The airport is named after Shivaji (1630–1680), 17th-century Chhatrapati of the Maratha Empire. It was renamed in 1999 from the previous "Sahar Airport" to "Chhatrapati Shivaji International Airport" (the title "Maharaj" was inserted on 30 August 2018[7]). It is situated across the suburbs of Santacruz and Sahar Village in Vile Parle East.
RAF Santa Cruz was constructed in the 1930s.[8] It was a bigger airfield than nearby Juhu Aerodrome and was home to several RAF squadrons during World War II from 1942 to 1947.[9] The Airport covered an area of about 1,500 acres (610 ha) and initially had three runways.[10] The apron existed on the south side of runway 09/27, and the area, referred to today as the "Old Airport", houses, among others, maintenance hangars of Air India, Air Works India, Indamer Aviation Pvt Ltd, and MIAL's General Aviation Terminal.
By 1946, when the RAF began the process of handing over the airfield to the Director General of Civil Aviation for Civil operations,[11] two old abandoned hangars of the Royal Air Force had been converted into a terminal for passenger traffic. One hangar was used as a domestic terminal and the other for international traffic. It had counters for customs and immigration checks on either side and a lounge in the center. Air India handled its passengers in its own terminal adjoining the two hangars.[10] In its first year, it handled six civilian services a day.
Traffic at the airport increased after Karachi was partitioned to Pakistan and as many as 40 daily domestic and foreign services were operated by 1949, prompting the Indian Government to develop the airport, equipping the airport with a night landing system comprising a Radio range and a modernised flare path lighting system.[12] Construction of a new passenger terminal and apron began in 1950 and was commissioned in 1958.[10] Named after the neighbourhood in which it stood and initially under the aegis of the Public Works Department, the new airport was subsequently run by the Ministry of Civil Aviation.
With the dawning of the jumbo jet era in the 1970s, Santacruz, despite several extensions, began suffering from insufficient operational capacity.
The Santacruz terminal was designed to accommodate 600 passengers at any given time, but by the late 1970s, it was handling 1,200. In 1979–80, 5 million domestic and international passengers flew into and out of Santa Cruz compared with 3 million at Delhi's Palam Airport. The airlines were constantly expanding their services but there was no corresponding increase in space at the terminal, making it the most congested airport in the country. In one of its issues, Time magazine, referring to the chaos, called the terminal building a "black hole".[13]
A major fire gutted the International section of the terminal building on 21 September 1979, killing three passengers and shutting down the airport. A temporary departure extension or "Gulf Terminal" was made functional in October of that year until the terminal was repaired.[14]
The Tata committee, set up in 1967 to examine the issues concerning the airport, had recommended the construction of a new international terminal to meet the requirements of traffic in the seventies. The Santa Cruz terminal was to be used for domestic traffic alone. The International Airport Authority of India (IAAI), which was set up in 1972, started planning the construction of a new terminal building for handling international passenger traffic, to be completed by 1981. Accordingly, construction of the new international terminal at Sahar to the northeast of Santacruz in Vile Parle was taken up at an estimated cost of ₹ 110 million.
Construction of the new international terminal at Sahar began in November 1977, and the first phase took three years to build. Sahar Terminal 2A, the first phase of the two-part terminal, was opened on 5 December 1980.[13]
AAI had been considering the modernisation of Bombay Airport in 1996 although the AAI board approved a modernisation proposal only in 2003. By then, Bombay and Delhi Airports were handling 38% of the country's aircraft movement and generating one-third of all revenues earned by AAI. At that time, the Bombay airport handled 13.3 million passengers, 60% of which were domestic travellers. The airport faced severe congestion for both aircraft and passengers as it was handling twice as many aircraft movements per day than it was originally designed for. The bidding process for its modernisation eventually began in May 2004 with the decision by the Empowered Group of Ministers (EGoM) was announced in January 2006.[15] In November 2006, Delta Air Lines inaugurated a direct flight from Mumbai to New York.[16][17]
Passenger and air traffic
Its passenger traffic was about 49.8 million in year 2018. It is also the second busiest airport in terms of cargo traffic. In March 2017, the airport surpassed London's Gatwick Airport as the world's busiest to operate a single runway at a time. This was later surpassed again by Gatwick Airport at the end of 2019 due to passenger numbers falling at Mumbai.[18]
It handled a record of 1,007 aircraft movements on 9 December 2018, higher than its earlier record of 1,003 flight movements in a day in June 2018. It handled a record of 51 movements in one hour on 16 September 2014.[19] In financial year 2020, the Mumbai Airport handled 45.87 million passengers, only second to IGI's 67.3 million in India.[20] In financial year 2023–24, the airport handled the highest ever passengers in its history of 52.8 million passengers, surpassing its maximum capacity of 50 million passengers per year, and second only to IGI's 73.6 million in India.[2]
Ownership
