Alcoa Power Generating, Inc. is a subsidiary of Alcoa Inc., headquartered in Pittsburgh, Pennsylvania. Its three divisions were independent subsidiaries before being consolidated into Alcoa Power Generating, Inc. (APGI). These three projects have produced hydroelectric power and manage impoundments which also provide flood control; recreation, residential and business opportunities; and wildlife habitat.[1]
Yadkin Project
The APGI Yadkin Project managed a 38-mile section of the Yadkin River, plus tributaries, in Piedmont North Carolina and included four dams, powerhouses and reservoirs, sold in February 2017 to Cube Hydro Carolinas.[2][3] The counties of Davie, Davidson, Rowan, Stanly, and Montgomery border the Yadkin Project river and lakes. The dams owned and operated by APGI were the Narrows dam (completed in 1917), the Falls dam (completed in 1919), the High Rock dam (completed in 1927), and the Tuckertown dam (completed in 1962). The Narrows dam and powerhouse development is the only hydroelectric project listed on the National Register of Historic Places in North Carolina. The other three dam and powerhouse developments have been determined eligible for listing on the National Register.[4]
History
At the Narrows, the Yadkin River flowed through a deep gorge for three and a half miles within the Uwharrie Mountains. Its potential for industrial development had long been recognized. In 1887, E.B.C. Hambley, a mining expert from England, came to Salisbury, North Carolina. He gained the backing of Pittsburgh industrialist George I. Whitney. Between 1899 and 1901, Whitney organized eight subsidiary companies and employed Hambley as his chief engineer. About a mile upriver from the Narrows, the Whitney Development Company nearly completed the granite Whitney Dam and a five-mile long diversion canal, and began construction of a powerhouse at Palmer Mountain before the company declared bankruptcy in 1907 and all work ceased. The massive canal remains today, while the Whitney Dam lies beneath the waters of Badin Lake. They have been determined eligible to be listed on the National Register.[4] In 2017, Historic Salisbury Foundation board president Susan Sides said, "It was called one of the most unique dams in all history. It was referred to as the 'Niagara of the South.'"[5]
In 1912, a French Company, L'Aluminium Français, acquired the assets of the Whitney Company. L'Aluminium Français decided against completing the Whitney project, and organized the Southern Aluminum Company to construct a 200-foot (61 m) high dam and powerhouse at the Narrows to power an aluminum plant which it would also build. West of the proposed smelter, the worker's village of Badin was planned and platted. The town was named in honor of the Southern Aluminum Company's president, Adrien Badin. The project faltered a second time as most of the French engineers returned to France during World War I.[4]
In 1915, the Aluminum Company of America purchased the property. Plans once again were altered. The dam was redesigned and the new plans called for a brick powerhouse to be built on the east side of the river. The original powerhouse site on the west side of the river was abandoned and the partially completed building was dismantled to its concrete foundations. The original smelter site was also abandoned and a new smelter building was designed west of the Badin townsite. A devastating flood in 1916 caused damage and delays. When completed in 1917, the 185-foot (56 m) Narrows Dam was the world's highest overflow type dam. The Narrows Reservoir, commonly called Badin Lake, reaches a depth of 190 feet (58 m) and occupies 5,350 acres (2,170 ha).[4]
To generate additional hydroelectric power, in 1919, the company constructed Falls Dam downriver of Badin and High Rock Dam upriver in 1927. High Rock Lake, at 15,180 acres (6,140 ha), was the largest lake on the Yadkin at that time. In 1929, the company's name was changed to Alcoa. In 1962, Alcoa built the Tuckertown Dam between High Rock and Narrows Reservoirs.[4]
In August 2002, Alcoa temporarily suspended aluminum production at the Badin Works, laying off 377 workers.[6] The electrode plant continued operating until 2007 when the plant shut down permanently.[7] The dams continue to generate 215 megawatts of electricity annually which the company sells.[8] During calendar years 2008, 2009, and 2010, the Yadkin Project generated an average of $7.73 million annually in net income, on an average of $29.46 million in annual revenues.[9] In the year ending September 2013, APGI sold 964,216 megawatt hours, with revenue estimated at $30 million.[10]
On July 11, 2016, Cube Hydro Carolinas, part of Cube Hydro Partners LLC, announced its purchase of the APGI power plants on the Yadkin River. Cube Hydro intends to improve the plants.[11] APGI would still own 15,000 acres (6,100 ha) of land.[12] On December 13, the Federal Energy Regulatory Commission approved the license transfer to Cube Yadkin Generation.[13] The sale became official February 2, 2017.[3]
