The wind farm received consent in 2014,[1] and received support under the Contracts for Difference (CfD) scheme at £57.50/MWh (2012 prices) in 2017.[2]
The wind farm began exporting power in June 2021.[3] The final turbine was installed in September 2021.[4]
The wind farm includes 100 9.5 MW turbines from Vestas for a total generating capacity of 950 MW. The wind farm uses three 220 kV AC export cables to transmit generated power to the national grid.[6] The operations and maintenance base for the wind farm is located in Fraserburgh.[7]