A consortium of GVK Industries, Airports Company South Africa, and Bidvest,[21] won the bid to run the Mumbai Airport. To accomplish this task, Mumbai International Airport Private Limited (MIAL), a joint venture between the consortium (74%) and the Airports Authority of India (26%) was formed.[22] Since then, MIAL has made several improvements in the aesthetics, design and passenger conveniences at CSMIA including the refurbishment of domestic terminals 1A & 1B, international terminals 2B & 2C, and the opening of a brand new domestic terminal 1C and new Terminal T2. MIAL also undertook airside improvement projects such as the commissioning of new taxiways, and aprons and the reconstruction of the two runways.[23] In February 2008, MIAL entered into an agreement with Air Transport IT specialist SITA that led to CSIA becoming the first airport in India to Implement Common-use self-service Kiosks and CUTE (Common Use Terminal Equipment) check-in systems.[24]
The airport has two intersecting runways and handles an average of 980 flights per day.[27] The runways were upgraded to Code F, which means they can accommodate larger aircraft like the Airbus A380.[27][28] Following a presentation in March 2011 by UK's air traffic service provider NATS[29] on how the capacity of the airport can be increased, MIAL set a target of 48 aircraft movements an hour in an effort to reduce congestion at the airport. Both runways were operated simultaneously especially during peak hours to try and attain this target.[30] MIAL scrapped simultaneous Cross-runway flight operations in mid-2013 after it found that single runway operations were more effective for increasing aircraft movements per hour. Runway 14/32 was henceforth to be used only when the main runway was unavailable due to maintenance or other reasons.[31] The construction of new rapid exit taxiways helped in increasing flight handling capacity from 32 movements per hour to 44 in 2012.[32] NATS delivered and helped MIAL implement a 'change roadmap' to help CSMIA achieve more than 50 movements per hour in 2015.[29]
The increased air-side efficiencies resulted in CSMIA overtaking Gatwick Airport in March 2017 to become the world's busiest airport with only one operational runway at a time.[18]
Once the longest commercial runway in India, Runway 09/27 is the airport's main runway. 13 taxiways, including four rapid exit taxiways, connect it to a full-length parallel taxiway to its north. It intersects the secondary runway south of the terminal buildings. The reconstruction of the runway started in September 2010[33] and was completed in May 2011. The runway width was increased from 45 metres (148 ft) to 60 metres (200 ft) with a runway shoulder width of 7.5 m added on each side.[33] The ILS on 27 starts at 2,900 ft (880 m) and is 9.1 nautical miles (16.9 km) long with a glide slope path of 3°.[34]
Runway 14/32 has ten taxiways including three rapid exit taxiways that connect to a parallel taxiway running along its eastern flank. It runs between Terminals 1 and 2 and was reconstructed in 2010. The runway shoulders were widened from 7.5 to 15 metres (25 to 49 ft).[33] The associated taxiways of the secondary runway were upgraded in 2019. A new rapid exit taxiway and the conversion of taxiways to Code-F effectively increased the capacity of the runway. In 2020, the secondary runway set a record of 47 movements per hour during peak hour traffic as compared to 36 movements per hour.[27]
Issues with utilising 14/32 are:
Trombay Hill, lies 4.5 nmi (8.3 km) away from the 32 end, an approach that was temporarily made a No-Fly zone because the Bhabha Atomic Research Centre (BARC) nuclear complex at Trombay (Anushakti Nagar) lies within its flight path.[35][36]
MIAL was considering constructing a second parallel runway as part of its master plan. However, the construction of this runway would necessitate a large-scale relocation of either Air India's hangars and maintenance facilities or the airport's flight kitchens and the Sahar police station, among others, depending on its alignment. The parallel runway remains an active part of the expansion plan but in the meantime the cross runway is being upgraded as much as possible.[37]
Air traffic control tower
India's second tallest air traffic control tower with a height of 87.5 m (287 ft) after Delhi Airport (101.9 m) stands in a section of the parking area opposite terminal 1B. The triangular three-dimensional structure with soft vertices that won the Hong Kong Building Information Modelling (BIM) Award for the year 2009, has six storeys commencing from 62.1 m (204 ft).[38] The tower was inaugurated on 18 October 2013[39] and took over operations on 1 January 2014.[40]
From the new tower, air traffic controllers are able to see 8 km (5 miles) beyond the thresholds of both runways. The tower and its associated technical block and mechanical plant building cover a total of 2,884 m2 (31,040 sq ft).[41] The cost of the fully equipped tower is estimated at ₹4 billion.[42][43]
The previous ATC tower, built by the Airports Authority of India (AAI) at an overall project cost of about ₹2.80 billion, was functional from 1999 to 2013.[44] During that period, many airlines such as Singapore Airlines, Saudia, Qantas and United avoided landing at Mumbai airport when the secondary runway was in use as the ATC tower was too close to the runway and not in compliance with ICAO standards. The tower penetrated runway 14/32's transitional obstacle limitation surfaces by over 50 metres (for ILS approaches).[45][46] The tower also obstructed the path of a parallel taxiway under construction for the secondary runway.[40] MIAL demolished the tower in 2014.[47]
Terminals
The airport has two terminals for scheduled commercial passenger services: Terminal 1 at Santacruz for domestic flights and Terminal 2 at Sahar for both international and domestic flights. While both terminals use the same airside facilities, they are physically separated on the city side, requiring a 15–20-minute (landside) drive between them. A dedicated General Aviation Terminal caters to passengers using private and non-scheduled flight operations.
