Nordhordland Bridge

Nordhordland Bridge
Coordinates60°31′26″N 05°15′52″E / 60.52389°N 5.26444°E / 60.52389; 5.26444
CarriesTwo lanes of E39
One pedestrian/bicycle path
CrossesSalhusfjorden
LocaleBergen and Alver, Norway
Official nameNordhordlandsbrua
Maintained byNorwegian Public Roads Administration
Characteristics
MaterialConcrete
Total length1,614 m (5,295 ft)
Height99 m (325 ft)
Longest span172 m (564 ft)
Clearance below32 m (105 ft)
History
DesignerAas-Jakobsen
Opened22 September 1994
Statistics
Daily traffic17,487 (2016)[1]
TollYes, since 2019. Also 1994–2005.
Location
Map

The Nordhordland Bridge (Norwegian: Nordhordlandsbrua) is a combined cable-stayed and pontoon bridge which crosses Salhusfjorden between Klauvaneset (in Bergen Municipality) and the island of Flatøy (in Alver Municipality) in Vestland county, Norway. It is 1,614 meters (5,295 ft) long, of which the pontoon section is 1,246 meters (4,088 ft) long. The cable-stayed section consists of a single 99-meter (325 ft) tall H-pylon which has a length of 368 meters (1,207 ft) and a main span of 172 meters (564 ft). This allows for a clearance of 32 meters (105 ft).

The floating section is a steel box girder bridge with ten pontoons, which because of the fjord's depth are not laterally anchored. The roadway sits on an orthotropic deck. The pontoons and the cable-stayed bridge are built in concrete, with the main span being supported with 48 cables. The fjord end of the main span is supported by a 30-meter (98 ft) deep foundation, where the two bridges meet. From there and for 414 meters (1,358 ft), the roadwall has a 5.7 percent gradient on a viaduct anchored to the pontoon bridge.

The bridge carries two lanes of European Route E39, also called the Coastal Highway, and one pedestrian and bicycle path, and connects the district of Nordhordland to Bergen. Plans for a bridge had existed since the 1960s, and after the decision to construct the bridge was passed by the Parliament of Norway in 1989, construction started in 1991. Total costs, including auxiliary roads, was NOK 910 million. Part of the contract payment was subject to a court case which the contractors lost. The bridge opened on 22 September 1994, and remained a toll road until 31 December 2005. In 2014, it had an average daily traffic of 16,580 vehicles. Tolls were reinstated on the bridge in 2019 to finance other road projects in the area. The bridge is the second-longest in Norway, and the second pontoon bridge in Norway.

Specifications

The point where the pontoon and cable-stayed bridges are connected

The bridge consists of three sections, a cable-stayed bridge, a pontoon bridge and a viaduct which connects the two. The cable-stayed bridge consists of a 99.3-meter (326 ft) tall H-pylon with a foundation at Klauvaneset on the mainland of Bergen. It supports a 172-meter (564 ft) main span, with the other end being fixed in a foundation 30-meter (98 ft) below mean sea level, which is anchored in the ridge Klauvaskallen. The whole cable-stayed bridge is 369 meters (1,211 ft) long, with a 190-meter (620 ft) long viaduct, supported by six pairs of pillars. The cable-stayed bridge allows for a sailing channel which is 32 meters (105 ft) tall and 50 meters (160 ft) wide. The main span is built in lightweight LC55 concrete, while the viaduct and pylon is built with conventional C45 concrete. Inside the pylons is a 1.6-by-2.0-meter (5 ft 3 in by 6 ft 7 in) hollow area.[2]

The bridge has 48 cables, 12 on each side of the pylon on each side of the roadway. The distance between the cables is 12.00 meters (39.37 ft) on the main span, and 9.33 meters (30.6 ft) on the viaduct. Combined, the cables are 4,432 meters (14,541 ft) long; each cable consists of 67 to 230 twined cables, each with a 7-millimeter (0.28 in) diameter. The cables have a weight of between 1.5 and 14.5 tonnes (1.5 and 14.3 long tons; 1.7 and 16.0 short tons) each, and they have a capacity of between 1,960 and 7,910 kilonewtons (440,000 and 1,780,000 lbf). They can be tightened at the connection with the roadwall.[2]

