Railway line in China
Ningbo–Jinhua railway
|
---|
|
Status | Under construction |
---|
Termini | |
---|
|
Type | Heavy rail |
---|
|
Line length | 188.3 km (117 mi) (Yunlong to Yiwu)[1] |
---|
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
---|
Operating speed | 160 km/h (99 mph) |
---|
The Ningbo–Jinhua railway is a double-track railway currently under construction in China. It is a combined passenger and freight railway. The railway is 188.3 kilometres (117.0 mi) long with 9 stations, and has a design speed of 160 kilometres per hour (99 mph).[1][2] The railway is one of the first purpose built electrified railways capable of operating double stack container trains in China.[3]
History
Construction began on 29 December 2016.[4]
Stations
The line has the following stations:[1]
References