Vermont Route 279 (VT 279), often referred to as the Bennington Bypass, is a freeway bypass of Bennington in Bennington County, Vermont, in the United States. It extends for roughly 6.7 miles (10.8 km) from the New York state line northwest of Bennington to an intersection with VT 9 east of the downtown district. At its west end, VT 279 connects to New York State Route 915G (NY 915G), an unsigned reference route leading to New York State Route 7 (NY 7) in Hoosick, New York.
The section of VT 279 west of U.S. Route 7 (US 7) officially opened to traffic in 2004; however, portions of the route have been open in some capacity since the 1970s. An extension of VT 279 southeast to VT 9 was completed in 2012.
Past VT 67A, the bypass widens to four lanes and becomes a divided highway as it passes over VT 7A and approaches a complex interchange with US 7. The route briefly overlaps with the freeway before continuing eastward as a two-lane highway toward the western edge of Green Mountain National Forest. After 1 mile (1.6 km), VT 279 turns southward, loosely paralleling the forest's west boundary as it bypasses the northeastern section of downtown Bennington. The route crosses the Roaring Branch of the Walloomsac River before ending at a half-completed single-point urban interchange (SPUI) with VT 9 east of downtown.[3]
History
The four-lane portion of VT 279 between VT 67A and US 7 was built in the early 1970s[4] and designated VT 67A Connector in 1974.[5] However, construction did not begin on the remainder of the route west of VT 67A (including the short continuation into Hoosick, New York) until the early 2000s.[4] Work on the bypass concluded with the opening of VT 279 on October 12, 2004.[2] The number "279" was chosen because it provides a bypass for both US 7 and VT 9.[6]
Construction on an extension of VT 279 southeast to VT 9 began in July 2007. The highway was built as a two-lane undivided roadway, similar to that constructed between Hoosick and Bennington.[7] It was officially opened on August 30, 2012, and cost roughly $70 million to build.[8] Construction plans for the northern segment called for the existing interchange between US 7 and VT 279 to be reconfigured to accommodate a welcome center located within the exit[7] that was completed and officially opened on October 11, 2013.[9]
Exit list
This list includes VT 279's continuation into New York as NY 915G. All exits are unnumbered.