Expressway in Poland connecting Piotrków Trybunalski, Kielce, Sandomierz and Nisko
You can help expand this article with text translated from the corresponding article in Polish. Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Polish Wikipedia article at [[:pl:Droga ekspresowa S74 (Polska)]]; see its history for attribution.
You may also add the template {{Translated|pl|Droga ekspresowa S74 (Polska)}} to the talk page.
The first 6.9 km (4.3 mi) long section near Kielce was constructed from May 2009 to December 2011. The rest of the route is planned to be fully completed by 2030.[1]