You can help expand this article with text translated from the corresponding article in Chinese. (June 2015) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at [[:zh:臺東線]]; see its history for attribution.
You may also add the template {{Translated|zh|臺東線}} to the talk page.
The coastal branch lines of Hualien and Taitung were discarded after the broadening plan in 1982. The broadcasts of the station names on Taitung line are made in five languages: Mandarin, Taiwanese Hokkien, Hakka, English, and Amis. The Taitung Line is the only line in Taiwan where broadcasts are made in the Amis language.
History
The north segment from Karenkō (花蓮港, now Hualien City) to Poshiko (璞石閣 ポシコ, then Tamazato, now Yuli) was built in 1909 and completed in 1917. The south segment from Hinan (卑南, then Taitō, now Taitung City) to Rirō (里巄, now Guanshan) was opened in 1919 by the Taitō Development Company (臺東開拓株式會社).
In 1922, the Taitō Development Company bought the railroad from Karenkō to Tamazato and named it the "Taitō North Line", while the south segment from Taitō to Rirō was named the "Taitō South Line."
The construction of the connecting railway between Tamazato to Rirō began in 1921 and completed in 1926, after which the total length of the line from Karenkō (Hualien City) to Taitō (Taitung City) was 171.8 km.
In 1966, the Kuang-Hua Express (光華號) utilizing diesel multiple units started service on the line, and greatly shortening the travel time from Hualien to Taitung from 6–7 hours to 3–4 hours.
Its gauge was changed from 2 ft 6 in (762 mm) narrow gauge to 3 ft 6 in (1,067 mm) gauge in 1982 and connected with North-link line, after which the old Hualien Station was abandoned and replaced by the Hualien railway station that is used now. The site of old Hualian Station was eventually turned into Dongdamen Night Market in 2015, while the disused right of way has been partially turned into a pedestrian area.[4]
In 2007, the Environmental Protection Administration gave the line a conditional pass for an electrification project, which would boost the operating speed from 110 km/h to 130 km/h.[5] In 2009, construction began on electrification work, with NT$15.5 billion set aside for the project.[6] Electrification work was completed in late 2013 with the inauguration of electric services taking place in late June 2014.
The section between Nanping and Wanrong railway stations was to be upgraded from a single-track railway to a dual-track railway and was expected to be completed by December 2020. With the existing double-track sections from Shoufeng to Nanping railway station and from Wanrong to Guangfu railway stations, it was expected that service frequency could be improved, shortening wait times.
This article needs to be updated. The reason given is: This article contains references to things that may have already happened. Please help update this article to reflect recent events or newly available information.(November 2022)
On October 12 2020, the Ministry of Transport has approved and intends to carry out upgrading works on the Taitung Line to ensure that the entire line is double-tracked. As 69% of the line is still currently single-tracked, the project is expected to shorten wait times by up to 90 minutes with up to 16 more train services each day. Some trips can be reduced by up to 50 minutes. With an increase of 17,000 passengers per day, the dual-track railway project is expected to cost NT$25.429 billion, which will be completed 7 years after the environmental impact assessment and comprehensive planning are approved.[citation needed]
The Railway Bureau has stated that the project will be carried out in 2 phases. Phase 1 will include the sections north of Yuli (Hualien - Shoufeng, Guangfu - Ruisui and Sanmin - Yuli) and the section between Taitung and Zhiben and is expected to be completed by 2026. Phase 2 will include the remaining sections of the line and is expected to be completed by 2027.
Electrification of the Hualien-Taitung Line
Together with the electrification of the Hualien-Taitung Line, the following stations were upgraded.