Currently operational terminals
Terminal 1
Terminal 1, locally known as Santacruz Airport, is used for domestic flights primarily operated by low-cost carriers. This was the original Santacruz building that was Mumbai's first passenger terminal which was once integrated, however was renamed Terminal 1 after the opening of the Sahar building for international operations and became a domestic operations terminal. It was refurbished several times over the decades, the most recent being during the 2000s. It was further divided into Terminal 1A, Terminal 1B, and Terminal 1C after their permanent closure during the course of the late 1990s and early 2000s. It was used by SpiceJet, Go First, and IndiGo, but after Jet Airways dissolved on 17 April 2019, select flights from all the Terminal 1 airlines moved into the newer Terminal 2 building.[48] The terminal has 11 passenger boarding bridges. MIAL renamed Terminal 1B to Terminal 1 in January 2017 to help fliers identify it easily.[49] Citing safety and structural challenges, in March 2024, the Adani Group announced plans to demolish and re-build Terminal 1, a few months after Dinkar Balu Patil International Airport Navi Mumbai starts operations. The rebuilding project will begin in 2025 and take three years to complete.[50]
The New Terminal 1 will be connected to Terminal 2 through a three-lane underground tunnel to facilitate airside passenger movement between terminals. The tunnel will cost 500 - 600 Crores and will be completed in two phases.[51]
Terminal 2
Larsen & Toubro (L&T) was awarded the contract to construct the new Terminal 2, in order to differentiate it from the Old Terminal 2 Building. Skidmore, Owings & Merrill (SOM) was the architectural designer of the project. SOM also provided the schematic design of structure and MEP and the detailed structural design of the roof. Detailed design of the foundations and the rest of the structure and civil works, the MEP, IT, and airport systems, including the full construction documentation of the project was carried out by L&T's in-house design team, EDRC (Engineering Design and Research Center). The terminal covers a land area of 210,000 square metres and has replaced the Previous International Terminal (which has already been demolished). The entire project was estimated to cost ₹98 billion (US$1.1 billion) and employ over 12,000 workers.[52]
The X-shaped terminal has a total floor area of 450,000 square metres across four floors and handles both domestic and international passengers. It includes new taxiways and apron areas for aircraft parking designed to cater to 40 million passengers annually.[53] The structure has boarding gates on two piers extending southwards from a central processing building featuring a 42-metre high roof employing over 20,000 metric tonnes of fabricated steel covering 30 acres.[54] However, the eastern pier of Terminal 2 remains truncated due to non-clearance of slums in the adjoining plot, giving an asymmetrical look when seen from above. The new Terminal 2 building operates Multiple Aircraft Ramp System (MARS) stands and swing gates, so that a single stand can accommodate either one wide-body aircraft or two narrow-body aircraft, in either domestic or international configuration.[55] The new terminal is connected by the six-lane Sahar Elevated Access Road to the Western Express Highway. A metro rail link to the terminal is under construction.[56]
The New Terminal has around 21,000 square metres of retail space, lounges and travel services, over 5,000 square metres of landscaping and a multi level car park for 5,000 cars.[57] The parking Management System and Revenue control system for the entire MLCP has been designed and supplied by SKIDATA.[58] It has 192 check-in counters and 60 immigration counters for departing passengers, and 14 baggage carousels and 76 immigration counters for arriving passengers. To transfer passengers across its four levels, the building has 48 escalators and 75 elevators. The terminal also features 42 travelators.[53]
In the initial phase of development, the apron adjoining Terminal 2 provides a total of 48 stands including 3 Code F stands (for the A380). In the final phase of development, a total of 38 Code E/F contact stands, 14 Code E/F remote stands and 20 Code C remote stands are provided (total 72 stands).[55]
The GVK Lounge, the first common luxury lounge at an airport in India, opened in November 2014.[59] The lounge is open to First class and Business class travellers and can accommodate 440 guests at a time. It is spread over 30,000 square feet across two levels of the terminal and has a library, a business centre and fine-dining options, apart from the usual facilities like concierge services, a smoking zone, food and beverage, a bar, a luxury spa, a shower area and a relaxation area. The luxury lounge has won the 'World's Leading Airport Lounge – First Class 2015' award at the World Travel Awards 2015 held in Morocco.[60]
The terminal also houses the Niranta Airport Transit Hotel and the 32-room hotel is the first of its kind in the country.[61] It is located on Level 1 of the terminal and rooms may be booked by passengers who have checked into the airport.[62]IWG plc, operating under the brand Regus operates a shared workspace out of the terminal.[63]
The Old International Terminal was closed permanently at 13:00 on 12 February 2014, and international operations from the New Terminal 2 commenced on the same day.[64] The first arrival was Air India flight 343 (an Airbus A330-200) from Singapore via Chennai, and the first departure was Jet Airways flight 118 (a Boeing 777-300ER) to London. It was inaugurated by the then Prime Minister of IndiaManmohan Singh.[65] The domestic operations at Terminal 2 were launched on 9 January 2015, with the inaugural flight of Vistara arriving from New Delhi.[66] Vistara initially operated from Level 4 of the Terminal, which is being used only by international passengers, but in July 2015, they shifted to Level 3, which will be used only for domestic operations.[66][67] Air India shifted all of its domestic operations from Terminal 1A to Terminal 2 on 1 October 2015 making it the second airline to operate domestic flights from the Terminal 2, to ease their International and Domestic passenger transfers,[68][69][70][71] and Jet Airways shifted all of its domestic operations from Terminal 1 to Terminal 2 on 15 March 2016, facilitating a seamless transfer experience for its passengers,[72] whereas all other domestic airlines, namely Indigo, Go First, and SpiceJet, took place, both Departure and Arrival, at Terminal 1.[71]