The cable-stayed section

The floating section consists of a steel box girder placed on top of ten floating pontoons. The pontoon section is anchored only at both ends, on the underwater foundation at Kauvaskallen and on Flatøy. It is fastened using flexible plate connections fastened by bolts and cables under tension. These are flexible around the horizontal axis at right angles towards the axis of the bridge, allowing for deformation caused by the tide. The fastening on Flatøy consists of a massive concrete block 22 by 20 meters (72 by 66 ft) long and 14.5 meters (48 ft) tall which was poured into a blast-out foundation pit in bedrock. Vertical pretension rock anchors have also been installed, with 12 at Klauvaskallen and 14 at Flatøy, giving 42 and 44 meganewtons (9,400,000 and 9,900,000 lbf) of support, although they were only built to increase the safety factor.[2]

There are ten lightweight concrete pontoons, with 113.25-meter (371.6 ft) spans between them. The pontoons are between 7.0 and 8.6 meters (23.0 and 28.2 ft) in height. The draught varies between 4.3 to 5.6 meters (14 to 18 ft). Each pontoon consists of nine watertight cells which are partially filled with ballast for trim. The cells are dimensioned so two adjacent cells can fill with water without endangering the bridge.[2]

The deck

The roadway lies on top of an orthotropic deck on a steel box girder, which is 15.9 meters (52 ft) wide, 5.50 meters (18.0 ft) tall and 1,246 meters (4,088 ft) long. The steel box girder weighs 14,150 tonnes (13,930 long tons; 15,600 short tons), of which 3,000 tonnes (3,000 long tons; 3,300 short tons) is high-strength low-alloy steel. The girder has an octagonal shape and is made with 14-to-20-millimeter (0.55 to 0.79 in) thick steel plates. They are longitudinally stiffened by trapezoidal stiffeners supported by cross frames at most every 4.5 meters (15 ft). Two full bulkheads have been used for every pontoon pilaster, made from welded steel plates 8 to 50 millimeters (0.31 to 1.97 in) thick. External brackets built into the bulkheads transfer the support forces to the pontoons. The girder was built in sections of 21, 36, and 42 meters (69, 118, and 138 ft), which were subsequently welded together into 11 modules with a skew angle of 1.2 to 1.3 degrees. The girder has a constant cross-section throughout the length, except at the anchoring points to the pontoons. The section from the land anchoring to the first pontoon is subject to the most stress, and is made with steel with a higher yield point. The inside of the girder has two dehumidifiers which ensure that it does not rust. The clearance under the girder is 5.5 meters (18 ft).[2][3]

The two bridges are connected with a 414.5-meter (1,360 ft) long steel viaduct, which runs on top of the floating bridge, bringing the road from 11.0 to 34.4 meters (36.1 to 112.9 ft) above mean sea level. The viaduct weighs 1,600 tonnes (1,600 long tons; 1,800 short tons) and has a gradient of 5.7 degrees. It consists of spans between 18 and 33 meters (59 and 108 ft), with the roadway also built as an orthotropic deck with 12-millimeter (0.47 in) thick plates. Overall, the construction of the bridge used 24,000 tonnes (24,000 long tons; 26,000 short tons) of concrete, of which 10,000 tonnes (9,800 long tons; 11,000 short tons) in the pontoons. The bridge was coated with 40,000 litres (8,800 imp gal; 11,000 US gal) of paint.[2]

The bridge is monitored by 132 sensors, including sensors on hatches to the pontoons, on doors to the steel box girder, for corrosion, strain gauges on the girder and on flexible elements, and weather information. On the cable-stayed section, the bridge is marked with navigation lights, as well as the center of the sailing area having a racon.[2] The bridge is the second-longest bridge in Norway, behind the Drammen Bridge.[4]

