Dollands Moor has eight roads in the yard with an additional five roads which are through lines and run-round loops. All lines are electrified at 25 kV overhead wires and connections to the west of the yard are also dually electrified with a third rail (750 V). This is to allow access to the South-Eastern Main Line at Saltwood Junction just to the east of Sandling Station. Dollands Moor was operated by Railfreight Distribution from its opening, then EWS and now DB Cargo UK. Other freight operators pass through the yard, but do not stop there.
The function of Dollands Moor is for locomotive and crew changes rather than marshalling.[1] Most trains operating from Dollands Moor are of the Trainload variety and if any marshalling is required, this was historically undertaken at European Freight Operating Centre in Wembley, but with the drawdown of the Wagonload network in the UK[2] they now go to Didcot. At the time of writing (October 2015) just one Fridays only working Wagonload train goes through Dollands Moor to Didcot [3][needs update]
The lines from Dollands Moor and the Channel Tunnel Rail Link are measured in kilometres whereas Network Rail lines are measured in miles and chains.[4]
Migratory activity
This section needs to be updated. The reason given is: because these articles are more than 15 years old.... Please help update this article to reflect recent events or newly available information.(November 2018)