After the demise of Jet Airways on 17 April 2019, other carriers launched additional domestic flights using slots vacated by Jet Airways. These flights were operated from Terminal 2.[73] This arrangement resulted in some of the larger carriers having to operate domestic flights from both terminals. Hence, MIAL moved to streamline operations at both terminals in September 2019, shifting all of its domestic operations of Indigo, AirAsia India and Go First back to Terminal 1, while SpiceJet shifted all of its domestic operations from Terminal 1 to Terminal 2.[74]
The airport has free Wi-Fi connectivity provided by Tata Docomo across both Terminal 1 and 2. However, the service has been criticized for being ineffective and complicated access for international passengers, as the passengers need to get an OTP through an Indian phone number only, while the free service lasts for just 45 minutes, following which passengers have to buy data packs. The phone number requirement has been attributed to the requirements of Telecom Regulatory Authority of India for safety considerations.[77] Following frequent criticism, Wi-Fi kiosks were installed for passengers who do not have a local phone number, which can scan boarding passes.[78]
All vehicles arriving at Terminal 2 to pick up arriving passengers are routed via the multi-level car park and are charged a fee to counter traffic congestion at the airport. Four-wheelers are charged a minimum fee of ₹140 (US$1.60) for 30 minutes in general parking and two-wheelers ₹Convert for 240 minutes.[80]
General Aviation Terminal
The airport's General Aviation Terminal for private and non-scheduled flight operators (NSOPs) is located at Kalina on the southwest side of the airfield.[81] The terminal was approved for international operations in April 2011,[82] making CSMIA the first airport in India[83] to have a self-contained terminal for handling round the clock domestic and international flight operations for private and NSOPs. The terminal offers facilities for passengers departing and arriving on private aircraft and business jets. The terminal has two exclusive lounges, two conference halls, two crew restrooms and a café bar.[84]
Previous terminals
Terminal 1 (divided into 1A, 1B, and 1C)
When the Sahar terminal was opened in the 1980s, the terminal at Santacruz reverted to being a domestic terminal. The terminal consisted of three structures, Terminals 1A, 1B, and 1C.
Terminal 1A - It was opened in April 1992, and was used solely by Indian Airlines (now Air India). In 2005, Kingfisher Airlines also began operating from 1A, after it entered into an agreement to source all ground handling and terminal space from Indian Airlines.[85] In June 2013, shortly after Kingfisher ceased operations, MIAL allocated the vacant space to GoAir.[86] From 1 October 2015, Air India moved all of its Terminal 1A operations to the new Terminal 2. GoAir moved its departure operations to Terminal 1B on that same date, resulting in the closure of the Terminal 1A departures level. GoAir, however, continued to use Terminal 1A's arrivals level[87] until 15 March 2016 when its arrivals were also shifted to Terminal 1B[88] and Terminal 1A was shut.
Terminal 1B - It was opened in 1942, and This was the original Santacruz building that was Mumbai's first passenger terminal which was once integrated, however was renamed Terminal 1 after the opening of the Sahar building for international operations and became a domestic operations terminal.
Terminal 1C - It was built at a cost of ₹ 3 billion and opened in April 2010. Architectural design was provided by Hafeez Contractor. EDRC, the in-house design unit of the EPC contractor Larsen & Toubro (L&T) performed the Structural, MEP and IT/Airport systems design. The terminal had six passenger boarding bridges and allowed connectivity between Terminals 1A and 1B. It was spread over 297,194 sq ft across three levels and had a seating capacity of about 900 passengers. Level 1 housed the offices of MIAL and some airlines, Level 2 comprised the security-hold area for passengers after checking in at either Terminal 1A or 1B. Level 3 accommodated a food court.[89] The building served as a boarding-only facility for all airlines. Passengers entered this facility via Terminal 1B.
In January 2017, MIAL renamed the Terminal 1B as T1.[49]
Terminal 2 (divided into 2A, 2B, and 2C)
Terminal 2 of the airport is located at Sahar Village, in Vile Parle East. Designed by Aéroports de Paris and opened in January 1981, Terminal 2 was built in three modular phases as Terminals 2A, 2B, and 2C. Each module had a capacity of 2.5 million annual passengers. This terminal had an area of 120,000 m2 (1,300,000 sq ft).[10]
The terminal structure was laid out in a space-saving vertical arrangement with separate levels for arrivals and departures. An overpass on the city-side took passengers to the upper-level departure forecourt.[13]
The original terminal was a convex shaped single concourse building with 14 Code E contact stands. The greater T2 apron also provided a further 15 Code D/E and 6 Code C remote stands. This gave a total of 35 stands on the existing apron.[55]
The departures section of 2A had 42 check-in counters, 18 more than in the international section at the Santacruz terminal. After completing customs and immigration formalities, the departing travellers were led down to a mezzanine floor where five elongated nodules connect the terminal with the aircraft via aerobridges.[13]
Terminal 2A - This first phase of the terminal complex was completed at a cost of ₹180 million (US$2.1 million)[10] and it served most international carriers. Its boarding gates 3 to 8 were the first aerobridges installed in the subcontinent. It was decommissioned and demolished in January 2009[90] to make way for the new T2 structure.
Terminal 2B - It cost ₹220 million (US$2.6 million) and was completed in 1984.[10] It served Air India and carriers handled by Air India between September 1986 and October 1999 and was decommissioned when Terminal 2C opened. It was extensively refurbished and made operational once again following the demolition of Terminal 2A.
Terminal 2C - Inaugurated in October 1999, it was originally and exclusively for Air India, Air India Express and those carriers whose ground operations were handled by Air India.