For more than 70 years, Alcoa disposed of spent potlining, which the EPA declared a hazardous waste in 1980. Alcoa took "corrective measures", but a Duke University Environmental Law and Policy Clinic analysis found "wastes from former smelting and disposal activities at Alcoa Badin Works continue to pollute the groundwater, surface water, and soil in the Badin community and Yadkin River basin".[15] Surveys by Duke since 2018 show that polluted groundwater has reached the Little Mountain Creek floodplain, although Alcoa states its waste products have not reached Little Mountain Creek. Further studies were needed to determine how polluted other areas were. Duke believed trichloroethylene (TCE) was still in the groundwater at the main plant. Duke recommended studying "excavation and removal of the hazardous waste buried in Alcoa's dumps". In December 2019 Duke sent a report to the state Department of Environmental Quality.[15]
Site redevelopment
In January 2011, Alcoa announced its commitment to spend $10 million to prepare the Badin Works site for redevelopment by demolishing buildings which would not be needed and making improvements to the facility.[16] On May 23, 2011, Electronic Recyclers International, a recycler of electronic items such as computers and cell phones, announced plans to spend $5 million on a 165,000-square-foot (15,300 m2) building. APGI will also spend $5 million. 535,000 square feet (49,700 m2) of available space remains on the site.[17] Clean Tech Silicon and Bar LLC also wanted to invest $300 million and create 450 direct and indirect jobs. However, negotiations between Clean Tech, APGI, and Stanly County Commissioners did not result in an agreement, and Clean Tech withdrew its offer.[18]
In 2016, after APGI sold its power plants, the company said it will continue to market Badin Business Park.[11]
Yadkin Project relicensing process
General information
A 50-year federal license to operate the dams on the Yadkin River was granted in 1958 to the Carolina Aluminum Company, a part of Alcoa, which owned the power plants and the land under the lakes, as well as significant land holdings around the lakes. The license was transferred from Yadkin, Inc. (an Alcoa subsidiary) to APGI in 2000.[19][20][21] In 2002, APGI began an extensive relicensing process[22] with four series of local public hearings held throughout the project area,[22][23][24][25] and 100 representatives of over 30 stakeholder groups from federal, state, and local governmental agencies, and non-governmental organizations participating in Issue Advisory Groups and a lengthy settlement negotiation process.[26] APGI commissioned 22 technical studies on the impact of the project in environmental, economic, recreation, and cultural areas.[27] On May 7, 2007, APGI submitted a Relicensing Settlement Agreement which promised many benefits to the project area, signed by 23 stakeholders, to the Federal Energy Regulatory Commission (FERC).[28]
In January 2007, the Stanly County Commissioners announced they would oppose APGI's relicensing because they were worried the company would not be forced to clean up environmental problems remaining at the site and in the Yadkin, and because granting the license to another entity,[29] which would use the hydro-electricity created by the Yadkin River to create jobs, would better serve the public interest.[30] In 2008, North Carolina governor Mike Easley authorized a study of the effect of APGI's relicensing. APGI supported this study, whose findings have not been issued.[31]
In April 2008, FERC issued a Final Environmental Impact Statement (EIS) for the Yadkin Project, concluding that federal takeover would not be a reasonable alternative for the project, and noting that no federal agency had suggested that federal takeover would be appropriate, or had expressed an interest in operating the project.[32][33] However, due to questions involving Alcoa's state water quality certificate,[34] FERC has not made a final determination on the issuance of a license, and APGI has been operating under a temporary license.[35]
In April 2009, North Carolina Governor Beverly Perdue issued a statement opposing APGI's relicensing and supporting legislation to establish a public trust to hold the license to use the Yadkin to generate hydro-electricity.[36] With bipartisan support the N.C. Senate overwhelmingly passed legislation to establish the "public trust", but Alcoa supporters defeated the bill in the N.C. House.[37][38]
A year later Republican Senator Fletcher Hartsell, again supporting establishing a "public trust", introduced a bill to create the Uwharrie Regional Commission.[39]
In the final days of the 2010 legislative session, UNC-TV anchorwoman Eszter Vajda produced a documentary ("The Alcoa Story") about Alcoa's operations in North Carolina.[40] However, before the program aired Ms. Vajda expressed concerns to legislators that, because criticizing a powerful corporation like Alcoa would be controversial, executives at UNC-TV might refuse to air her documentary.[41] Subsequently, a Senate committee subpoenaed Vajda's documentary, sparking a debate over whether UNC-TV (which is owned by state government), was subject to 'public records' laws or whether it had a 'special exemption.'.[40] The documentary was aired in the Senate Committee and then broadcast on UNC-TV (with a credit stating it was broadcast "without the usual editorial scrutiny").[42]
