You can help expand this article with text translated from the corresponding article in Vietnamese. (May 2019) Click [show] for important translation instructions.
View a machine-translated version of the Vietnamese article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Vietnamese Wikipedia article at [[:vi:Cầu Vàng]]; see its history for attribution.
You may also add the template {{Translated|vi|Cầu Vàng}} to the talk page.
The Golden Bridge (Vietnamese: Cầu Vàng) is a 150-metre-long (490 ft) pedestrian bridge in the Bà Nà Hills resort, near Da Nang, Vietnam.[1][2] It is designed to connect the cable car station with the gardens (avoiding a steep incline)[3] and to provide a scenic overlook and tourist attraction. The bridge loops nearly back around to itself and has two giant hands, constructed of fibreglass and wire mesh, designed to appear like stone hands that support the structure.
The client for the project was the Sun Group.[3] The bridge was designed by TA Landscape Architecture (under Ho Chi Minh City University of Architecture), based in Ho Chi Minh City. The company's founder, Vu Viet Anh, was the project's principal designer, with Trần Quang Hùng as the bridge designer and Nguyen Quang Huu Tuan as design manager. Construction began in July 2017 and was completed in April 2018;[4] the bridge opened in June 2018.[5][6]