Terminals 2B and 2C were decommissioned in February 2014 when the new T2 took over operations. They were demolished later that year so that the remainder of the new T2 could be completed.[91]
Cargo Complex
The Air Cargo Complex, located west of the International Passenger Terminal 2, has been in operation since 1977.[92] The cargo apron is capable of handling five wide-bodied aircraft. In 2009–10, the airport handled 385,937 metric tonnes of International Cargo and 165,252 metric tonnes of Domestic Cargo.[93]Air India (AI) and Mumbai International Airport Pvt Ltd (MIAL) have been appointed as custodians of cargo by the Central Board of Excise and Customs at Mumbai. The Cargo Terminal has a Centre for Perishable Cargo (CPC) with an area of 1844 m2 for perishable and temperature-sensitive international export shipments, strong rooms of 115 m2 for storage of valuable cargo and storage areas for dangerous goods in both import and export warehouses, dedicated Unaccompanied Baggage handling and clearance areas and 9 coloured X-ray cargo screening machines for export cargo.[94]
Apart from handling 65% of the international volumes at CSIA, MIAL also operates a Common User Domestic Cargo Facility. After taking over the redevelopment work of the airport in 2006, MIAL commissioned an offshore Common User Terminal (CUT) near the Marol pipeline as a temporary arrangement. In June 2016, MIAL opened a new domestic cargo CUT near the Western Express Highway in Vile Parle.
The CUT has been outsourced to Concor Air Ltd. on a Build-operate-transfer basis. The terminal has the capacity to handle 300,000 metric tonnes of cargo annually and is built on an area of 60,000 square feet. The Cargo Terminal is an "elevated terminal structure" where all arriving domestic cargo is managed from the basement level while departing cargo is handled at the upper level. Air India and Blue Dart handle their own domestic cargo operations at their own terminals.[95]
Blue Dart opened its dedicated cargo facility at Mumbai Airport near Terminal 1 on 7 February 2019. The facility measures 4,300 square meters and has air-side and city-side access, allowing for faster transfer of shipments.[96]
Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found on Phabricator and on MediaWiki.org.
Annual (civil) passenger traffic for Mumbai.
See Wikidata query.
Line 3 of the Mumbai Metro serves CSMIA via three stations – one each at the Santacruz and Sahar terminals and one in the GVK SkyCity.[227]
The stations, part of the 12.5 kilometre Phase 1 route that runs between Bandra Kurla Complex (BKC) and Aarey JVLR, were opened to the public on 7 October 2024.[228]
When both phases are completed, the line will run underground from Cuffe Parade to SEEPZ and will reduce the commute time between Colaba and the airport to 40 minutes.[229]
In early 2012, the MMRDA held talks with MIAL to either construct or finance the construction of three of the line's stations.[230] MIAL agreed to bear the cost of constructing the three stations, expected to total ₹ 777 crore, because of the potential increase in passenger convenience. However, CSIA placed conditions before MMRDA for the corridor;[230]
The metro line should operate twenty-four hours a day in order to serve passengers of international flights scheduled at odd hours.
A provision be made for a check-in facility at all metro stations.
MIAL specified that the commercial rights of the three stations it constructs will fully rest with the authority, and that revenue earned from any commercial activity on the premises would go to MIAL. It would undertake the design and civil construction of the stations, costing ₹ 600 crore, on its own, and would pay the estimated cost of electromechanical equipment (around ₹ 177 crore) to MMRDA in three equal instalments over three years.[227]
MIAL inserted a 'metro component' in the User Development Fee charged at Mumbai Airport from 2016 to February 2023 to raise Rs 518 crore for metro connectivity. The charges of Rs 20 and Rs 120 per domestic and international departure respectively were levied until the target sum was raised.[231]
Line 7A is an extension of the 16.475 km (10.237 mi)[232] long 'Red Line' that will connect to T2.[233]
The line will have an underground station at CSMIA.[234]
Civil work on this line began in early 2020.[235] Tunnelling work is expected to be completed by December 2024.[236]
Along with Delhi Airport, the airport was adjudged the "World's Best Airport" at Airport Service Quality Awards 2017 in the highest category of airports handling more than 40 million passengers annually by Airports Council International.[237] It has also won the "Best Airport in India and Central Asia" award at the Skytrax 2016 World Airport Awards.[238] It is one of the three airports in India to have implemented Airport Collaborative Decision Making (A-CDM) to ensure timely takeoffs and landings.[239] The airport was awarded as the Best Airport In the Asia-Pacific in 2020 (over 40 million passengers per annum) by Airports Council International.[240] In March 2023, the airport was named again as the "Best Airport in the Asia-Pacific" in the category of over 40 million passengers per annum by Airports Council International.[241] In July 2023, the airport was ranked fourth on the list of top 10 favourite airports in the world by Travel + Leisure.[242]
On 19 July 1959, Rani of Aera, a Lockheed L-1049G Super Constellation (registered VT-DIN) carrying 46 people (39 passengers and seven crew) approached Santacruz Airport in conditions of poor visibility due to rain. The captain was using an altimeter with the barometric pressure set at 29.92". The aircraft crashed and suffered damage beyond repair. There were no fatalities.[244]
1960s
On 16 March 1963, a ČSA Tupolev Tu-104A (registration OK-LDB) caught fire and burned out while being refuelled at Santa Cruz Airport, India; no casualties except for a flight attendant who was injured after jumping from the plane.