After the documentary – focusing on Alcoa's environmental records – was broadcast, both the House and Senate passed Senator Hartsell's legislation to establish the Uwharrie Regional Commission.[43]
Later, when additional public records released by UNC-TV revealed that an independent researcher working on the story for Vajda had accepted $3,000 from a supporter of establishing the public trust, and after learning Ms. Vajda had told legislators about her concerns UNC-TV might balk at airing her film, UNC-TV terminated Vajda's employment.[44] It also removed online footage of her documentary.[45]
Celebrity activist Erin Brockovich spoke for supporters of the Yadkin River Trust at a news conference in Raleigh, North Carolina.[46][47] Later in the day, the Yadkin Riverkeeper sponsored her appearance at Wake Forest University.[48][49]
The debate over Alcoa's relicensing and the establishment of a public trust has been contentious. In addition to the Relicensing Settlement Agreement signatories, APGI has gained the support, principally, of the N.C. Property Rights Coalition (which in June 2010 broadcast radio spots calling 'recapturing' Alcoa's license to control the Yadkin River a government takeover of private property); Rick Miller, President of the National Hydropower Association[50] and a local newspaper editorial board.[51][52][53][54] According to a poll paid for by APGI and done by McLaughlin & Associates, North Carolina's citizens are predominantly against the state taking over the project.[55]
Stanly County was supported by Governor Beverly Perdue and her Commerce Secretary (a former president of the Stanly-County-initiated N. C. Water Rights Coalition),[56] the Yadkin Riverkeeper, a number of elected officials and the NC Water Rights Commission which has aired internet videos about Alcoa's environmental record and rebutting Alcoa's property rights claims.[57] Also supporting the public power agency is the nonprofit organization Central Park NC.[58]
In 2013, Stanly County agreed to support Alcoa's license renewal.[59]
On July 29, 2013, the state Department of Environment and Natural Resources recommended approval for relicensing. However,[60] on August 2, the state filed a lawsuit claiming Alcoa did not own land under its lakes. The suit also asked that the state be granted rights to the dams. Governor Pat McCrory said, "The Yadkin River is a North Carolina river. We should be able to use it for North Carolina water needs and to create North Carolina jobs. The benefits of the Yadkin River belong to North Carolina's people."[61] APGI believed it would prevail because of a 2012 United States Supreme Court decision in favor of a Montana power company. Another suit claimed North Carolina had owned the land since it was one of the thirteen original colonies.[61] APGI lawyers claimed that the state could not use this argument because it had waited too long to do so.[10]
On April 22, 2015, U.S. District Judge Terrence Boyle ruled that the Yadkin River was not navigable at the time of United States independence from Great Britain, meaning that the state of North Carolina would not have ownership of it from that time. This means the riverbed may have been included in land purchases by Alcoa and other companies that preceded it. Alcoa attorneys said the company did own the land and the state did not have a claim. A determination of who owned the riverbed was to be made in a trial.[62][63]
On August 27, while asking attorneys questions that would help him determine whether to dismiss the 2013 lawsuit, Boyle accused North Carolina of acting like "a banana republic" and said the state was merely trying to punish Alcoa for taking away hundreds of jobs.[64] Boyle dismissed the state lawsuit on September 28, saying the state had seven years to take action and did not do so until Alcoa's use of the property changed to something the state did not want. The ruling establishes that Alcoa owns the riverbed.[65] The 4th Circuit Court of Appeals upheld the ruling in 2017.[66] On February 20, 2018, the U.S. Supreme Court turned down an appeal.[67]
On September 22, 2016, Alcoa received a license to operate until March 31, 2055, a period 12 years shorter than desired. The license requires a minimum water level and a swimming beach for High Rock Lake. The terms of the license will apply to Cube Hydro Carolinas, which bought the hydroelectric power operations.[68]
As part of the relicensing process, 4700 acres, including 76 miles of shoreline on the Yadkin River, was being sold to the N.C. Wildlife Resources Commission and the LandTrust for Central North Carolina, on the condition that within five years they raise the $10 to $12 million to buy the land. LandTrust executive director Travis Morehead said 4300 additional acres would be purchased from Alcoa. All 9000 acres were part of the game lands program, and the sale would guarantee that this continued.[69] In September 2019, phase one of what was called the Alcoa Lands Project was completed with the purchase of 2,463 acres and 45 miles of High Rock Lake shoreline for $7.7 million. A year later nearly 1000 acres were added at Morrow Mountain State Park. On September 13, 2021, the wildlife commission announced the $7.82 million purchase of 2,424 acres, 2,162 owned by Alcoa, in four counties, including 31 miles of Tuckertown Reservoir shoreline in Davidson and Montgomery Counties. The properties are now referred to as the Yadkin River Game Lands.[70]
