The service is operated by 18-carriage Class 373 trains at up to 300 km/h (186 mph) on a network of high-speed lines. Since Eurostar began in 1994, new lines have been built in Belgium (HSL 1) and Southern England (High Speed 1) to the same standard as the LGV Nord line originally used in France, reducing journey times. The two-stage Channel Tunnel Rail Link project was completed on 14 November 2007, when the London terminus of Eurostar transferred from Waterloo International to St Pancras International station.
They're used to be used on sleeper services in Britain. Eurostar has three locomotives for the rescue of failed trains, route learning and driver training, In November 2007 they were sold to Direct Rail Services[1]
Intended to operate sleeper services over non-electrified parts of the railway network in Britain. Eurostar retained three locomotives for the rescue of failed trains, route learning and driver training, but sold them to Direct Rail Services when the new Temple Mills Depot opened in November 2007.[5]
Were used primarily to rescue failed trains. Eurostar operated two of these from its North Pole depot until 2007, when they were loaned to a pair of educational initiatives having become redundant following the move to Temple Mills.[6][7]
Intended to operate the Nightstar sleeper services. Eurostar owned seven units of this class, which never saw service until they were sold in 2007 to Europorte 2.[8]