History

Planning

The single pylon

Ship services in Nordhordland started in 1866, and in 1923 the first car was purchased.[5] A car ferry service between Isdalstø in Lindås and Steinestø in Åsane on the mainland was established on 7 July 1936.[6] A plan was launched whereby all traffic from Nordhordland would be collected in one place and transported across Salhusfjorden to Åsane. By moving the ferry quay from Isdalstø to Knarvik, the length of the ferry service could be reduced. However, the fares would be kept the same and the extra revenue used to finance a bridge from Flatøy to Lindås.[7] This allowed the Alversund Bridge to open in 1958, and the ferry service from Flatøy and Meland to move to Knarvik.[5] The proposal to cross Salhusfjorden was launched during the planning of the Alversund Bridge. Cost estimates were made based on the Golden Gate Bridge in the United States, but it proved too expensive for a suspension bridge crossing between Frekhaug and Salhus.[8]

In 1962, the issue was brought up again, this time as a pontoon bridge. The depth and steepness of the fjord would make it impossible to fasten the bridge to the sea bottom. However, a method without lateral anchorage had been developed for the Hobart Bridge in Australia.[8] Another alternative was launched in 1963, involving a submerged floating tunnel through the fjord. It was estimated to cost between NOK 19.5 and 26 million.[7] Norwegian expatriate Leif J. Sverdrup, co-founder of Sverdrup & Parcel of the United States, inspected the fjord in 1965[9] and was later hired to plan the bridge in cooperation with Oslo-based civil engineering consultants Prosjektering. Municipal engineers started measuring currents in 1966.[10] Prosjektering and Sverdrup & Parcel recommended a pontoon bridge with a movable section to allow passage of ship traffic. In 1967, a new proposal was launched, in which a seaway tunnel would be blasted out in the rock on the Bergen side.[11]

The Alversund Bridge was a toll bridge which was paying for the debt accumulated in its construction. By 1968, the debt would be paid off, but the Norwegian Public Roads Administration launched a plan whereby the tolls would continue to be collected and used to finance a bridge across Salhusfjorden. This was opposed by a group of locals, who brought the issue to the courts, claiming it to be illegal, as a bridge would never be built.[8] Both Oslo District Court and Eidsivating Court of Appeal concluded that the tolls were legal, and the issue was rejected by the Supreme Court. Protests were also raised against the use of a pontoon bridge, as it would limit the vessel size and thus the commercial development in the inner parts of the fjord.[11]

In the 1970s, National Road 1 (today part of E39) was established through Knarvik towards Sognefjorden, resulting in upgrades to the roads in Nordhordland, and making the crossing one of the main routes from the north. At the same time, it was decided to establish a refinery at Mongstad in Lindås.[12] In 1971, details about the suspension bridge were again discussed, with three different proposals with the main span of between 1,090 and 1,210 meters (3,580 and 3,970 ft) with 160-meter (520 ft) tall pylons. There were protests from the Salhus area, as the suspension bridge would have resulted in the demolishing of part of the residential area.[11]

In 1972, discussion started with the plans to connect Meland, Flatøy and Lindøy with bridges. This was passed by the Parliament of Norway in May 1975, and consisted of the Krossnessundet Bridge between Flatøy and Meland, which opened in November 1978.[13] The Hagelsund Bridge opened on 1 April 1982 and connected Flatøy to Lindås and Knarvik, thus also connecting Meland and Lindås. Both bridges were partially financed with tolls. The plans for a pontoon bridge were presented to the Standing Committee on Transport and Communications on 31 March 1981. They supported the choice of a pontoon bridge. The decision to construct the bridge was taken by parliament on 9 December 1987, but they demanded that a larger ship channel be constructed.[14]

Detailed planning started in March 1990, and at first two technical methods for constructing the pontoon bridge were considered: a continuous concrete floating caisson between the abutments, and a steel version incorporating a truss bridge carrying concrete pontoons. However, they were both rejected in favor of a concrete or steel box section borne on concrete pontoons.[2]