The last remaining FERC requirement for a new Alcoa Yadkin Project license was Section 401 water quality certificate, and opposition to Alcoa's relicensing centered around it. In November 2007, the NC Division of Water Quality (DWQ) issued APGI a Section 401 water quality certificate for the Yadkin Project. The certificate was later withdrawn due to the failure of DWQ to publish a required public notice.[73] APGI reapplied for a water quality certificate, which DWQ issued on May 9, 2009.[74][75][76] In part, the certificate required APGI to make upgrades which would improve dissolved oxygen (DO) levels in the dam releases. Some upgrades have been made at the Narrows dam, although the complete upgrade program will not be completed until after the issuance of a license. Stanly County filed a legal appeal of the certificate and a court granted a stay of its execution.[77] In October 2010, as hearings on the appeal took place, the state Department of Environment and Natural Resources reduced the amount of a surety bond required by the 401 water quality certificate from $240 million to $80 million, the amount APGI states will be required to make improvements required in the certificate.[78]
Then, in the fall of 2010, lawyers for Stanly County and the Yadkin Riverkeeper confronted Alcoa executives with internal Alcoa emails documenting that Alcoa had withheld information and misrepresented facts about its pollution from the Department of Natural and Natural Resources.[79] When the emails were made public DENR promptly revoked Alcoa's water quality certificate and, on December 2, 2010, Administrative Law Judge Fred Morrison Jr. suspended hearings.[80]
On January 28, 2011, APGI released more internal documents and filed an appeal of the certificate revocation, stating "In its revocation notice, the DWQ quotes selected portions of e-mails that do not provide the complete story and were taken out of context. If you read the entire e-mail chains in context, and review the entire record, you find that no material information was withheld."[81][82] APGI also released a study of dissolved oxygen levels leaving the Narrows and Falls reservoirs, where planned upgrades have been partially implemented. This report, Alcoa claimed, showed that, for the past three years, Falls tailwaters substantially met the state instantaneous dissolved oxygen standard over 99.5% of the time, and that in 2010 Narrows tailwaters met the state instantaneous DO standard 93.4 percent of the time.[83][84] APGI also announced in January 2011 the establishment of an environmental toll-free hotline managed by EthicsPoint.[85]
In a separate legal case, on May 3, 2011, a Federal Appeals Court in Washington, D.C. ruled against APGI, which had argued the state's actions were improper.[86]
The state revoked the water quality certificate again in 2013 due to concerns over ownership.[87]
In May 2015, administrative law judge Selina Brooks ruled that the Division of Water Quality did not have the right to deny a certificate and required a decision by the end of June.[88]
Most who attended a state Department of Environment and Natural Resources public hearing on July 1, 2015, opposed a new permit, while Yadkin Riverkeeper Will Scott wanted higher standards.[89]
On September 25, Wake County Superior Court Judge Bryan Collins said the state Department of Environment and Natural Resources wrongly denied a certificate and gave the department a month to grant it.[90]
On October 23, the state said it approved the certification on the condition Alcoa provide $48 million for improvements.[91] but on October 28, Special Deputy Attorney General I. Faison Hicks asked the Federal Energy Regulatory Commission to wait for a U.S. Fourth Circuit Court of Appeals lawsuit to be settled before making a decision about the 50-year license.[92]
Tapoco Project
The Tapoco Project (originally Tallassee Power Company) includes four dams in North Carolina and Tennessee, on the Little Tennessee and Cheoah rivers. The Tapoco Project comprises four developments: Calderwood, Cheoah, Chilhowee, and Santeetlah.[93] The dams supplied power to Alcoa's operations in Alcoa, Tennessee, an aluminumsmelting and rolling mill.[94]TVA assists Brookfield Smoky Mountain Hydropower in determining the daily operation levels of the Tapoco developments to best match expected flow releases from Fontana Dam, since TVA's Fontana Dam serves as the primary flow control facility for the lower Little Tennessee River area.[95] Combined, the four developments have a licensed capacity of 380.1 megawatts.[93]
Around 1910, Aluminum Company of America began looking at locations to produce hydroelectric power for making aluminum. The company purchased Knoxville Power Company, chartered in 1900. At the end of 1913, Aluminum Company of America bought Tallassee Power Company (chartered in 1905), Western Carolina Power and Transportation, Union Development Company, and Union Power and Water Company. All of these companies became part of Tallassee Power Company. From the first two letters of each word came the name Tapoco, given first to the community and then to the company. The aluminum smelter first began operation in 1913.
