The current park-and-ride facility is located on a sliver of land in between Minnesota State Highway 610 and Foley Boulevard. It has 3,200 parking spaces with a surface lot and a two-story parking ramp, giving it more than four times the capacity of the largest existing Northstar station, Elk River (754 spaces).[2][5] Despite the fact that it already existed and would be a significant source of riders, calculation of the cost-effectiveness index was biased toward saving time of commuters. Riders would not save enough time by changing from the existing bus service to rail, so the station was dropped.[4]
Anoka County and the city of Coon Rapids have been acquiring land and making arrangements for matching funds for the station. It is expected to cost approximately $15 million to build the station. Construction will likely occur along with a related project to add a third set of rails along this stretch of track, which is the busiest in Minnesota. The third main line will allow additional passenger rail traffic, including the proposed Northern Lights Express project to connect to Duluth. The station will serve both lines, since it is nicely located just south of Coon Creek Junction where the BNSFHinckley Subdivision branches off of the Staples Subdivision main line.[3][6]
^ abMinneapolis-Duluth/Superior: Restoration of Intercity Passenger Rail Service Comprehensive Feasibility Study and Business Plan (ch. 1–2, ch 3, ch 4–10, appendices). Transportation Economics & Management Systems, Inc., December 2007. Accessed December 18, 2009.