The Mahoba–Khajuraho branch line was inaugurated on 26 December 2008 by then Minister of RailwaysLalu Prasad Yadav, and the Khajuraho–VGLJ Link Express was the first train run on this track. On the same day Khajuraho railway station also inaugurated. The first train to pass through this rail line was Khajuraho VGLJ Link Express (train no. 230A). Facts about train line:
Length: 65.15 km
Cost: 130 crore
First train: Khajuraho–Jhansi Link Express (train no. 230A)
It is a part of North Central Railway, PRAYAGRAJ.[2]