Construction

Design of the bridge was awarded to Aas-Jakobsen and Det Norske Veritas, the former who also performed dynamic analysis and structural engineering. Architects were Hindhammer–Sundt–Thomassen, Lund & Løvseth, and Lund & Slaatto.[15][16] An H pylon was chosen instead of an A pylon both because it was more functional, and would be more aesthetic in conjunction with the other bridges in the area, particularly three suspension bridges.[2]

The technology for the bridge was based on recent technology for pontoon bridges combined with Norwegian offshore technology. Among the technologies initially considered, but later ruled out, was that used in the Homer M. Hadley Memorial Bridge and the Hood Canal Bridge in the United States. Instead, an orthotropic deck was chosen, such as the Bergsøysund Bridge had used. The choice of a box girder bridge and the orthotropic deck were chosen because it gave the lower material use. Conventional pontoon bridges have lateral anchorage systems which fasten the bridge to the seabed. The technique had previously been used down to 140 meters (460 ft), but Salhusfjorden is 500 meters (1,600 ft) deep, making the method prohibitively expensive.[17] The choice of a cable-stayed section allowed reduced traffic hazards in storms, a reduction in corrosion on the bridge deck, and improved passage of water beneath the bridge in support of wildlife.[17]

The pontoon bridge with the Krossnessundet Bridge in the background

The contract for construction of the pontoon bridge was awarded in August 1991 to a consortium, Arbeidsfellesskapet Salhus Bru, which consisted of Norwegian Contractors, Aker Entreprenør, Veidekke and Kværner Eureka. The components were built in Moss and Fredrikstad and then shipped to Lonevågen, a branch of Osterfjorden which was suitable to connect the parts. There were problems welding the high-strength low-alloy steel, which resulted in the work being halted for several days before an agreement was reached between the contractor and the Public Roads Administration. On 26 January 1994, the steel frame which would be used to fasten the pontoon bridge to the cable-stayed bridge, came adrift during transport in Skagerrak, and was severely damaged, causing a delay in the project. As the bridge had the longest laterally unsupported span in the world, the construction was watched by many international delegations.[14]

The construction of the bridge also involved other investments in road infrastructure. This included 5.7 kilometers (3.5 mi) of new highways, 4.2 kilometers (2.6 mi) of local roads, and the 785-meter (2,575 ft) long Hordvik Tunnel just south of the bridge.[18] A grade-separated crossing was built on both sides of the bridge. The intersection on Flatøy was also built as a bus interchange, and became the terminus of many bus routes in Nordhordland. Express buses would from there run directly to the city center of Bergen.[19]

The bridge project cost NOK 910 million, of which NOK 513 was for the pontoon bridge, NOK 81 million was for the cable-stayed bridge, NOK 25 million was used for the waterway, NOK 115 million was used on planning, and NOK 176 million was used on auxiliary roads and the tunnel. The bridge was financed with NOK 41 million in state grants, NOK 139 million from tolls paid in advance, and NOK 730 million in debt which would be repaid by the tolls. Interest during construction cost NOK 138 million. The construction involved 1,150,000 man-hours.[2]

Aftermath

The bridge during fog

The use of high-strength steel caused problems as it was necessary to heat the steel to 150 °C (302 °F) before and after welding, and Kværner had problems finding an adequate process during late 1992. In January 1993, an appropriate process had been found, although experimentation with various methods continued for another six months. Kværner felt that the Public Roads Administration should bear the extra costs, demanding NOK 108 million in compensation, but the administration denied this, resulting in a lawsuit. On 26 January 1996, Nordhordland District Court supported the administration, but gave the plaintiff partial support, claiming the administration should take part of the costs through improper choice of material. The Public Roads Administration was sentenced to pay NOK 34 million to Kværner. Both sides appealed to Gulating Court of Appeal, which on 18 February 1998 refuted all of Kværner's claim regarding the steel boxes, and sentenced the administration to pay NOK 7.5 million. In addition, Kværner had to pay the administration NOK 19.5 million in penalties for overrunning the contract date. However, the court's decision was not unanimous. The plaintiff appealed to case to the Supreme Court, who unanimously confirmed the ruling of Gulating Court of Appeal. In addition, the plaintiff was sentenced to pay the defendants legal costs of NOK 910,000.[20]