On 28 July 1963, United Arab Airlines Flight 869 bound from Tokyo to Cairo, with a partial stop in Bombay, crashed into the Arabian Sea before approaching Santacruz Airport. All 63 people on board (55 passengers and eight crew members) died, including 24 passengers from the Philippines who were due to travel to Greece to attend the 11th World Scout Jamboree.
On 28 May 1968, Garuda Indonesian Airways Flight 892, a Convair 990A bound for Amsterdam but was on its next flight segment from Bombay to Karachi, crashed minutes after takeoff from Santacruz Airport. All 29 people on board (15 passengers and 14 crew members) died. In addition, there was also one casualty on the ground.[245]
1970s
On 12 June 1975, Air France Flight 193, a Boeing 747-128 (N28888) operating the sector between Bombay (now Mumbai), and Tel Aviv to Paris-Charles de Gaulle Airport was destroyed by fire on the ground at Bombay's Santa Cruz Airport, following an aborted takeoff. The aircraft's tire on its right-hand main undercarriage had failed while the flight deck crew was executing a 180 degree turn at the beginning of Santa Cruz Airport's runway 27. When the flight deck crew began its takeoff run, another tire failed. At that point the plane's wheels and braking assembly came into contact with the runway, starting a fire. The crew aborted takeoff. The ensuing delay in shutting down the engines, as well as the improper deployment of the airport's fire service, caused the fire to spread, leading to the plane's total destruction. There were no fatalities among the 394 occupants (18 crew and 376 passengers).[246]
On 12 October 1976, Indian Airlines Flight 171, a Sud Aviation SE 210 Caravelle had its right engine catch fire shortly after takeoff. The crew attempted to return, but the plane crashed approximately 1000 feet short of Runway 09. All six crew members and their 89 passengers were killed.
On 1 January 1978, Air India Flight 855 a Boeing 747-237B crashed into the Arabian Sea after takeoff from Bombay, killing all on board (213 occupants; 190 passengers, 23 crew). The cause of the crash was crew disorientation while dealing with a malfunctioning AI in the dark as the flight took off during the night time.
On 4 August 1979, an Indian Airlines Hawker Siddeley HS 748 aircraft was approaching Sahar International Airport (now Chhatrapati Shivaji Maharaj International Airport) at night and in poor weather when it flew into high terrain approximately 6 mi (9.7 km) from the airport, killing the four crew and their 41 passengers.
On 21 September 1979, a big fire erupted at the International Terminal; three passengers died in the aftermath. Authorities battled the blaze for many hours.[247]
1980s
On 21 June 1982, Air India Flight 403, a Boeing 707–420 (Reg: VT-DJJ) carrying 99 passengers and 12 crew from Kuala Lumpur to Bombay via Madras crashed while landing at Sahar International Airport during a rainstorm. The fuselage broke apart and 17 people including two crew members were killed. The cause of the crash was flight crew error, as the plane overshot the runway while landing. [248][249]
1990s
On 12 March 1993, during a series of bombings in Bombay, grenades were thrown at the terminal of the airport. There were no deaths.[250] In addition, explosions went off in the Airport Hotel next to the airport.[251]
2000s
On 26 July 2005, the airport operations were shut down for more than 30 hours due to heavy flooding of the runways, submerged Instrument Landing System equipment and extremely poor visibility. Over 700 flights were cancelled or delayed. The airports reopened on the morning of 28 July 2005.[252] Within 24 hours of the airports becoming operational, there were 185 departures and 184 arrivals, including international flights. Again from the early morning of 31 July, with an increase in waterlogging of the runways and different parts of Mumbai, most of the flights were indefinitely cancelled.
On 30 July 2005, at 6:55 AM local time, Air India Flight 127, a Boeing 747-400 (registered VT-EVJ), flying on the route Bangalore-Mumbai-Frankfurt-Chicago, skidded on landing at Mumbai on runway 14/32 due to hydroplaning, and damaged the nose wheel landing gear after hitting a few runway lights. While there were no injuries among the 335 passengers and crew, the immobilized plane sustained serious damage was taken out of service to be repaired in a hangar. An alternative Boeing 747-400 was made available to continue the flight.[253][254] The incident took place four days after the airport was closed due to flooding in the city, and two days after reopening.