World War I increased the need for aluminum, and Southern Railway completed a railroad extension to the planned Cheoah Dam in 1916. The Cheoah Dam began operation in 1919.
Construction of Santeetlah Dam began in 1926, with the Rhymer's Ferry powerhouse starting operation in 1928. Calderwood Dam was completed in 1930.[96]Chilhowee Dam was the last completed, in 1957.[97] The North Plant fabricating facility opened in 1942 to help meet the aluminum needs for World War II.
The company received its federal license to operate these dams in 1955 but was unable to renew until it resolved concerns over flooding in the Great Smoky Mountains National Park as a result of the Chilhowee Dam. The Tapoco Project and Licensing Act of 2004 corrected the problem by trading land, with 6,000 acres (24 km2) going to the park and about 10,000 acres (40 km2) of Alcoa land receiving a conservation easement.[98] A 40-year license was granted January 25, 2005,[93] but smelter production ended in 2009, and in 2012 the company sold its dams.[10] Brookfield Renewable Energy Partners of Canada paid $600 million for the four dams, 86 miles of transmission lines, and 14,500 acres in 2012. Tapoco-APGI became Brookfield Smoky Mountain Hydropower on November 15 of that year.[10][99][93][100]
The Cheoah Dam is also the dam used in the movie The Fugitive where Harrison Ford's character jumps to escape.[101]
Long Sault Project
Pittsburgh Reduction company, which became Alcoa, started the Massena operation in 1902 because of significant capacity for hydroelectric power; it holds the record for longest continuous operation of an aluminum facility. Power comes from the New York Power Authority (NYPA). Alcoa's Long Sault Division owns and operates the five 115 kVtransmission lines that connect NYPA to Hydro-Québec, which originally connected NYPA to the St. LawrenceFranklin D. Roosevelt project. Alcoa pays Cedar Rapids Transmission Company (part of Hydro-Québec) to operate two of the lines.[102][103]
^ abcdeThomason and Associates, National Register of Historic Places Eligibility Study of the Yadkin Hydroelectric Project in North Carolina, July 2004.
^"DEPARTMENT OF ENERGY, Federal Energy Regulatory Commission (Project No. 2197–073; Project No. 2206–030) Alcoa Power Generating, Inc., North Carolina; Progress Energy Carolinas, North Carolina; Notice of Public Meetings on Draft Environmental Impact Statement". Federal Register Vol. 72, No. 207. October 26, 2007. Retrieved June 3, 2011
Disambiguazione – Se stai cercando la cascina nel comune di Pieve d'Olmi, vedi Cascina San Fiorano. Questa voce o sezione sull'argomento Lombardia non è ancora formattata secondo gli standard. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. San Fioranocomune San Fiorano – Veduta LocalizzazioneStato Italia Regione Lombardia Provincia Lodi AmministrazioneSindacoMario Ghidelli (lista civica Noi con voi)&...
Czech actress Daniela KolářováBorn (1946-08-21) 21 August 1946 (age 77)Cheb, CzechoslovakiaOccupationActressYears active1967–presentSpouseJiří OrnestChildren2 Daniela Kolářová (born 21 September 1946 in Cheb) is a Czech actress. She has appeared in several Theatre Studio DVA productions.[1] Filmography Film Kawasaki's Rose (2009) Vratné lahve (2007) ... Eliška Tmavomodrý svět (2001) ... Haniččina matka Oběti a vrazi (2000) ... matka Cesta z města (2000) ......
هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (يناير 2020) نايت هينيسي سكولارز معلومات التأسيس 2016 الموقع الجغرافي البلد الولايات المتحدة سميت باسم فيل نايت، وجون هينيسي إحصاءات الموقع الموقع الرسمي ...
Astragalus nitidiflorus Klasifikasi ilmiah Kerajaan: Plantae (tanpa takson): Angiospermae (tanpa takson): Eudicots (tanpa takson): Rosids Ordo: Fabales Famili: Fabaceae Genus: Astragalus Spesies: Astragalus nitidiflorus Nama binomial Astragalus nitidiflorusJimenez & Pau Astragalus nitidiflorus adalah spesies tumbuhan yang tergolong ke dalam famili Fabaceae. Spesies ini juga merupakan bagian dari ordo Fabales. Spesies Astragalus nitidiflorus sendiri merupakan bagian dari genus Astragalus.&...
Опис файлу Опис Постер до фільму «Дев'ять життів кота Фріца» Джерело The Nine Lives of Fritz the Cat.jpg (англ. вікі) Час створення 1974 Автор зображення Авторські права належать дистриб'ютору, видавцю фільму або художнику цього постера. Ліцензія див. нижче Обґрунтування добропорядного вик
.912-.875 .874-.855 .854-.835 .834-.815 Mount Athos This is a list of the administrative regions of Greece by Human Development Index as of 2023 with data for the year 2021.[1] Rank Province HDI (2021) Very high human development 1 Attica 0.909 – Greece (average) 0.887 3 Western Macedonia 0.877 4 Ionian Islands 0.876 Epirus Crete 5 Central Macedonia 0.873 Thessaly 6 North Aegean 0.865 Peloponnese South Aegean 7 Central Gr...
Ця стаття містить інформацію, яку треба перевірити на наявність недостовірних фактів і хибних даних. Будь ласка, ознайомтеся з відповідним обговоренням та допоможіть виправити недоліки. (жовтень 2020) У Вікіпедії є статті про інші населені пункти з такою назвою: Біличі. ...
Fabbrica d'Armi Pietro Beretta S.p.A.JenisSwastaIndustriSenjata apiDidirikan1526; 496 tahun lalu (1526)KantorpusatBrescia, ItaliaProdukSenjata api, senjataIndukBeretta HoldingSitus webWebsite resmiWebsite resmi ASWebsite resmi Defense Fabbrica d'Armi Pietro Beretta [ˈfabbrika ˈdarmi ˈpjɛtro beˈretta] (secara harfiah, Pabrik Senjata Pietro Beretta) adalah perusahaan manufaktur senjata api swasta dari Italia yang beroperasi di beberapa negara. Senjata api produksinya digunakan di selu...
У Вікіпедії є статті про інші значення цього терміна: Костел Святого Антонія. У Вікіпедії є статті про інші значення цього терміна: Костел францисканців. Костел Святого Антонія 49°50′27″ пн. ш. 24°02′47″ сх. д. / 49.8410556° пн. ш. 24.0465833° сх. д. / 49.841055...
Artikel ini membutuhkan rujukan tambahan agar kualitasnya dapat dipastikan. Mohon bantu kami mengembangkan artikel ini dengan cara menambahkan rujukan ke sumber tepercaya. Pernyataan tak bersumber bisa saja dipertentangkan dan dihapus.Cari sumber: Kota Tasikmalaya – berita · surat kabar · buku · cendekiawan · JSTORTasikmalaya beralih ke halaman ini. Untuk kabupaten bernama sama, lihat Kabupaten Tasikmalaya. Untuk kegunaan lain, lihat Tasikmal...
Historic siteCawdor CastleCawdor Castle from the eastCoordinates57°31′27″N 3°55′35″W / 57.5243°N 3.9264°W / 57.5243; -3.9264 Listed Building – Category ADesignated26 January 1971Reference no.LB1728 Inventory of Gardens and Designed Landscapes in ScotlandDesignated1 July 1987Reference no.GDL00099 Location in Highland council area Cawdor Castle is a castle in the parish of Cawdor in Nairnshire, Scotland. It is built around a 15th-century tower hou...