The bridge was officially opened by King Harald V on 22 September 1994.[21] It was the second pontoon bridge in Norway, after the Bergsøysund Bridge which opened in 1992.[22] The last tolls were collected on 31 December 2005.[23] In 2008, there were 19,700 travelers on the bridge each day, 14 percent of which used public transport.[24] In 2009, the bridge had an average daily traffic (ADT) of 14,698 vehicles, up from 7975 in 2000. Following the removal of the tolls, the ADT increased from 9912 in 2005 to 12,249 in 2006.[25] In 2010, the bridge was one of twelve finalists in Teknisk Ukeblad's competition for the most beautiful bridge in Norway.[26] In December 2010, Bergen City Council approved the Nordhordland Package, which would result in NOK 3.8 billion being used on road investments in Åsane and Nordhordland. Two-thirds of the financing is to come from tolls, which will involve reinstalling a toll plaza on the bridge. The tolls will first be set to NOK 20 for five years, and then after the completion of the first stage, the toll will be NOK 40 for fifteen years.[24] The toll plaza is scheduled to reopen in 2013.[27] Among the projects is a new four-lane Nyborg Tunnel which will shorten the distance of E39 from the bridge with the motorway at Nyborg in Bergen.[28]

References

  1. ^ Statens vegvesen – ÅDT nivå 1-punkt Hordaland
  2. ^ a b c d e f g h i j Norwegian Public Roads Administration (1994). "The Nordhordland Bridge" (PDF). Archived from the original (PDF) on 9 February 2006.
  3. ^ Mangus, Alfred R. (2002). "Orthotropic Design Meets Cold Weather Challenges" (PDF). Welding Innovation. 19 (1). James F. Lincoln Arc Welding Foundation. Archived from the original (PDF) on 19 December 2010. Retrieved 17 January 2011.
  4. ^ "Norges lengste veibro". Romerikes Blad (in Norwegian). 31 October 2009.
  5. ^ a b Styve 1994, p. 51
  6. ^ Styve 1994, p. 12
  7. ^ a b Styve 1994, p. 39
  8. ^ a b c Styve 1994, p. 20
  9. ^ Styve 1994, p. 41
  10. ^ Styve 1994, p. 43
  11. ^ a b c Styve 1994, p. 44
  12. ^ Styve 1994, p. 42
  13. ^ Styve 1994, p. 45
  14. ^ a b Styve 1994, p. 46
  15. ^ "Nordhordland Bridge". Structurae. Retrieved 17 January 2011.
  16. ^ "Nordhordland Cable-Stayed Bridge". Structurae. Retrieved 17 January 2011.
  17. ^ a b Hitch, Stephen J. (1999). The Evergreen Point Floating Bridge in Crisis: An Approach to Evaluating Alternative Solutions. University of Washington.
  18. ^ Rødland 2000, p. 55
  19. ^ Rødland 2000, p. 56
  20. ^ Lindebrotten, John (26 June 1999). "Knusande siger til Statens vegvesen". Bergens Tidende (in Norwegian). p. 7.
  21. ^ Bjørlo, Randi (22 September 2004). "10 år sidan opninga". Nordhordland (in Norwegian). Archived from the original on 24 July 2011. Retrieved 17 January 2011.
  22. ^ Reina, Peter (7 March 1994). "Box Girders Float Across a Fjord". Engineering News Record. 232 (10): 24–26.
  23. ^ Vaage, Atle (31 December 2005). "Brua er gratis". Nordhordland (in Norwegian). Archived from the original on 24 July 2011. Retrieved 17 January 2011.
  24. ^ a b Kvile, Geir (20 December 2010). "–Bompenger til evig tid". Bergensavisen (in Norwegian). p. 10.
  25. ^ Norwegian Public Roads Administration (2010). "ÅDT nivå 1-punkt Hordaland" (in Norwegian). p. 33. Archived from the original on 17 January 2011. Retrieved 17 January 2011.
  26. ^ "Kan bli Norges vakreste bru". Bladet Tromsø (in Norwegian). 7 July 2010. p. 11.
  27. ^ Vaage, Atle (31 March 2008). "Bompengar i Mongstadkrysset". Nordhordland (in Norwegian). Archived from the original on 24 July 2011. Retrieved 17 January 2011.
  28. ^ Vaage, Atle (13 March 2009). "Nyborgtunnelen kjem innan ti år". Nordhordland (in Norwegian). Archived from the original on 24 July 2011. Retrieved 17 January 2011.