On 16 May 2008, a Boeing 777-200 (registered as VT-AIK) operating as Air India flight 717 to Dubai collapsed at Mumbai, after the nose landing gear failed. The incident took place before the passengers were about to board. There were no fatalities or injuries, however, the plane suffered serious damage and was off service for repairs, while an alternative aircraft was arranged for the flight.[255]
Between 26 and 29 November 2008, several airlines, including Delta, Continental (now United), Lufthansa, and many others temporarily cancelled their flights due to passenger and crew safety caused by the terrorist attacks in Mumbai led by 10 Pakistan based Lashkar-e-Taiba terrorists. The airlines resumed operations once the attacks ended after the last terrorist was neutralised by security forces.[256]
On 4 September 2009, Air India Flight 829 a Boeing 747–437 (registered VT-ESM), flying from Mumbai to Riyadh caught fire at the Airport. The fire started in the number one engine while the aircraft was taxiing to Runway 27 for take-off. An emergency evacuation was carried out with no injuries among the 229 people (213 passengers and 16 crew) on board. The Boeing 747-400 sustained severe fire damage which was beyond repair and was written off. The plane was scrapped in May 2011.[257][258][259]
2010s
On 28 May 2012, Air India Flight 112, a Boeing 777-200LR (registered VT-ALH), suffered damage to the nose radar dome and left engine cowling on landing at Chhatrapati Shivaji Maharaj International Airport in Mumbai following a flight from London Heathrow. The cause of the damage could not be determined, but the aircraft was withdrawn from service to be repaired. The Boeing 777 returned to service in January 2015 after repairs and test flights were completed.[260][261]
On 30 January 2014, Air India Flight 116, a Boeing 787-8 Dreamliner(registered VT-ANE) flying from Mumbai to Delhi with 236 occupants, had a near-miss on take-off with a Sesa Goa Partenavia P68C aircraft (registered VT-TLE) that took from runway 26 of Juhu Aerodrome. The incident was caused by an ATC instruction error.[262]
On 2 February 2014, Air India Flight 191, a Boeing 777-300ER (registered VT-ALQ), flying from Newark, blew three tires after touching down on runway 27. There were no injuries among the 260 passengers and crew, and the place was able to taxi to the gate with assistance.[263]
On 20 February 2014, United flight 48, a Boeing 777-200ER, flying from Newark, was grounded upon landing after engineers discovered that the right engine cover was badly damaged.[264]
On 17 December 2015, an Air India technician was killed in a freak accident after being sucked into the engine of an Airbus A320 during pushback. The aircraft, Air India Flight 619 was bound for Hyderabad. Although there were no casualties aboard the aircraft, The technician died after the co-pilot mistook a signal and started the engine.[265]
2020s
On 6 May 2021, a Jet Serve Aviation (Reg: VT-JIL) air ambulance flight carrying two crew, a doctor, a COVID-19 patient, and one of the patient's relatives performed a belly landing after losing a wheel earlier in the flight while departing from a refuelling stop in Nagpur. Airport firefighters sprayed foam onto the runway to prevent fire, and there were no injuries.[266][267]
On 14 September 2023, a VSR Aviation (Reg: VT-DBL) Learjet 45 carrying two crew and eight passengers, arriving from Visakhapatnam, crash-landed at the airport due to heavy rain and thunderstorm. This impacted the airport's busy flight schedule delaying and diverting more than 40 flights to and from the city.[268][269][270]
On 20 May 2024, Emirates Flight 508, a Boeing 777-300ER (registered as A6-ENT), suffered a bird strike before landing at Mumbai.[271] While there were no injuries among passengers and crew, the plane suffered substantial damage and at least 36 flamingos were killed in the strike while the plane was flying over Ghatkopar suburban region of Mumbai. An alternative aircraft was arranged for the return flight, while the damaged plane was later repaired and put back into service.[272]
^Chatterjee, D. K. (2005). "Central Industrial Security Force – Airport Security". Central Police Organisations, Part 1. Allied Publishers. p. 79. ISBN8177649027.
Norwegian politician Gro-Anita MykjålandMember of the StortingIncumbentAssumed office 1 October 2021ConstituencyAust-AgderMayor of IvelandIn office2011 – 27 September 2021Preceded byOle Magne OmdalSucceeded byTerje Møkjåland Personal detailsBorn (1976-09-04) 4 September 1976 (age 47)NationalityNorwegianPolitical partyCentreAlma materUniversity of Agder[1]OccupationPolitician Gro-Anita Mykjåland (born 4 September 1976) is a Norwegian politician. She has been a m...
У Вікіпедії є статті про інші значення цього терміна: Левківка. село Левківка Герб Прапор Країна Україна Область Вінницька область Район Вінницький район Громада Погребищенська міська громада Код КАТОТТГ UA05020210240095117 Основні дані Населення 349 Площа 0,146 км² Густота на
Pemandangan Kanal Cannaregio dari Kanal Besar Venesia. Letak Cannaregio di Venesia. Cannaregio adalah salah satu dari enam sestieri (distrik) di Venesia. Distrik ini merupakan distrik paling utara dan juga terbesar kedua dengan jumlah penduduk sebesar 13.169 jiwa pada tahun 2007. Pulau kuburan Isola di San Michele diasosiasikan dengan Cannaregio karena letaknya yang tidak jauh dari pesisir utara distrik ini. Sejarah Kanal Cananregio (yang pernah menjadi jalur masuk utama ke Kota Venesia sebel...
Maluku memiliki sejarah yang panjang mengingat daerah ini telah dikuasai bangsa asing selama kurang lebih 2300 tahun lamanya dengan didominasi secara berturut-turut oleh bangsa Arab, Portugis, Spanyol, dan Belanda serta menjadi daerah pertempuran sengit antara Jepang dan Sekutu pada era Perang Dunia ke II. Para penduduk asli Banda berdagang rempah-rempah dengan negara-negara Asia lainnya, seperti Tiongkok, paling tidak sejak zaman Kekaisaran Romawi. Dengan adanya kemunculan agama Islam, perda...
تشارلز كترنج (بالإنجليزية: Charles Franklin Kettering) معلومات شخصية الميلاد 29 أغسطس 1876(1876-08-29)أوهايو الوفاة 24 نوفمبر 1958 (82 سنة)دايتون، أوهايو مواطنة الولايات المتحدة عضو في الأكاديمية الوطنية للعلوم، وجمعية مهندسي السيارات الدولية [لغات أخرى]، والجمعية الأمري...
