The Y-49 Cable travels between the Sprain Brook Substation in Yonkers, Westchester County (operated by Consolidated Edison) to the East Garden City Substation in Uniondale, Nassau County (operated by NYPA).[1][2] It travels under the Long Island Sound between Westchester County and Long Island; this undersea section is roughly 8 miles (13 km) in length (the entire line is roughly 26 miles (42 km) long).[3][1][4] The average depth of the undersea section is 10–15 feet (3.0–4.6 m) below the Long Island Sound's seabed.[1]
Y-49 is one of five undersea transmission lines connecting between Long Island and the Continental United States as of 2021 (four of which are operated by NYPA).[5]
History
The cable began operating in May 1991, and has a capacity of 675 megawatts.[1][4]