In early 2015, Talsarnau was one of several stations on the Cambrian Coast Line to get a Harrington Hump (rather than raising the whole platform, a raised area is built where the middle doors of the train are when it stops at Talsarnau) made of paving slabs, cement and tarmac. This means that for those getting off or on the train through the middle doors of the train, the vertical step is very much reduced.
From 1 September 2023 engineering work is taking place to finish restoration of the Barmouth Viaduct. Rail replacement buses will serve all stations from Pwllheli to Machynlleth until 1st December.[1]
Jowett, Alan (March 1989). Jowett's Railway Atlas of Great Britain and Ireland: From Pre-Grouping to the Present Day (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN978-1-85260-086-0. OCLC22311137.