Fictional character from NBC's The Office Fictional character Robert CaliforniaThe Office characterJames Spader as Robert California.First appearanceSearch Committee (2011)Last appearanceFree Family Portrait Studio (2012)Created byGreg DanielsPaul LiebersteinPortrayed byJames SpaderIn-universe informationNicknamesBK “The Lizard King”Occupation Regional manager of Dunder Mifflin (former) CEO of Sabre (former) CEO of Sabre/Dunder Mifflin (preceded By Jo Bennett, then succeeded by David Wall...
Endurance race car Audi R15 TDI Audi R15 TDI at the 2009 24 Hours of Le MansCategoryLMP1ConstructorAudiDesigner(s)Ralf Jüttner (technical director)Ulrich Baretzky (Head of Engine Development)PredecessorAudi R10 TDISuccessorAudi R18Technical specifications[1]ChassisCarbon fibre monocoqueSuspension (front)Double wishbone, torsion bar with separate damper, anti-roll barSuspension (rear)Double wishbone, torsion bar with separate damper, anti-roll barLength4,650 mm (183.1 in)Wid...
Bilateral relationsAmerican-Vanuatuan relations United States Vanuatu The United States and Vanuatu established diplomatic relations on September 30, 1986 – three months to the day after Vanuatu had established diplomatic relations with the Soviet Union.[1] Relations were often tense in the 1980s, under the prime ministership of Father Walter Lini in Vanuatu, but eased after that. At present, bilateral relations consist primarily in US aid to Vanuatu, and are cordial. 1980s Early re...
Lok Sabha constituency in Maharashtra Nashik Lok Sabha Lok Sabha constituencyDark Area of ConstituencyConstituency detailsCountryIndiaRegionWestern IndiaStateMaharashtraAssembly constituenciesSinnarNashik EastNashik CentralNashik WestDeolaliIgatpuriEstablished1952(71 years ago) (1952)ReservationNoneMember of Parliament17th Lok SabhaIncumbent Hemant Godse PartyShiv SenaElected year2019Preceded bySameer Bhujbal, NCP Nashik Lok Sabha constituency is one of the 48 Lok Sabha (parliamenta...
Pakistani politician The topic of this article may not meet Wikipedia's general notability guideline. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted.Find sources: Khushdil Khan – news · newspapers · books · scholar · ...
Charles II menandatangai kesepakatan dengan Prancis pada tahun 1670 Aliansi Tiga merupakan istilah yang digunakan untuk menyebut perjanjian persekutuan antara tiga negara untuk tujuan politik.[1][2] Aliansi ini disebut juga Aliansi Tri Sekutu.[2] Ada beberapa Aliansi Tiga yang cukup terkenal.[2] Misalnya pada tahun 1668, Inggris, Belanda dan Swedia bersekutu untuk melakukan usaha mengimbangi Prancis.[2] Prancis pada tahun tersebut mengalami kemajuan pes...
ألفية: ألفية 2 قرون: القرن 19 – القرن 20 – القرن 21 عقود: عقد 1950 عقد 1960 عقد 1970 – عقد 1980 – عقد 1990 عقد 2000 عقد 2010 سنين: 1985 1986 1987 – 1988 – 1989 1990 1991 1988 في التقاويم الأخرىتقويم ميلادي1988MCMLXXXVIIIتقويم هجري1408–1409تقويم هجري شمسي1366–1367تقويم أمازيغي2938من بداية روما27...
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Pinjore – news · newspapers · books · scholar · JSTOR (January 2014) (Learn how and when to remove this template message) Town in Haryana, IndiaPinjoreTownPinjoreLocation in Haryana, IndiaShow map of HaryanaPinjorePinjore (India)Show map of IndiaCoordinates: 30...
Species of bat Harmless serotine Conservation status Near Threatened (IUCN 3.1)[1] Scientific classification Domain: Eukaryota Kingdom: Animalia Phylum: Chordata Class: Mammalia Order: Chiroptera Family: Vespertilionidae Genus: Eptesicus Species: E. innoxius Binomial name Eptesicus innoxius(Gervais, 1841) Synonyms Eptesicus espadae Cabrera 1901[2] The harmless serotine (Eptesicus innoxius) is a species of vesper bat.[3] It has a restricted range in western Ec...
Not to be confused with Srinagar, the summer capital of Jammu and Kashmir. City in Uttarakhand, IndiaSrinagarCityView of Srinagar, Pauri Garhwal, Uttarakhand with mountainsSrinagarLocation in Uttarakhand, IndiaShow map of UttarakhandSrinagarSrinagar (India)Show map of IndiaCoordinates: 30°13′N 78°47′E / 30.22°N 78.78°E / 30.22; 78.78Country IndiaStateUttarakhandDistrictPauri GarhwalArea • Total1,257 km2 (485 sq mi)Elevation560 m ...
قصر الأمير محمد علي بالمنيلمعلومات عامةنوع المبنى قصرالمكان القاهرةالمنطقة الإدارية محافظة القاهرة البلد مصربني بطلب من محمد علي توفيق التصميم والإنشاءالنمط المعماري الفن الجديد المهندس المعماري الأمير / محمد علي توفيقالمعلم / محمد عفيفيمعلومات أخرىموقع الويب egymonume...
العضلة العصعصية الاسم العلميmusculus coccygeus العضلة الرافعة للشرج من الداخل. تفاصيل عمل العضلة سحب العصعص إلى الامام بعد التبرز، واغلاق مخرج الحوض الخلفي جزئياً. الأعصاب العصب الفرجي؛ الأعصاب الشوكية: (العصب الرابع-الخامس أو العصب الثالث-الرابع) نوع من كيان تشريحي معين [ل...