Russian supercarrier proposal
A model of Project 23000E at the international military-technical forum Army-2015.
|
Class overview |
Name | Shtorm class |
Builders | Unknown |
Operators | Russian Navy (planned) |
Preceded by | |
Cost | ~US$5.5 billion (for export version) |
General characteristics |
Type | Aircraft carrier |
Displacement | 90,000–100,000 tons[1] |
Length | 330.1 m (1,083 ft)[1] |
Beam | 40 m (131 ft)[1] (waterline) |
Draught | 11 m (36 ft)[1] |
Installed power | Nuclear reactor RITM-200[2] or RITM-400[3] |
Propulsion | 4 × propellers |
Speed | 25–30 kn (46–56 km/h; 29–35 mph)[1] |
Sensors and processing systems |
- Integrated sensors, including:[1]
|
Armament | Four anti-aircraft systems (unspecified) possibly S-400 missile system |
Aircraft carried | |
Aviation facilities | |
Notes | Dual island design[1] |
Project 23000 or Shtorm (Russian: Шторм, lit. 'Storm') is a proposal for an aircraft carrier designed by the Krylov State Research Center for the Russian Navy.[1] The cost of the export version (Project 23000E) has been put at over US$5.5 billion,[4] and as of 2017 development had been expected to take ten years.[4] As of 2020[update], the project had not yet been approved and, given the financial costs, it was unclear whether it would be made a priority over other elements of Russian naval modernization.
History
The carrier is being considered for service with the Russian Navy's Northern Fleet as a replacement for heavy-missile cruiser Admiral Kuznetsov which was commissioned in 1991. The Nevskoye Design Bureau is also reported to be taking part in the development project.[5] Although the creation of a new aircraft carrier, along with the Lider-class destroyers, has been postponed by Russian President Vladimir Putin, it is still mentioned in the Russia's State Armament Programme for 2018–2027 released in May 2017.[6] According to Russian officials, a new heavy aircraft carrier should be laid down between 2025 and 2030.[citation needed] In 2020, it was reported that, if built, the carrier might also be fitted with the proposed S-500 surface-to-air missiles.[7]
In early July 2016, the design of the aircraft carrier was offered to India for purchase.[8][4]
See also
References