Bibliography

Read other articles:

جوزدان (بالفارسية: جوزدان)‏  تقسيم إداري البلد  إيران[1] المحافظة أصفهان المقاطعة مقاطعة نجف آباد الناحية Central خصائص جغرافية إحداثيات 32°33′24″N 51°22′21″E / 32.55667°N 51.3725°E / 32.55667; 51.3725 الارتفاع 1626 متر  السكان التعداد السكاني 6393 نسمة (إحصاء 2006)   • الذكور 35...

 

KejoraSingel oleh Lesti Andryanidari album D'Academy 2014Dirilis6 Juni 2014 (2014-06-06)FormatDigital downloadDirekam2014GenreDangdutDurasi5:29LabelTrinity Optima ProductionPenciptaNurbayanProduserYonathan Nugroho Kejora adalah lagu yang dinyanyikan oleh penyanyi dangdut lolosan D'Academy asal Cianjur Lesti Andryani.[1] Lagu ini merupakan debut singlenya dan masuk dalam debut album kompilasi yang berjudul D'Academy 2014. Single ini dirilis setelah ia memenangkan kompetisi tersebu...

 

2018 film directed by Barry Jenkins If Beale Street Could TalkTheatrical release posterDirected byBarry JenkinsScreenplay byBarry JenkinsBased onIf Beale Street Could Talkby James BaldwinProduced by Adele Romanski Sara Murphy Barry Jenkins Dede Gardner Jeremy Kleiner Starring KiKi Layne Stephan James Colman Domingo Teyonah Parris Michael Beach Dave Franco Diego Luna Pedro Pascal Ed Skrein Brian Tyree Henry Regina King CinematographyJames LaxtonEdited by Joi McMillon Nat Sanders Music byNichol...

This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: The Devil Inside Me – news · newspapers · books · scholar · JSTOR (August 2014) (Learn how and when to remove this template message) 2011 filmThe Devil Inside MeFilm posterTraditional Chinese奪命心跳Simplified Chinese夺命心跳Hanyu PinyinDuó Mìng Xīn TiàoJyutping...

 

Pour les articles homonymes, voir Lauder. Estée Lauder Siège d'Estée Lauder dans le General Motors Building à New York Création 1946 (77 ans) Fondateurs Estée Lauder, Joseph Lauder Forme juridique Corporation Action NYSE : EL Siège social New York États-Unis Direction Fabrizio Freda (PDG)William Lauder (président non exécutif) Actionnaires Famille Lauder : 38 % du capital et 86 % des droits de vote Activité Luxe et cosmétiques Produits Mode, maroquine...

 

Sci-HubJenis situsBerbagi berkasBahasaInggrisRusiaDidirikan5 September 2011; 12 tahun lalu (2011-09-05)[1]PemilikAlexandra Elbakyan[1]Situs websci-hub.ruKomersialTidakDaftar akunTidakDiluncurkan5 September 2011; 12 tahun lalu (2011-09-05)[2]StatusAktifLisensi kontenMenyediakan konten tanpa memperhatikan hak cipta Templat:File sharing sidebar Sci-Hub adalah situs web perpustakaan bayangan yang menyediakan akses gratis ke jutaan makalah dan buku penelitian, tan...

