثقافة الأرض اللغات الفرنسية مقالات ذات علاقةالتاريخ تاريخ النيجرتعديل - تعديل مصدري - تعديل ويكي بيانات خيالة في مهرجان رمضاني تقليدي بقصر السلطان في مدينة زيندر. رجال من شعب الودابي يؤدون رقصة يانكي تقليدية في ش...

 

 

Російсько-німецький легіон Країна  Німеччина  Російсько-німецький легіон у Вікісховищі Російсько-німецький легіон - почав формуватися в 1810 році за наказом Російського імператора Олександра I, у зв’язку з можливою війною між Росією і Францією під керівництвом Напо...

هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (أبريل 2015) مايكل ميكس معلومات شخصية الميلاد 23 فبراير 1972 (العمر 51 سنة)كينغستون الطول 6 قدم 10 بوصة (2.1 م) مركز اللعب وسط الجنسية  كندا الوزن 109 كيلوغرام  الحياة ...

 

 

「BIOS」はこの項目へ転送されています。生物学研究に関する国際組織(BiOS)については「en:Biological Innovation for Open Society」を、その他のバイオスについては「バイオス」をご覧ください。 ROM形式で提供されるBIOSの例(アダプテック社製SCSIカード、AHA-2940よりBIOS ROM部拡大撮影) 1980年台のDell 310コンピュータに使用されていた1組のAMD BIOSチップ。 Basic Input/Output System(ベー...

 

 

1962 novel Dead Cert First edition coverAuthorDick FrancisCover artistTrevor DenningCountryUnited KingdomLanguageEnglishGenreMysteryPublisherMichael Joseph LtdPublication date1962ISBN0-330-24621-6OCLC35135934 Dead Cert is Dick Francis's first novel, published in 1962. Featured in the 2007 book 100 Must-Read Crime Novels.[1] It was filmed by Tony Richardson in 1974, and Vasile Brescanu in 1976. The title is a shortened form of It's a dead certainty, in this case a play on words re...

PL

Procedural, imperative computer programming language New programming language redirects here. For the process of implementing new programming languages, see Programming language design § Design and implementation. This article's lead section may be too short to adequately summarize the key points. Please consider expanding the lead to provide an accessible overview of all important aspects of the article. (December 2022) PL/IParadigmProcedural, imperative, structuredDesigned byIBM,...

 

 

Село Острівбіл. вёска Востраў Координати 54°09′02″ пн. ш. 28°16′24″ сх. д.H G O Шаблон:Картка/рядки: забагато параметрів! Країна  Білорусь БілорусьОбласть Мінська областьРайон СмолевицькийГромада Жодинська сільська радаНаціональний склад білорусиЧасовий поя...

 

 

Sports Stadium in Trivandrum City University StadiumUniversity StadiumA view of University Stadium Trivandrum (Right)and CSN stadium (left)Ground informationLocationKerala University, Thiruvananthapuram, Kerala, IndiaEstablishment1940; 83 years ago (1940)Capacity20,000[1]OwnerUniversity of Kerala, TrivandrumEnd namesChurch EndHotel EndInternational informationFirst ODI1 October 1984; 39 years ago (1984): India v  AustraliaLast ODI25 Januar...

Book by Ernest Hemingway Winner Take Nothing First EditionAuthorErnest HemingwayCountryUnited StatesLanguageEnglishGenreShort storiesPublisherCharles Scribner's SonsPublication date27 October 1933Media typePrint (hardback & paperback)OCLC256703 Winner Take Nothing is a 1933 collection of short stories by Ernest Hemingway. Hemingway's third and final collection of stories, it was published four years after A Farewell to Arms (1929), and a year after his non-fiction book about bullfigh...

 

 

2010 video gameVindictusCover featuring Lann, one of the playable charactersDeveloper(s)devCATPublisher(s)NexonDirector(s)Eun-Seok Yi[1]EngineSourcePlatform(s)Microsoft WindowsRelease January 21, 2010 KOR: January 21, 2010NA: October 13, 2010EU: October 5, 2011JP: November 30, 2011CHN: December 22, 2011TW: December 23, 2011AU: November 15, 2012THA: December 12, 2015 Genre(s)Action MMORPG, Hack and SlashMode(s)Multiplayer Vindictus is a free-to-play massively multiplayer online role-pl...

 

 

English Anglican priest and historian (born 1961)For the British journalist and author, see Sarah Foot (journalist). The Very ReverendSarah FootFSA FRHistSBornSarah Rosamund Irvine Foot (1961-02-23) 23 February 1961 (age 62)NationalityBritishTitleDean of Christ Church, OxfordSpouses Geoff Schrecker ​ ​(m. 1986; div. 1999)​ Michael Bentley ​(m. 2002)​ParentM. R. D. FootAcademic backgroundAlma materN...

Giants in Bristol folklore Goram and Vincent (or Ghyston) are legendary giants in the folklore of the Bristol area, UK. Summary The earliest accounts of the story explain the ascendancy of Bristol over the port of Sea Mills (the earlier Roman settlement Portus Abonae).[1][2] It also belongs to the genus of myths which explain the origin of local geographical features by supernatural activity, and trade on existing place-names to do so. Such myths are often also the basis for o...

 

 

AzovKoordinat: 47°06′N 39°25′E / 47.100°N 39.417°E / 47.100; 39.417Koordinat: 47°06′N 39°25′E / 47.100°N 39.417°E / 47.100; 39.417Oblast Oblast Rostov Untuk kegunaan lain, lihat Azov (disambiguasi). Azov (bahasa Rusia: Азо́в, IPA: [a'zof]) adalah kota di Oblast Rostov, Rusia, terletak di Sungai Don dan hanya enam belas kilometer dari Laut Azov. Kota ini memiliki populasi sebesar 82.937 jiwa pada tahun 2010.[1 ...

 

 

Hungarian canoeist The native form of this personal name is Medveczky Erika. This article uses Western name order when mentioning individuals. Erika MedveczkyMedveczky in 2016Personal informationNationalityHungarianBorn (1988-06-19) 19 June 1988 (age 35)Budapest, HungaryHeight1.70 m (5 ft 7 in)Weight70 kg (154 lb)SportCountryHungarySportCanoe sprintEvent(s)K-1 1000 m, K-1 5000 m, K–2 1000 m, K-4 500 m Medal record Women's canoe sprint Representing  Hu...

Maurice PialatLahir(1925-08-31)31 Agustus 1925Cunlhat, Puy-de-Dôme, PrancisMeninggal11 Januari 2003(2003-01-11) (umur 77)Paris, PrancisPekerjaanSutradaraPenulis naskah Makam Maurice Pialat Maurice Pialat (bahasa Prancis: [pjala]; 31 Agustus 1925 – 11 Januari 2003) adalah seorang sutradara, penulis naskah dan pemeran asal Prancis. Karya-karyanya sering disebut sebagai realis,[1] meskipun beberapa kritikus film[1][2] menganggap bahwa karyanya ...

 

 

В Википедии есть статьи о других людях с такой фамилией, см. Синадино; Синадино, Пантелеймон. Пантелеймон Иванович Синадинорум. Pantelimon I. Sinadino Городской голова Кишинёва 1837 — 1842 Монарх Николай I Губернатор Павел Иванович Фёдоров Предшественник Дмитрий Петрович Ловчински...

 

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!