Fictional character in Orange is the New Black Fictional character Miss RosaOrange Is the New Black characterBarbara Rosenblat as Miss RosaFirst appearanceI Wasn't Ready (2013)Last appearanceWe Can Be Heroes (2015)Portrayed byBarbara RosenblatStephanie Andujar (young)In-universe informationAliasRosa Cisneros Young RosaSignificant otherMarco Andy Rosa Miss Rosa Cisneros is a fictional character from the Netflix dramedy series Orange Is the New Black, played by Barbara Rosenblat. The character ...
Disney media franchise This article is about works featuring Disney's version of Tarzan. For the original book series by Edgar Rice Burroughs, see Tarzan (book series). For other adaptations, see Tarzan in film and other non-print media and Tarzan in comics. Disney's TarzanOriginal workTarzan (1999)OwnerThe Walt Disney CompanyBased onTarzanby Edgar Rice BurroughsFilms and televisionFilm(s)Tarzan (1999)Animated seriesThe Legend of Tarzan (2001–2003)Direct-to-video Tarzan & Jane (2002) Ta...
Railway station in Kimitsu, Chiba Prefecture, Japan Tawarada Station俵田駅Tawarada StationGeneral informationLocationTawarada 1630, Kimitsu-shi, Chiba-ken 292-0455JapanCoordinates35°18′53.01″N 140°3′40.24″E / 35.3147250°N 140.0611778°E / 35.3147250; 140.0611778Operated by JR EastLine(s)■ Kururi LineDistance21.0 km from KisarazuPlatforms1 side platformOther informationStatusUnstaffedWebsiteOfficial websiteHistoryOpenedJuly 10, 1921PassengersFY200664 dai...
الحياة ولا شيء سواهازندگی و دیگر هیچ (بالفارسية) ملصق الفلممعلومات عامةالصنف الفني فيلم دراما[1][2][3] تاريخ الصدور 1992 19 نوفمبر 1992[4] (ألمانيا) مدة العرض 95 دقيقة اللغة الأصلية الفارسية البلد إيران الطاقمالمخرج عباس كيارستمي[1][2][3] السيناريو عباس كي...
Knight's Cross recipientsAllgradesGrand CrossGolden Oak Leaves, Swordsand DiamondsOak Leaves, Swords and DiamondsOak Leaves and SwordsOakLeaves 1940–41 1942 1943 1944 1945 Foreign Knight'sCross A Ba–Bm Bn–Bz C D E F G Ha–Hm Hn–Hz I J Ka–Km Kn–Kz L M N O P Q R Sa–Schr Schu–Sz T U V W X–Z Foreign Knight's Cross The Knight's Cross of the Iron Cross (German: Ritterkreuz des Eisernen Kreuzes) and its variants were the highest awards in the military and paramilitary forces...
This article contains summaries of characters appearing on the TV series Studio 60 on the Sunset Strip. Major roles Busfield, Corddry, Paulson, Hughley, Weber, Perry, Peet, Whitford Danny Tripp (Bradley Whitford) is a producer who takes over show-running duties with Matt Albie, his long-time friend, and who worked on the show four years prior, before leaving with Matt over disagreements with network executives. In the pilot, it is revealed that he has a history of alcoholism and drug problems...
Tool used to play stringed instruments Three plectra for use with guitar A plectrum is a small flat tool used for plucking or strumming of a stringed instrument. For hand-held instruments such as guitars and mandolins, the plectrum is often called a pick and is held as a separate tool in the player's hand. In harpsichords, the plectra are attached to the jack mechanism. Plectra wielded by hand Guitars and similar instruments Assorted plectra for use with guitar Main article: Guitar pick A ple...
American reality television series This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (May 2017) Extreme Cougar WivesGenrereality television showDirected byRobin AcuttStarring Kathy Newman Hattie Wiener Desmond Huey Sheri Winkelmann Kevin A. Herrera Octavio Quilichini ComposerSean BaillieCountry of originUnited States of AmericaOriginal languageEnglishNo. of seasons1No. of episodes3Prod...
Hiking trail in Yosemite National Park, California, US Panorama TrailNevada Falls with Liberty Cap and the back of Half Dome from Panorama TrailLength8.5 miles (13.7 km) one-wayLocationCalifornia, United StatesTrailheadsHappy Isles trailhead, Yosemite ValleyGlacier PointUsebackpacking, hiking, trail running, trail ridingElevation change3,200 feet (980 m)Highest pointGlacier Point trailhead, 7,200 feet (2,200 m)Lowest pointHappy Isles trailhead, 4,000 feet (1,200 m)Difficul...