1990 single by The BelovedTime After TimeSingle by The Belovedfrom the album Happiness B-sideRemixReleased1990Genre Electronic music alternative dance downtempo Length4:05Songwriter(s)Jon MarshProducer(s)Martyn PhillipsThe Beloved singles chronology Your Love Takes Me Higher (1990) Time After Time (1990) It's Alright Now (1990) Music videoTime After Time on YouTube Time After Time is a 1990 song by British electronic music group The Beloved, released as the fifth and last single from their se...

 

سفارة لبنان في الولايات المتحدة لبنان الولايات المتحدة   الإحداثيات 38°55′21″N 77°03′22″W / 38.9225°N 77.0561°W / 38.9225; -77.0561  البلد الولايات المتحدة[1][2]  المكان واشنطن[3][4][2]  الموقع الالكتروني الموقع الرسمي  تعديل مصدري - تعديل   سفارة لبنا

 

Danuta Hołowińska Data urodzenia 4 maja 1948 Wzrost 182 cm Dorobek medalowy Mistrzostwa Polski złoto Warszawa 1970 skok wzwyż złoto Warszawa 1972 skok wzwyż złoto Warszawa 1974 skok wzwyż srebro Zielona Góra 1968 skok wzwyż srebro Kraków 1969 skok wzwyż srebro Warszawa 1971 skok wzwyż srebro Bydgoszcz 1975 skok wzwyż srebro Bydgoszcz 1976 skok wzwyż Danuta Hołowińska z d. Konowska (ur. 4 maja 1948 w Szprotawie) – polska lekkoatletka, skoczkini wzwyż, mistrzyni i ...

Эмблема национального проекта «Здоровье» Национальный проект «Здоровье» — программа по повышению качества медицинской помощи, объявленная президентом Российской Федерации Владимиром Путиным, стартовавшая 1 января 2006 года в рамках реализации четырёх приоритетных ...

 

Sandalwood(Kannada) cinema 1930s 1940s 1950s 1960s 1960 1961 1962 1963 19641965 1966 1967 1968 1969 1970s 1970 1971 1972 1973 19741975 1976 1977 1978 1979 1980s 1980 1981 1982 1983 19841985 1986 1987 1988 1989 1990s 1990 1991 1992 1993 19941995 1996 1997 1998 1999 2000s 2000 2001 2002 2003 20042005 2006 2007 2008 2009 2010s 2010 2011 2012 2013 20142015 2016 2017 2018 2019 2020s 2020 2021 2022 2023 2024 vte A list of Kannada language films produced in the Kannada film industry in India in 2015...

 

Head of the Catholic Church from 705 to 707 For the Coptic pope, see Pope John VII of Alexandria. PopeJohn VIIBishop of RomeByzantine Mosaic of John VII, from about 705ChurchCatholic ChurchPapacy began1 March 705Papacy ended18 October 707PredecessorJohn VISuccessorSisinniusPersonal detailsBorn650Rossano in Calabria, Byzantine EmpireDied(707-10-18)18 October 707 (aged 56 – 57)Other popes named John Pope John VII (Latin: Ioannes VII; c. 650 – 18 October 707) was the bishop of R...

2010 single by Yolanda Be Cool and DCUP We No Speak AmericanoSingle by Yolanda Be Cool and DCUPReleased27 February 2010Recorded2008GenreElectro swing[1][2]house[3]Length4:29 (original version)2:58 (radio edit)2:11 (UK radio edit)LabelSweat It Out!Songwriter(s)Johnson PetersonSylvester MartinezDuncan MaclennanRenato CarosoneNicola SalernoProducer(s)Yolanda Be CoolDCUPYolanda Be Cool singles chronology Holy Cow (2009) We No Speak Americano (2010) Le Bump (2011) We No...

