You can help expand this article with text translated from the corresponding article in Hungarian. Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Hungarian Wikipedia article at [[:hu:M7-es autópálya (Magyarország)]]; see its history for attribution.
You may also add the template {{Translated|hu|M7-es autópálya (Magyarország)}} to the talk page.
The motorway connects with the Croatian motorway A4 at Goričan and forms part of the Pan-European corridor Vb, connecting Budapest with Zagreb, the capital of Croatia, and Rijeka, the largest Croatian seaport. Since the completion of the M7 it is possible to travel on motorway from Budapest to the Adriatic Sea, a popular tourist destination for Hungarians.
The last portion of the motorway to the Croatian border, including the Zrinski Bridge on the river Mura, was completed on 22 October 2008. The road's first sections were built in the 1960s and 1970s. The completion of the last sections was undertaken since 2001.
Openings timeline
Budapest – Budaörs (7 km): 1964 - half profile; (this section was extended 2x3 lane in 1978-79)
Budaörs – Martonvásár (18 km): 1966 - half profile; (this section was extended in 1972; 2x3 lane in 2001)
Martonvásár – Velence (15 km): 1967 - half profile; (this section was extended in 1973; 2x3 lane in 2001)
Martonvásár – Székesfehérvár (12 km): 1968 - half profile; (this section was extended in 1973; 2x3 lane in 2001)
Székesfehérvár – Balatonaliga (33 km): 1970 - half profile; (this section was extended in 1975)
Balatonaliga – Zamárdi (22 km): 1971 - half profile; (this section was extended in 2001)
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can.(November 2021)
Distance from Zero Kilometre Stone (Adam Clark Square) in Budapest in kilometres.
The route is full length motorway. The maximum speed limit is 130 km/h, with (2x2 lane road with stop lane).