You can help expand this article with text translated from the corresponding article in Chinese. (November 2022) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at [[:zh:乌鲁木齐地铁1号线]]; see its history for attribution.
You may also add the template {{Translated|zh|乌鲁木齐地铁1号线}} to the talk page.
Line 1 has a total length of 27.615 km[1] and 21 stations.[1][3] It is fully underground.[2]
History
The 27.615 kilometer[1] long, 21 station line commenced construction in March 2014.[4] Tunneling works were completed in December 2017. The northern section of Line 1 (16.5 km[2]) opened on 25 October 2018. The southern section of Line 1 (11.1 km[2]) opened on 28 June 2019.[1]