 

Segment on the Krofft Supershow WonderbugC.C., Susan, Barry, and WonderbugGenreSuperhero[1]Created byJoe RubyKen Spears[2]StarringDavid LevyJohn-Anthony BaileyCarol Anne SeflingerVoices ofFrank WelkerComposerJimmie HaskellCountry of originUnited StatesNo. of episodes22ProductionProducerSid and Marty KrofftRunning time0:15 (per episode)Production companiesSid and Marty Krofft Television ProductionsOriginal releaseNetworkABCReleaseSeptember 11, 1976 (1976-09-11) –Sep...

 

Historic district in Oklahoma, United States United States historic placeBuena Vista Park Historic DistrictU.S. National Register of Historic PlacesU.S. Historic district Show map of OklahomaShow map of the United StatesLocationRoughly bounded by W. 18th St. S, rear lot lines of E of S. Cheyenne Ave. W, W. 21st St. S and Riverside Dr./S, Carson, Tulsa, OklahomaCoordinates36°8′5″N 95°59′24″W / 36.13472°N 95.99000°W / 36.13472; -95.99000Area5 acres (2.0 ...

American baseball player (1928-2005) Baseball player Bob LennonOutfielderBorn: (1928-09-15)September 15, 1928Brooklyn, New YorkDied: June 14, 2005(2005-06-14) (aged 76)Dix Hills, New YorkBatted: LeftThrew: LeftMLB debutSeptember 9, 1954, for the New York GiantsLast MLB appearanceMay 11, 1957, for the Chicago CubsMLB statisticsBatting average.165Home runs1Runs batted in4 Teams New York Giants (1954; 1956) Chicago Cubs (1957) Career highlights and awards Hit 6...

 

Indian actress Usha KiranUsha Kiran in Baadbaan (1954)Born(1929-04-22)22 April 1929Hyderabad, British IndiaDied9 March 2000(2000-03-09) (aged 70)Nashik, Maharashtra, IndiaOccupationActressYears active1949–2000SpouseManohar KherChildrenTanvi Azmi, Advait KherRelativesBaba Azmi (son-in-law)Saiyami Kher (granddaughter) Usha Kiran (22 April 1929 – 9 March 2000) was an Indian actress. In a career spanning over four decades, she acted in over 50 Hindi and Marathi films, notably Daag (...

 

Paris JacksonLahirParis-Michael Katherine Jackson3 April 1998 (umur 25)Beverly Hills, California, Amerika SerikatPekerjaanModelaktrismusisi[1]Tahun aktif2003–kiniInformasi modelingTinggi176 m (577 ft 5 in)Warna rambutCoklatWarna mataBiru-kehijauanManajerIMG Models (New York, Paris, Milan, London, Sydney)[2] Orang tuaMichael JacksonDebbie RoweKeluargaJackson Paris-Michael Katherine Jackson (lahir 3 April 1998) adalah seorang model,[3][4 ...

Pier in Kowloon, Hong Kong There is only one ferry route to North Point in Kowloon City Ferry Pier Kowloon City Ferry Pier The neighbouring Ma Tau Kok Public Pier Kowloon City Ferry Pier (Chinese: 九龍城碼頭) is a ferry pier in Ma Tau Kok, Kowloon, Hong Kong. It is at the north of Hoi Sham Park and the east of East Kowloon Corridor.[1] History The pier started operation in 1956 and was the first permanent pier in Hong Kong built after World War II. It had ferry services to Wa...

 

اقتحام السفارة الإسرائيلية في القاهرة 2011 المكان 30°01′43″N 31°13′01″E / 30.028666666667°N 31.216944444444°E / 30.028666666667; 31.216944444444  تعديل مصدري - تعديل   30°01′43.20″N 31°13′01″E / 30.0286667°N 31.21694°E / 30.0286667; 31.21694 متظاهرون مصريون يحتجون أمام السفارة الإسرائيلية نُفّذ اقتحام ال...

 

Strategi Solo vs Squad di Free Fire: Cara Menang Mudah!