The STM 500 is a Turkish modern coastal submarine of the 500-tonne class under construction since 2022. The shallow-water small diesel-electric attack submarin…
The STM 500 is a Turkish modern coastal submarine of the 500-tonne class under construction since 2022. The shallow-water small diesel-electric attack submarine is being built by Turkish defense company STM with completion of the first vessel not expected until 2026.[1] As of June 2022[update], the customer for the project had not yet been publicly released.
The STM-500 was announced in 2021 at the 10th Naval Systems Seminar in August 2021 as a lower cost and more cost effective subsurface warfare option.[2] Construction began in 2022. It is expected to require four years to complete construction, and up to six years to fully complete the project.[1]
The STM-500 will displace more than 500 tonnes, have a crew of 18, and be able to transport a squad of 6 special forces personnel. It is being designed to have an endurance of 30 days and a maximum dive depth of more than 200 meters.[1]
Specifications as of 2025 include:[1][3]
Weapons include up to eight "modern heavy-weight torpedoes or guided missiles, delivered via four torpedo tubes.[1] Torpedoes can be fired simultaneously. The submarine will be able to carry and launch underwater drones.[2]
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.